国产精品人人爱一区二区白浆_国产我不卡午夜伦理_免费电影亚洲一级黄片_国产午夜福利久久_51视频在线观看免费国产_天堂AV网手机版_国产精品毛片一区二_印度女人性液_日韩大片91免费观看视频播放_日本欧美国产精品第一页久久

手機(jī)版
1 2 3 4
首頁 > 新聞中心 > 行業(yè)新聞 >
行業(yè)新聞

上海翻譯公司完成工程類英文翻譯

發(fā)布時(shí)間:2018-03-16 08:52  點(diǎn)擊:

上海翻譯公司完成工程類英文翻譯
SPECIFICATION FOR SITE OFFICE AND SIGN BOARD GENERAL  PRICING PREAMBLE
BILL OF QUANTITIES
 
SITE WORK AND PRELIMINARIES ROADWORKS
ELECTRICAL WORKS TELECOM DUCTING WORKS SECURITY DUCTING WORKS WATERWORKS
STORM WATER WORKS SEWERAGE WORKS IRRIGATION WORKS LANDSCAPING WORKS
 
SECTION 5
 
SECTION 6
 
SUMMARY OF THE BILL OF QUANTITES (S) DAY WORK SCHEDULE (DW)
 
(a) Manpower
 
(b) Material
 
(c) Equipment
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
Abu Dhabi Police GHQ- Police Projects Committee intends to construct the main infrastructure of the new  Training  Village  at  Al  Hafar.  The pro 丿 ect site is  approximately  1.0  km  by  2.0 km located
approximately 6 km north of Abu Dhabi - Al Ain highway, refer to site location map & Key plan drawings contained in Vol.4 of the tender documents. The project consists of the following zones:
. ZONE A -  Main Administration
. ZONE B - Maintenance and Services
. ZONE C - lndoo 「 Ranges
. ZONE D -  Public Order
. ZONE E - Arms and Explosives
. ZONE F -  Urban Zone
. ZONE G -  Prison Zone
. ZONE I - Anti Narcotics
. ZONE J - Crime Scene ZONE K - Dog Training ZONE L -  F7 Zone
. ZONE M -  Driver Training
. ZONE 0-AirWing Zone
The scope of work includes supply, install, construct, test and commission of the main infrastructure which includes the following disciplines:
 
 
The earthwork for the entire project was part of a separate contract, however Contractor is required to undertake the earthwork related to the installation of the specific infrastructure as per the Tender Documents and the authorities general and standa「ds and guidelines.
 
The scope of work is detailed further in the following sections.
 
Contractor shall read this document in conjunction with the full set of the Tender Documents which includes Tender Drawings and shall comply in all respect to the requirements of the relevant service departments/authorities for these wo「ks.
 
The existing services, if shown, on the drawings are for information purposes only and do not necessarily show exact locations, depths, spacing, smaller branches of utilities and services which are not normally indicated on such drawings, nor the possible existence of other underground utilities and services.
 
The Contractor shall be responsible for investigating the soil / ground conditions and shall make all the necessary soil investigation and subsurface investigation as he may require to fully familiarize himself  with the  properties  of  the  soil and  shall be deemed  to  have included  in  his  tender all
materials, plant services, labour and provisions as may be required for all earthwork to complete the Works.
 
The Contractor shall provide all necessary protection for the existing services as may be requ「i ed by his works operations and to the satisfaction of the owning authorities and the Engineer
 
The Contractor shall carry out all the necessary tests to establish the suitability of the borrow materials, the placed borrow material and the ground exposed as a result of the cut operation shall be evenly compacted in accordance with the relevant terms of the specifications and as directed by the engineers
 
Infrastructure Disciplines:
 
1. Road Works
 
Abu Dhabi Police Training Village (ADPTV) will be constructed on pre-graded area of approximately 1.00km x 2.00km. Grading of village is part of separate contract. Road works include tying into existing road, earthwork, signs and marking, roadside furniture, footpath/sidewalk and other related
construction. Construction shall be according to the drawings & specification included with this tender.
 
Roadway construction shall consist of asphaltic wearing course, asphalt binder course, asphalt concrete base course, aggregate base and granular sub-base. Signage to be provided shall include warning, regulatory signs appropriate to traffic construction: in addition to temporary sign required during construction period. Roadway construction is under this tender is only limited to the entrance of each zone/plot, any details inside the plots even if shown on the drawing shall be considered fo 「information only.
 
Summary of scope of road works includes but not limited to the following
 
13.00 km of single carriageway
 
1.20 km of dual carriageway with
 
1.60 km of access road to utilities building
 
2 no. new access from exiting/upgraded road to ADPTV.
 
2.00m wide footpath/walkway along the road.
 
30 no.s raised pedestrian crossings
 
48 no.s of speed control hump
 
Road signs and marking
 
FOR TENDER ONLV
'""'°"' I  旦 CT
TE巳ODIN M.E . Ltd.
 
 
 
2. Telecom and Electrical Works
 
2.1 11kV Network
 
Supply, install, test and commission the 3CX300 sq.mm Cu/XLPE 11KV cable as per ADDC specifications, from 33/11kV primary station outside the village up to Ring main unit in each distribution substation as per the drawings.
 
Supply, install, test and commission the 3CX120 sq.mm Cu/XLPE 11kV cable as per ADDC 的 m Ring main unit up to the transformer as per the d「awings.
 
Supply, install , test and commission 32 core Fibre optic cable from 33/11 kV primary station outside the village up to Ring main unit in each distribution substation as per the drawings.
 
Supply and install the Fiber optic cable chambers as per the drawings and as per ADDC standards.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADDC, client and other authorities.
 
All the substation equipments, as per pro 」ect requirement shall be supplied and installed by the contractor as per ADDC requirement.
 
Supply, install, test and commission distribution transformers, RMUs, earthing of the equipments, and all necessary fitments including connections to the EFls as per ADDC specification and drawings.
 
All the protection requirements including but not limited to protection setting calculations shall be provided by the contractor as per ADDC specifications.
 
 
 
2.2 Street Lighting System
 
Supply, install, test and comm1ss1on the 3CX10 sq.mm Cu/XLPE cable as per ADM specifications from street lighting control cabinet to street lighting poles as per the drawings.
 
Supply, install, test and commission the street lighting system including street lighting control cabinets, street lighting poles and light fixtures with all the necessary fitments as per ADM specifications, as pe 「 the drawings.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADM, client and other authorities.
 
Street lighting system should be fed from the substationTRM04/M. All the LV cables required to be laid between the substation LV panel and the service cabinets should be supplied and installed by the contractor.
 
All the substation equipments shall be supplied and installed by the contractor as per ADDC requirement and as per project requirements.
 
 
 
2.3 Telecom
 
Supply and install the 4-way telecom ducts as per the drawings
 
Supply and install the JRC-12 and JRC-14 manholes as per the drawings
 
Contractor shall supply and install all the cables of telecom system.
 
Preparation of shop drawings and as-built drawings as per the requirements of Etisalat and client.
 
 
 
2.4 Structured Cabling System
 
Supply and install the 9-way security ducts, JRC-12 and JRC-14 manholes and all the cables of structured cabling system as pe「 the drawings and specifications.
 
Construct the Police Main IT building as per the details indicated in the specification and drawings as per project requirement including but not limited to raised floor, cable trays, etc. as
pe「 GHQ specifications as per project requirements.
 
Contractor shall supply, install, test and commission Tetra tower system with all the associated works including the power as per the drawings, specification and project requirement.
 
Preparation of shop drawings and as-built drawings as per the client's requirements.
 
2.5 LV Network
 
Supply, install, test and commission LV service cabinets including earthing and necessary fitments as per ADDC specifications and drawings. The arrangement to feed the  service cabinets from the LV panel in TRM-04 M is also included in the SCOPE. This shall also include supply install test and commission the LV cables as per the ADDC specifications and RSB guide lines. All the necessary calculation to justify the cable size shall be provided by the contractor
 
Supply, install, test and commission 4CX95 sq.mm Cu/XLPE cables as per ADDC/ADM specifications to feed the street lights control cabinets from the service cabinets as per the drawings and as per the drawings.
 
Preparation of shop drawings and as-built drawings as per the requirements of ADDC, client and other authorities.
 
3. Water Works
 
The scope of for water works shall include but not limited to the following:
 
Supply, installation and construction of new 0D250 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents including all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works as per the details indicated in the specification and drawings
 
Supply, installation and construction of new 0D180 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply, installation and construction of new 0D160 HOPE Pipeline of within the approved pipeline route as pe 「 the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply, installation and construction of new 00110 HOPE Pipeline within the approved pipeline route as per the details indicated in the Tender Documents with all necessary fittings, Isolation Valves, Washouts, etc., including associated Civil and Earth Works.
 
Supply  and installation  of  all  necessary  fittings,  gate  valves,  contro.l  valves ,  Electromagneitc flow meters and 閑 ated accessories as per the details indicated in the Tender Documents.
 
Supply and construction of Road Crossing ducts (concrete encased GRP ducts) as per the details indicated in the Tender Documents.
 
All necessary connections/disconnections to be made between the new/relocated waterlines and the existing system as per the details indicated in the Tender Documents
 
Construction  of  Civil  works  including  valve  chambers,  bulk  consume「  chambers, fire hydrant boxes, protection slabs, water ducts at road crossings, sign posts and marker posts all as pe 「the details indicated in the Tender Documents.
 
Supply and construction of reinforced concrete slabs for waterline under roads and parking areas as per the details indicated in the Tender Documents and/o「 directed by the ENGINEER.
 
Carryout all required safety measures and temporary facilities for pedestrian and vehicles according to HSE requirements and procedures to ensure public safety during the execution of the project.
 
Removal, shifting or transplantation of the trees/plants in conflict with waterline route to the locations as approved by the concerned authorities
 
 
 
Removal and reinstatement of tiles, green and asphalt area, etc.
 
Successfully conducting the preliminary and final hydraulic pressure testing, disinfecting and flushing of the completed waterlines prior to commissioning and connection/disconnection to the existing water network system.
 
With respect to construction, testing, sterilising and commissioning etc. the following shall be taken into consideration:
 
o All construction work shall be conducted with the minimum possible disturbance of the water supply serving consumers who are already connected to the existing system.
 
o The CONTRACTOR shall liaise fully with the ENGINEER and ADDC in order to temporarily shut down existing live pipelines  if necessa ry, in order to carry out the WORKS.
 
All other associated works necessary to successfully  complete all above works
 
 
 
4. Storm Water
 
The objective of the storm wate 「 system of Abu Dhabi Police Training Village is to provide cost efficient means of collecting and disposing storm water run-off to a suitable location (Pond / Lagoon) to prevent flooding as a result of rainfall event as shown in the Tender Documents and bill of quantities.
 
There is existing storm water system (collection & disposal) within and adjacent to the project area and a proposed storm water system to be provided in the future. Howeve 「 Contractor is responsible to examine the area and obtain any information from the authorities on potential existing utilities
befo「e excavation.
 
4.1 Storm water system - Pipes & Manholes
 
The storm water system mainly is divided to two pipelines connected to each others:
 
Collection Lines:
 
Normally have pipe dia. of 300mm with average slope of 0.5%. The collection lines shall have rectangular chambers to be installed as inlets. Majorly, two types of inlets are available in network; Inlet chamber & Catch-basins. Both chambers shall have it own arrangement  in supply, excavation & installation. The required chambers a「 e proposed to be installed in two different locations, on curb edge as kerb inlet and the other within road way as flush inlet
 
Main Lines: Varies as followinq:
 
1. 300, 400 & 500mm diameters-uPVC at average depths of 1.0 - 4.0m with average slope of 0.25%, 0.17% & 0.15%, respectively. The manholes proposed along these pipes are storm water circular manholes (Type-4) with internal dia. of 1.1m. the average distances between manholes aren't exceeding 1OOm , maximum.
 
2. 600, 700 & 800mm diameters-GRP at average depths of 1.0 - 3.0m with average slope of 0.14%. The manholes proposed along these pipes a「 e storm water rectangular manholes with circular  shafts (Type-5)  with internal dia. of 1.1m and intermediate slap as per ADM
standa「ds. The average distances between manholes aren't exceeding 120m, maximum.
 
4.2 Retention / Infiltration Pond:
 
The proposed SW pond is located at North/East corner of PTV area. The pon.d shall work as retention / infiltration pond for the expected amount of flow conveyed through SW pipelines. The out fall pipe discha 「 ging to the pond shall has non-return valve (Flap valve) at its open end. uPVC perforated  pipes  are proposed  surrounding  the  pond  circumference in  order  to  filtrate  SW into
su「r ounding natural ground.
 
5. Sewerage Works
 
The sewerage network of ADPTV is designed to deal with the estimated peak flow  from all zones and to collect the sewage into the temporary proposed holding tank. The collected sewage shall be transferred by tankers to the nearest existing STP in coordinatoi n and approval of the ADSSC.
 
Sewage generated from each zone wilt be collected via manholes insfalled at each zone boundary, then discharging the collected sewage by a system of gravity sewers and manholes into the holding tank. Due to the excessive depth of the inlet pipe of the holding tank, a lifting station is proposed to lift the sewage and discha「ge into the holding tank.
 
The sewerage network contains the following components:
 
5.1 Sewerage Pipelines and Manholes
 
The material of sewerage pipelines is uPVC with diameter varies from  160mm  to 300mm. One typical manhole with internal diamete「 of 1.50m is used.
 
The contractor shall provide / include in his construction works the main supply pipe up to the boundary limit (fence) of the current development providing end cap for future connection
 
5.2 Pump Stations
 
One pumping station is required. The pumping station has 1 duty and 1 standby sub mersible pump installed within a wet well receiving sewerage from a gravity collection network and discharging the flow into the discharge chamber then throughgravity sewers to the holding tank.
 
The type of the station will be type 1 as the flow is less than 100 I/sec.
 
The pumps are selected to delive 「 the required flow at calculated total head. Pumps are of submersible type with non-clogging mixed-flow impellers. Pumps and motor drives are selected to satisfy the final design flow. The internal diameter of the wet well will be 3.2 m as shown in tender drawings.
 
5.3 Holding tank
 
A temporary holding tank is to be constructed in the north side of ADPTV. The holding tank is divided into two compartments.  It will be furnished with inlet pipe receiving flow from the discharge chamber In addition, outlet pipe will be provided and furnished with end cap/plug to allow for future connection once the planned sewerage treatment plant is completed and operated
 
6. Irrigation Works
 
lrriHation Network
 
The scope of works comprises the installation and testing of the irrigation network of the training village as detailed in the Tender Documents. Contractor shall install all the necessary irrigation appurtenances complete in all respect as per drawing details and specificationas follows:
 
1. DN250mm dia. Pipe Class-D (1O")
 
2. DN200mm dia. Pipe Class-D (8")
 
3. DN100mm dia. Pipe Class-D C4")
 
4. DN75mm dia. Pipe Class-D (3")
 
5. DN50mm d舊.Pipe Class-D (2")
 
6. DN38mm dia. Pipe Class-D (1-1/2")
 
7. DN25mm dia. Pipe Class-E (1")
 
8. DN250mm gate valve (1O")
 
9. DN200mm gate valves (8")
 
10. DN100mm gate valves (4")
 
11. DN100mm Zone demand points (4")
 
12. 2" Air-Vacuum valves
 
13. 4" Wash-out valves
 
14. Irrigation decoder cables (AWG #14)
 
15. 4 Station stand alone type controller at the main entrance roundabout
 
16. 1" solenoid valves along the main entrance road
 
17. Drippers and dripline tubing along the main entrance road lrriqation Tank and Pump Room:
The  irrigation  tank  and  pump  room  shall  be  for  future  installation,  howeve「, the  contractor  shall provide/ include in his construction works the main supply pipe (DN250mm) up to the boundary lim 仆(fence) of  the current development  and provide pvc end cap  fo 「 future connection
 
Additional Contractor's scope of work is installation/ construction of the following:
 
 
 
Page 10 of 13
 
 
 
1. DN75mm (3") pvc solenoid valve risers with end cap
 
2. DN25mm (1") pvc quick coupling valves risers/connection with end cap
 
3. Termination of decoder cables at the proposed location of decoder cont「olle「s and the proposed location of solenoid valve risers.
 
4. Provision, installation, testing and commissioning of standard 4 station cont 「 olle 「 at the main entrance road
 
5. p 「 ovision, installation, testing and commissioning of 1" solenoid valves at the main entrance road
 
6. Provision, installation, testing and commissioning of irrigation cables at the main entrance road
 
7. Provision, installation, testing and commissioning of drippers and dripline tubing at the main entrance road
 
The main irrigation network is for futu「e utilization in anticipation when treated sewage effluent (TSE) irrigation water shall become available at the fac小ty. The Contracto「 therefore, shall take every steps and consideration to install the main irrigation network in its fullness, whereby future excavation shall be avoided, except for the installation of the solenoid valves, the two (2) decoder controllers, quick coupling valves, the secondary and tertiary irrigation lines downstream of the solenoid valves.
 
 
 
7. Landscape Works
 
The landscape works shall comprise of soft and hardscape works. The quantity of the landscape drawings have been modified to address the unavailability of treated sewage effluent irrigation water. The modification involves the replacement of softscape with gravel mulching and ornamental pebbles.
 
The only place for softscape is in the main entrance  road of the tac 仆 ity. The 「 est of the previous  area of  softscaping  works are now replace with ornamental  pebbles and gravel mulching.
 
The softscape  works  at  the  main entrance road  comp「ises of  installation and maintaining  for one year the plantation as follows:
 
1. Palm Trees = 9 nos
 
2. Ornamental Trees = 26 nos
 
3. Shrubs and ground cover   = 785 m2
 
Estimate of the gravel mulching quantities to be laid in place of the softscape works are as follows:
 
1. Type 1 Ornamental Pebbles= 450 m3
 
2. Type 2 Ornamental Pebbles= 210 m3
 
3. Type 3 Ornamental Pebbles= 230 m3
 
4. Type 4 Ornamental pebbles= 270 m3
 
 
5. Type 1 Gravel mulch
 
6. Type 2 Gravel mulch
 
7. Type 3 Gravel mulch
 
= 2,270 m3
 
= 1,280 m3
 
= 650 m3
 
 
The ornamental pebbles and gravel mulch we「e estimated at a depth of 75mm and the above figures are indicative only. Con「t actor shall be responsible in verifying the quantities shown above.
 
Included in tender drawings are the original approved landscape drawings. Cont「actor shall take note to disregard the softscape design in these drawings, Contractor shall consider only the hardscape such as trash bins, benches, walkway and pavements, and water feature details as follows
 
1. Trash Bins details
 
2. Benches details
 
3. Roundabout pavement details
 
4. Pavement and walkway details
 
 
 
5. Water feature details
 
6. Fountain at the roundabout
 
7. Electrical landscape lighting at the main entrance of the facility
 
Contractor shall be responsible in assessing the practicality and complicity of the hardscape design on walkways, pavements, water fountain and water feature and accordingly produce its own shop drawings for final approval.
 
The Contractor shall in his own discretion and experience, consider in his bid items that are not shown / mention in any of the tender documents but are necessary in completing the irrigation and landscape works as envisioned in this tender.
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
 
Temporary offices at the site for government officials and the consultant Staff
 
Number of offices on the site is depending on the number of consultant's supervision staff. The offices area is as follows:
.Authority Representative
 
Soil Laboratory Room:
 
The area of soil laboratory shall be (18 m2) and the area of restroom shall be (2 m2) with add巾onal room of (20 m2) if needed. All the rooms shall be air-conditioned.
 
These areas do not include the corridors.
 
Offices furniture for government officials and the Consultant Staff
 
Government official Office
 
Large desk and desk chair +4 chairs + center table + corner table.
 
Project Manaqer Office
 
Large desk and desk chair+ 2 chair + Sofa set number 4+ center table + corner table + Documents cabinet.
 
su  ervision en  ineer or surve   or materials  en  ineer Offices: Desk and desk cha 「i + 2 chairs + corner table + Documents cabinet A small desk and cha 「i + Documents cabinet
Laboratory
 
Office and Office Chair + 2 chairs + Documents cabinet  
FOR  TENDER ONLV
2 2 OCT 2012 PAR.
,,, .  .   .. .,.,,, L-
TESOOIN M.E. Ltd.
Page 1 of 2
 
Meetinq Room Table+ 8 Chairs
Kitchen
 
12 ft Refrigerator +2 Flame Cooker+ Plates Cabinet+ Cooking and plates tools to serve the supervision staff (minimum number of 6 people)
 
All offices are air-conditioned SPECIFICATION FOR SIGN BOARDS
The specification of the sign board shall be in accordance with the drawing that is enclosed in Contract Drawings Vol. 4.
 
1. The Bills of Quantities he 面 n, including all notes and instructions shall form an integral part of the CONTRACT. However, the descriptions contained in the Bills of Quantities for each item are not necessarily complete. The CONTRACTOR is referred to the CONTRACT and APPENDICES, SPECIFICATIONS and DRAWINGS as well as the relevant Standards and Codes of Practice for further information, as no claim or VARIATION will be considered on account  of the Contractor's failure  to do so.
 
2. The CONTRACTOR shall familiarize himself with all documents comprising the CONTRACT including, but not limited to, the DRAWINGS and SPECIFICATIONS (o 「 any other information that can be reasonably inferred from any of them)  and  all obligations contained  in  the CONTRACT shall be included in the rates and prices entered herein, even if specific items relating to such obligations are not listed in the Bills of Quantities.
 
3. The CONTRACTOR'S unit rates shall be fully inclusive of the work described and must include all related work, accessories or consumable materials , incidental labou 「 , supervision, administration, tools, construction equipment, overheads,  profit and all costs and expenses  that may be required for the completion of the work described, together  with all costs and expenses in complying with all
genera「l isks, liabilities and obligations set forth or implied in the CONTRACT
 
4. DRAWINGS, SPECIFICATIONS and Bills of Quantities and all other CONTRACT Documents a 飛complementary and if any item is included in any of them, it shall be deemed included in all,
 
5. The CONTRACTOR'S lump sum price for the entire WORKS shall provide for the superv 閣 on of any or all t「 ades that are not intended to be performed with his own forces. No extra compensation for services as a General CONTRACTOR will be paid.
 
6, The lump sum amount entered by the CONTRACTOR  in  the Bills of Quantities shall constitute the entire claim for compensation fo 「 the WORKS under this CONTRACT in accordance with the conditions of contract. The WORKS shall not be re-measured  and  will be subject  to  adjustment  only as a result of VARIATIONS. The Bills of Quantities will therefore be used as a Schedule of Rates to enable pricing of VARIATIONS.
 
7. The CONTRACTOR  shall, prior to submission of his tende「, request w「itten clarification from the ENGINEER of any point he considers being a majo「 omission from the Bills of Quantities, and the ENGINEER shall issue instructions  in response to each  request.  Notwithstanding the  foregoing, the Contractor shall be responsible for ensuring that his Unit Rates and Lump Sum Price are inclusive of all discrepancies in description or quantity contained in these Bills of Quantities, as no adjustment to quantities will be made,
 
8. After submission of Tenders, it will be deemed that the value of  any  discrepancy  has  been included in the Tender sum, that all billed quantities are accepted as co 「 rect, sub 丿 ect to any adjustments  instructed  by the ENGINEER. Consequently,  no claim whatsoever will be entertained in respect of any discrepancy between individual Documents comprised in the CONTRACT.
 
9. The CONTRACTOR is required to check the numbers of the pages of the Bills of Quantities and should any be found missing or in duplicate or the figures or writing indistinc,t the CONTRACTOR shall  notify the  ENGINEER  at once and have the matter rectified before  the date of submission of
Tenders.  No  Liability  whatsoever  will  be  entertained  in  respect   of  a  y  c aim   or  error 1
CONTRACTOR'S  tender resulting from failures to comply with the foregoli: LY
 
10. Unit rates may be used reciprocally in the settlement of accounts unless conflict between them occurs. The CONTRACTOR is, therefore, to ensure that identical items occu 「 ring  in separate Bills are not priced at different rates unless this is his  deliberate intention.
 
11. The Bills of Quantities have been measured generally in accordance with the Rules of POM (I) (as here below defined). In any case in the Bill of Quantities where the  method  differs,  then  the method expressed must be accepted and measured in accordance therewith. Notwithstanding the above, the following Pricing P「 eambles are offered only as an amplification or clarification to billed descriptions.
 
12. Items in the Preambles Section of  these Bills of Quantities are deemed  to qualify and  to form part of every description of measu「ed work to which they refe「 including composite descriptions.
 
13. The CONTRACTOR shall not use the Bills of Quantities as a construction programme or for the purpose of ordering materials or a「 ranging SUBBCONTRACTS. The references for these activities shall be the DRAWINGS, SPECIFICATIONS and instructions issued by the ENGINEER.
 
14. Should the CONTRACTOR consider any further items to the items described in the Bills of Quantities are necessary to complete his pricing then he should identify these  items and include them in his offer.
 
15. Any error in description or in quantity o 「 in omission of items from the Bills of Quantities shall not vitiate this CONTRACT nor release the CONTRACTOR from the execution of the whole  or  any  part of the WORKS comprised therein according to the DRAWINGS and  SPECIFICATIONS  o 「from any of his obligations or liabilities unde 「 the CONTRACT. Any error in or omissions from the Bills of Quantities shall not be corrected by a VARIATION  issued by the ENGINEER
 
16. Lump Sum shall not be given where unit rates are applicable
 
17. Amendments shall not be  made to the Bills of Quantities without the ENGINEE  written permission
 
18. In add 仆 ion   to  common abbreviations, the following have been adopted:
 
 
POM (I):
 
 
 
 
STM: BS:
 
PRINCIPLES   OF   MEASUREMENT (INTERNATIONAL)    FOR    WORKS  OF
CONSTRUCTION dated June 1979 and published by the Royal Institution of Chartered Surveyors, London
 
American Society for Testing Materials. British Standa「d,
 
Dia: diameter
 
Hr hou「
 
mm: millimetre
 
m; meter
 
m2: square meter
 
m3: cubic meter
 
No./Nr.: Number
 
Kg: kilog「am
 
Sq: squa飛
 
Ref: reference
 
PC Sum: Prime Cost Sum
 
PS: Provisional Sum
 
LS: Lump Sum
 
19, Rates shall be comprehensive and include for, but not be limited to, the following:
 
(a) All obligations imposed by the CONTRACT.
 
(b) Complying in every respect with the requirements of the CONTRACT
 
(c) Labou 「 and all costs in connection.
 
(d) Materials and goods and all costs in connection, including samples
 
(e) Fittings and fixing materials and goods in position including hoisting to any height
 
(f) Use of scaffolding, plant, equipment and tools
 
(g) Any additional labours usually associated with measured items.
 
(h) Establishment and overhead charges and profit.
 
(i) Laps, waste and trade or any allowance.
 
20. The pricing of materials shall take account of the following:
 
a. PRICING PREAMBLES and SPECIFICATIONS shall apply reciprocally between sections of the WORKS unless otherwise described.
 
b. Materials shall be of the quality specified unless otherwise directed by the ENGINEER.
 
c. All materials shall be transported, handled, stored and fixed in accordance with the printed instructions or recommendations of their manufacturers or suppliers.
 
d. Protection of completed work, all casings and temporary coverings and  making  good, cleaning and polishing and clearing away upon completion
 
21. Where the word "allow" is used, the cost of such item shall be the responsibility of the CONTRACTOR.
 
22. The amounts set against any items of profit shall include for all costs in connection with letters of credit, bank charges, interest charges and insurance after the materials come under the control of the CONTRACTOR.
 
PilinA / Secant piles:
 
Unless detailed otherwise, rates for piling shall include the following:
 
1. Cost of carrying out structural calculations and obtaining approval from local authority and the Engineer ,
 
2. Mobilization of piling equipments.
 
3. Setting up plant at each pile position including any levelling or site preparation required.
 
4. Supply of all materials including concrete, steel reinfo「cement,etc
 
5. Provision of testing equipments and carrying out the specified tests.
 
6. Cutting back piles to the formation levels and bending steel into pile caps.
 
7. Dc-mobilization of piling equipments.
 
Excavation and earth Works
 
Unless detailed otherwise, rates for excavation and earth works shall include the following:
 
1 Increase 1n bulk.
 
2. Excavation in any material including「ock.
 
3. Upholding sides of excavation with timber or steel sheeting o「 any other means.
 
4. Keeping excavation free from water
 
5. Backfilling where required with approved material compacted  as specified and  approved by the Engineer, all to reach the specified finished levels. Any loss in volume due to compaction and for additional materials required due to penetration  of the filling materials into the ground or any settlement o「 compaction of the original ground levels unde 「 the weight of the materials or due to methods of compaction or construction  traffic shall be accounted for in the rates,
 
6. Disposal of surplus materials to areas designated by Municipality and as approved by the Engineer.
 
7. Forming temporary spoil heaps where required and multiple handling.
 
8. Levelling  and  compacting   the  bottoms  of  all  excavations  to  receive  concrete  or  othe「 construction.
 
PRICING PREAMBLES FOR WATER WORKS
 
1. General
 
The Scope of Work, Specifications, Schedules of Prices and Drawings do not necessarily cove 「 all items to achieve the 「 equirementsof the AGREEMENT. The AGREEMENT rates, however, shall be deemed to include all costs to execute the specified works and all related works, which an experienced CONTRACTOR shall reasonably foresee. Costs of items described or implied in the Specifications and not specifically mentioned in the Schedules of Prices shall be deemed to be included in the rates and prices of other items.
 
Descriptions offered by ADDC/ENGINEER  shall be for  guidance  only. The CONTRACTOR  shall be fully responsible for determining items and quantities as necessary for reaching the lump-sum prices required for performing all the CONTRACTOR's obligations under the AGREEMENT .
 
The CONTRACTOR shall be deemed to have included in his sums for all waste, bulking or compaction factors, dewatering, over pulling and all other like elements or operations required to complete the WORK(S), including all necessary measures to protect or preserve adjacent work or property during such operations, in accordance with the provisions of the AGREEMENT
 
Should any new areas of work transpire which ADDC/ENGINEER consider not envisaged as being part of this AGREEMENT, quantities shall be measured by ADDC/ ENGINEER.
 
The CONTRACTOR shall be given the opportunity, in such cases, to be present during the measurement. Prices for the new work, if any, shall be mutually agreed between ADDC/ENGINEERand  the CONTRACTOR.
 
No request shall be considered for an increase in the unit rates on the grounds that they shall be inadequate to carry out additional wo「k of a similar nature.
 
The CONTRACTOR shall be required to complete, in full, his pricing inclusions in the columns provided as listed in the Schedule of Prices. Items not priced by the CONTRACTOR shall be deemed to be included elsewhere.
 
Prices shall be quoted for each item, even when the quantity of that item is zero. This will enable variation order for unforeseen changes to route o 「 for unexpected obstacles to be priced. TENDERERS are cautioned in respect of the prices quoted for unit rates, as these will be taken into account during the evaluation of the submitted offer and excessive values will not be tolerates
 
The CONTRACTOR shall be deemed to have included for all the necessary information, details, clarifications or drawings and documents of the CONTRACT.
 
The CONTRACTOR shall be 「 equired to take all measures necessary to ensure that the whole of the WORK(S) shall be executed in such a manner so as to minimize the generation of dust and other hazards.
 
The CONTRACTOR  shall execute the WORK(S) in accordance with the specifications, drawings,
 
ADDC/ENGINEER shall have the right to remove any item from the Scope of Work due to operational o「 safety 「 equirements and the appropriate value shall be deducted from the Contract Price without any claim from the CONTRACTOR.
 
No cutting away or welding of any parts of the WORK(S) shall be pe「mitted unless with the written consent of ADDC/ENGINEER.
 
The supply of electricity and water for construction purpose shall be the CONTRACTOR's responsibility.
 
The  TENDERER's  attention  is  directed  to  the  Price  Breakdown  Summary  Sheet,  Schedule of Prices, Progress Schedule, Schedule of Cash Flow, General Conditions, Special Conditions and Requirements,  Technical Specifications and Tender Drawings,  and all these documents are  to be
「 ead in conjunction with the Schedule of Prices (Bills of Quantities) and the relevant notes on the Schedule of Prices (Bills of Quantities). Insofar as these notes on the Schedule of P 「 ices (Bills of Quantities) and Tender Drawings may affect the  execution and pricing  of the WORKS,  they shall be deemed to form part of the Conditions of CONTRACT.
 
General directions and desc 「 iptions of the WORKS and material are not necessarily repeated in the Schedule of Prices (Bills of Quantities) and reference is to be made to the relevant articles of the various sections of the Tender Document for each item of the Schedule of Prices (Bills of Quantities).
 
The TENDERER shall include but not by way of limitation all labou「, materials, tools, equipmen,t plants and appurtenances to perform all the WORKS as required for all water pipeline  work specified in these documents.
 
2. Prices
 
The TENDERER shall quote firm unit prices and based on these firm unit prices and on the estimated quantities, the TENDERER shall quote the total price for all materials C&F Abu Dhabi up to designated site stores and/or the ADDC's stores or other designated location. The C&F unit prices and total prices for all materials shall include, but not be limited to the following:
 
1. Design, manufacture, factory inspection and testing by an independent laboratory, supply, export packing and marking and all transport costs incurred until placing all materials on board the vessel, airplane or truck.
 
2. Freight from port of shipment to port of destination in the U.A.E.
 
3. Patent rights, trade marks, name or other protected rights, royalties etc.
 
4. Responsibility for any loss and/or damage until the material has been installed at the site or placed at the ADDC's storeyards.
 
5. Provision of clear on-board bills of lading.
 
6.
 
7. Dock  dues  and  port  charges,  including  import  duties  at  port  of  destination,  permits, contributions, clearance of goods through customs, off-loading and all incidental expenses
 
8. Transportation to designated stores, unloading at store and storage at stores
 
9. Checking and verifying all shipmentsreceived against shipping documents and issuing receipt and damage report.
 
10. Certificate of origin, or any other documents issued in the country of shipmen,t or those required under Laws of Abu Dhabi and the United Arab Emirates.
 
11. All expenses of the CONTRACTOR'S personnel in connection with the discussion and/or co­ ordination meetings in the ADDC's offices and/or in the ENGINEER's offices in Abu Dhabi throughout the CONTRACT Period.
 
12. The cost of marine insurance from warehouse to warehouse
 
The cost of the Third Party Inspection Authority (TPIA) shall be paid by the ADDC.
 
The TENDERER shall quote firm unit prices for all further services in connection with local transpor,t insurance, facilities  for  the ADDC/ENGINEER  and for all expenses in connection  with erection , construction or exhumation, testing, commissioning or abandonment on the basis of estimated quantities. These unit prices shall be referred to as Local Expenses.
 
The price of the Local Expenses shall include but not be limited to the following:
 
a) Loading at store, transportation from store to the site, unloading at site, handling from site storage to the point of final installation.
 
b) Complete insurance comprising marine transport insurance from warehouse to warehouse, insurance of plant, workman's compensation insurance, third party, public liability and property damage insurance, CONTRACTOR's all risks insurances etc. in accordance with Tender requirement s.
 
c) Construction, erection, installation, exhumation, testing and commissioning or abandonmetn of works and all other expenses arising until Final Acceptance of the WORKS.
 
d) All costs associated with labour and living expenses.
 
e) Cost of local transportation of any indigenous equipment and/or materials
 
f) Costs of providing transport for the supervisory staff on site to carry them from the site office to the site of the WORKS and between the site offices of the Project.
 
g) Costs incurred in providing the services of an engineer, to be made available on site at ADDC's short notice during maintenance period.
 
h) The cost of providing manuals, progress photographs in colour and/or black & white etc. as per specification or as directed by ADDC/ENGINEER.
 
i) Cost of pipeline route survey and any other survey work 「 equ 「i ed fo 「 the execution of the WORKS as per the specification.
 
j) Cost of preparation and submission of pipeline profile drawings, layout drawings, detailed drawings and any other drawings deemed necessary for the construction of the WORKS.
 
k) All  prices  and  rates  shall  include  for  preparation  of  proposals,  drawings,  engineering, calculations, documentation, etc. as shall be「equ「i ed for approval procedure.
 
I}   Any other cost or expense contingently necessary for the proper completion of the WORKS
 
The TENDERER shall quote his prices by filling in the blanks in the Schedule of Prices (Bills of Quantities) of this Section.
 
All prices quoted by the TENDERER shall not be affected by the increase in price level in any country. The lumpsum prices of those items for which a lumpsum has to be quoted and the unit prices (rates) to be entered in the Schedule of Prices (Bills of Quantities) shall be firm prices.
 
3. Scaffolding, Trestles, Ladders, Etc.
 
The CONTRACTOR shall provide at his own cost, means of access to work using scaffolding, trestles, ladders, brackets or whatever equipment the circumstances dictate with "safe" wo「king as the major consideration. Where such access shall be erected or provided for the CONTRACTOR's activities, the CONTRACTOR shall permit reasonable utilisation and use of such facilities by others executing concurrent activities provided that such permission and use shall not cause delay or unreasonable hindrance o「 interruptionof the CONTRACTOR's own operations.
 
The CONTRACTOR's scaffolding and means of access shall be erected for a period prior to commencement of the work if required by ADDC/ENGINEER and shall remain until ADDC/ENGINEER inspection process shall be satisfactorily completed. The period in either case shall not exceed one week.
 
4. Lifting Tackles, Wire Ropes, Etc.
 
All lifting tackles, wire ropes, blocks, shackles etc. including any special equipment for executing the WORK(S) shall comply with the requirements of the appropriate British Standard Specification or equivalent and carry a valid test certificate. Under no circumstances shall chain slings be used.
 
Where there shall be a possibility of damage to material equipment, or its deformation due to slinging from more than one point, ample strutting shall be p「 ovided so as to ensure that perfectly vertical lift shall be obtained.
 
5. Climatic Conditions
 
The CONTRACTOR shall be deemed to have allowed for all effects on the execution and progress Of WO「k s occasioned by climate and prevalent conditions and with specific reference to periods of high humidity and the incidence of wind/air borne dust occurring naturally.
 
Page 4 of 28
 
6. Removal of Debris
 
Accumulated debris or unusable materials shall be removed by the CONTRACTOR to a suitable location off site designated  by Municipality.  The cost of  cleaning  up and removal  shall be deemed to be included in the CONTRACTOR's rates.
 
7. Land Cutting and Filling
 
Where 仆 is necessary the part or all of the project area shall be levelled by means of balancedcut and  fill  with  use  of  the  original  materials  and  the  Contracto「  shall  adhere  to  the  following procedure:
 
a) The Contractor shall survey the original topography of the designated area and provide cross-sections at 25 m intervals and as directed at site by ADDC/ ENGINEER.
 
b) The said area shall be refe「red to a suitable fixed local temporarybenchmark and the cross­ sections shall be plotted on a preliminary drawing with sufficient accuracy to facilitate the future preparation of cross-section profiles after completion of the land cut/f曲 ng operation
 
c) On completion of land cut/filling a 「 esurvey of the designated area shall be made along the same cross-section grid to establish the finished profile and levels of the site as pe 「 the Contract Drawings.
 
d) All elevations shall be referred to the contract datum.
 
The rates and prices for the CONTRACT shall include all costs related to leveling of the pipeline route area by means of the balanced cut and fill that shall be carried out prio 「 to commencement  of excavation fo 「 layingthe pipes.
 
It shall therefore be the TENDERER(S)  sole responsibility to ensu「e that all the necessary information in this respect are duly gathered by him on site prior to establishing his rates and prices for the CONTRACT.
 
8. Embankments
 
In low lying areas where the balanced cuVfilling of the land can not be applied, it is necessary that the pipeline be laid in embankments/bund constructed  from approved imported  fill mate「ials, the CONTRACTOR shall adhere to the following procedure:
 
a) The   Contractor   shall   survey  the   original   topographical   contou「  along   the  proposed centreline of the pipeline and p 「 ovide cross sections at 10 m intervals, or as directed at site by ADDC/ENGINEER.
 
b) The said contour shall be 「 eferredto the corresponding elevation of the edge of the road or other notified refe 「 ence level and shall be plotted on a preliminary drawing with sufficient accuracy to facilitate  the future preparation  of cross section profiles  at 1O metres intervals
afte「 constructionof the embankments.
 
All elevation shall be referred to New Abu Dhabi Datum or as instructed by ADDC/ENGINEER
 
It shall therefore be the CONTRACTOR's sole responsibility to ensure that all the necessary information is duly recorded and certified by ADDC/ENGINEER, prior to the commencement of any work which, for purpose of any payment,  may require compliance  with  the  above mentioned
procedu 飛
 
If the existing surface level is found to 「 equire filling under the pipe in order to give a minimum cover of 1000 mm on top of the pipe, such filling shall be executed to the requiredbottom level of the pipe.
 
The supply, placing and compaction of imported fill material shall be measured per cum as placed into position after compaction.
 
9. Surveying
 
Surveying work shall be carried out in accordance with the relevant specifica tion, clauses and drawings. The cost for such work shall be deemed to be included in the rate of  the  respective  items. Surveying  work shall include, but not be limited to, the following:
 
a) All labour, equipment and materials necessary for the survey and pegging out of  the pipelines and other structures and installations.
 
b) The surveying of the most suitable route bearing in mind the construction and site operating requirements, including trial hand excavation to locate existing unde「ground services etc
 
c) Any deviations or changes from the route or locations shown on the Tender Drawings whether  necessitated by local conditions  or by ADDC's/ENGINEER's requirements
 
d) The pegging out with approved conspicuous pegs at such intervals that when standing  at any peg, both the preceding and following pegs are in view, including maintenance and protection of the pegs.
 
e) The installation or marking and maintenance of a reference benchmark(s) on site, referenced to established site datum, as instructed by ADDC/ENGINEER.
 
f) The preparation of survey route cross section and profile drawings giving all necessary elevations, dimensions and data,「elatedback to the reference benchmark.
 
g) The provision of all necessary assistance, equipment transport etc to ADDC/ENGINEER as specified elsewhere.
 
10. Precast Concrete Items
 
Cost for all required precast concrete items and related works shall be deemed to be included in the rates of the respective items. Cost fo 「 precastitems such as, ARV and valve spindle protection chambers, marker posts, pipe sleepers, pipeline protection slabs, paving elements, kerbstones etc, and shall also include fo 「 the provision of samples if required of each precast item for quality review and approval, and for storage, handling transport, installation in position etc
 
The rates fo「 the chambe「 and valve spindle protection chambe「 shall be per unit and shall include for the supply and installation of all ancillary items as for reinforced concrete chambers.
 
Cost for marker posts shall include for stainless steel plates, painting, markings etc as detailed on the Tender Drawing.
 
The provisions of this clause shall apply equally to proprietary plastic protection or marker boards if approved as an alternative to precast concrete slabs.
 
Cost for paving elements such as concrete slabs, interlocking blocks or pavers etc, shall be inclusive of all retaining kerbs, haunching, bedding, jointing etc.
 
11. Discount
 
If a discount is offered by the CONTRACTOR it shall apply to all Schedules of Prices through establishing the discount percentage in respect of the relevant Agreement price and then applying this percentage to each of the items in the Schedule of Prices. Whenever a general discount is offered affecting the prices, the percentage of such a discount with respect to the total value of the schedule of prices shall be applied to all the items pro rata. Re-adjustment of the prices in any other  manner will not be acceptable.
 
12. Quantities And Rates
 
All the quant 仆 ie s stated in the Schedule of Prices (Bills of Quantities) shall be treated as approximate only and are given to provide a common basis for tendering. The basis of payment shall be the actual quantities of supplied and installed material and works carried out, as measured and accepted by the ENGINEER or his representative and valued at the rates or prices quoted in the Schedule of Prices (Bills of Quantities).
 
The CONTRACTOR shall prepare detailed construction shop drawings based on the CONTRACT Plans  and as directed by the ENGINEER.  The CONTRACTOR  shall  carry  out extensive   field
 
Pag e 7 of 28 TEBOOtN M.E. Ltd.
 
investigation and consider all existing conditions and obstructions for the preparation of shop drawings. Shop d 「 awings should in addition incorporate all required revisions to the CONTRACT Drawings including, but not limited to additions, deletions or route changes of the proposed lines  as directed by the ENGINEER.
 
The CONTRACTOR shall assess the preliminary quantity of materials to complete the WORKS based on the CONTRACT Drawings or shop drawings as considered appropriate by the CONTRACTOR to ensure procurementof materials as early as possible and as demanded by the CONTRACTOR's   construction   time   scheduling.   The   CONTRACTOR's   proposed   materials procurement list identifying the items and quantities should be submitted to the ENGINEER fo 「assessing the availability of 「f ee-issuematerials from the ADDC's con 「t acts and/or ADDC Stores, prior to ordering the materials.
 
The ADDC may supply certain materials as free issue from other contracts and/or from the ADDC stores, if such items are available as surplus. Prior to ordering the materials, the CONTRACTOR shall explore the availability of these free issue materials with the ENGINEER. If it is established that part of the materials are available for free issue, then the ENGINEER will issue the appropriate instructions to the CONTRACTOR for the CONTRACTOR to make a「「angementsto collect the materials and incorporate them into the WORKS. Such material will be in lieu of the materials to be supplied unde 「 BOO No. 1 and shall be transported/constructed/installed in accordance with the unit rates and prices quoted in the Schedule of Prices (Bills of Quantities) fo「Construction and Installation.
 
After completion of the above steps, the CONTRACTOR should assess the quantities of the remaining materials required to complete the WORKS and, as soon as material data sheets are approved, should proceed with ordering the 「 emaining materials after accounting the free issue items and quantities. To lessen the possibility of procuring surplus materials, which may not be actually required for the WORKS, the CONTRACTOR should finalise and get approval for the shop drawings in a timely manner, prefe「ablyprior to ordering his materials
 
Payment for the CONTRACTOR supplied materials will be made only for the measured installed quantity. If there has been a 汜 vision to design ordered by the ADDC after approval of the shop drawings and after ordering the materials, consideration will be made on paying for the resulting surplus materials based on the ADDC's and/or ADDC's acceptance of a properly documented claim.
 
The responsibility for assessment of Materials Quantity is  with  the  CONTRACTOR CONTRACTOR does not have to wait for either processing his shop drawings or quantity authorisation by the ADDC and/or ENGINEER, for ordering materials once the  material  data sheets are approved. Any material that becomes surplus, due to over estimation by the CONTRACTOR will not be paid for and such materials will be the property of the CONTRACTOR
 
It shall be the CONTRACTOR's sole responsibility to orde 「 a certain amount of material necessary for the uninterrupted completion of the WORKS to compensate for material losses due to cutting of pipes , wastage, at no extra cost to the ADDC
 
The TENDERER shall include extra costs, if any, associated with part ordering of materials.
 
TEliODIN M.E. Ltd.
 
A separate price or rate shall be entered for each item of the Schedule of Prices  (Bills of Quantities) in figures. Items against which no price or rate is entered will be deemed to be covered by rates or prices of other items of the Schedule of Prices (Bills of Quantities). No new items shall be added to the Schedule of Prices (Bills of Quantities) nor shall any alternatives be made thereto.
 
In case of discrepancy between the quoted unit rate or price and the total amount for any item of Schedule of Prices (Bills of Quantities), the unit rate or price shall be binding
 
The rates and prices entered in the Schedule of Prices (Bills of Quantities) shall be inclusive of all costs incurred in any manner whatsoever in complying with the provisions of the Tender Documents , whether or not such items are specifically described in the Schedule of Prices (Bills of Quantities), including all labou「 cost, testing of materials by independent  laboratories, temporary works, erection, testing and commissioning, maintenance, insurance, taxes, duties,  every incidental and contingent cost and charges whatsoever.
 
The rates and prices entered in the Schedule of Prices (Bills of Quantities) shall be inclusive of the cost of all ancillary work and materials not separately mentioned in the Schedule of Prices (Bills of Quantities), but which may  reasonably  be implied to be necessary by the Specification,  Schedule of Prices (Bills of Quantities) or Drawings, or reasonably be inferred to be necessary there f「om, or which are usual or essential to the completion of the WORKS.
 
The prices and rates inserted in the Schedule of Prices (Bills of Quantities) shall be the full inclusive value of the work described under the several items, including all costs and expenses which may be 「 equired in and for the construction and installation of all the work described completely , together with all general risks, liabilities and obligations set forth or implied in the Tender Documents.
 
The rates quoted in the Schedule of Prices (Bills of Quantities) shall include for all costs and shall be deemed to be complete in all respects conforming to the Tender Documents and normal acceptable construction practices fo「 all the WORKS until the date of Final Acceptance Certificate.
 
The work shall be measured net as executed and erected on site unless otherwise specified.
 
All materials brought onto the site by the CONTRACTOR in accordance with the approved shop drawings are the ADDC's property and shall be in CONTRACTOR's custody fo 「 erection and installation.
 
The  ADDC  may provide certain materials  from ADDC's  stores and/or from ongoing  projects for
inco「poration in the WORKS. Such material will be in addition to or in lieu of the materials to be supplied unde「 BOQ No. 1 and shall be transported/constructe/dinstalled in accordance  with the unit rates and prices quoted in the Schedule of Prices (Bills of Quantities) for Construction and Installation.
 
All materials ordered by the CONTRACTOR before the free issue of certain materials by the ADDC and become surplus due to the free issue, shall be assessed by the CONTRACTOR prior to their shipment to the U.A.E. and returned/deliveredby the CONTRACTOR directly to the ADDC's stores and/or other designated stores at no add仆ion al cost to the ADDC.
 
TEBOO,N  M.E.. Ltd.
 
All unused free issued and/o 「 approved surplus materials shall  be  cleaned/repaired at no extra cost to the ADDC, delive 「 ed and offloaded undamaged by the CONTRACTOR as and  when required by the ADDC to the ADDC's stores within 90 KM or any other place if required. The transportation cost of justified approved surplus materials will be paid in accordance with the relevant item in BOQ No. 3.
 
Should there be any discrepancy between unused free issued quantity, the approved surplus quantity and the quantity of undamaged materials delivered and taken over by the ADDC's Stores and/or other designated stores, then the difference shall be evaluated using the respective  rates and prices in the Schedules of Prices and the amount deducted from the CONTRACT PRICE.
 
13. Working Hours
 
ADDC's working hours at SITE are set out in the TENDER Documents. The CONTRACTOR  shall be allowed to work outside the site working hours and days at the disc 「 etion of ADDC/ENGINEER subject  to security  and  othe 「 rules  at  each  location.  All  extra  costs  incurred  through working
ove 巾 me shall be included in the CONTRACTOR's price. Such costs  shall include, but not limited to travel, overtime, supervision, food and all incidental expenses.
 
14. Safety Provisions
 
Unit Rates and Prices shall include for all site protection as per ADDC Safety Rules  and Regulations, T「 affic Police, Municipality, Oil Companies or other relevant Authorities, including but not limited to provision of metal screens and safety barriers and all measures necessary to protect adjacent structures, properties from the effects  of over spray, paint spatter or drainage  by impact of o「 introductioninto machinery of sand blasting material. All such measures shall be provided  to the satisfaction of ADDC/ENGINEER
 
15. Excavation and Backfilling
 
Unless specified otherwise, the rates given in the Schedule of Prices (Bills of Quantities) fo 「excavation and backfilling of trenches, foundations, etc., shall include, but not be limited to:
 
1. All labour, equipment and materials necessary
 
2. Clearing and grubbing of the site and the pipeline route and「emoval of any obstruction.
 
3. Hand or machine digging and excavation in all type of ground, not specifically mentioned under separate BOQ items, and stacking the spoil adjacent to the excavations in an approved manner. No distinction shall be made between soft, hard or rocky ground even if any of the foundation areas or pipeline routes are changed from those shown on the CONTRACT Drawings to any othe「 route w咖 n the working area of this p「oject.
 
4. Construct   and  maintain  all  ramps,   temporary  access,  safety  barriers,   signs,   lights and
diversion「oads as required by the Traffic Police, Municipality, Oil Companies or other relevant Authorities.
 
 
Page 10 of 28
 
5. Dewatering of excavations and disposal of wate「 by any means  in an approved  manner as directed by the ADDC/ENGINEER and as per the requirements of the concerned Authority.
 
6. Double or multi-handling where necessary in connection with the removal and disposal of surplus o「 unsuitableexcavated materials to a location approved by the ADDC/ENGINEER.
 
7. Working around or under and protecting any ad丿ac ent structures, pipes, cables, ducts or other existing services and structures.
 
8. Any exploratory holes, trenches, etc. that may be required to locate services o「 to test soil characteristic.s
 
9. Supply and placing of pipeline bedding materia,l levelling and compacting the bottom of excavation,s trimming and shoring sides of excavation slopes and placing  backflil in compacted layers over and around the pipeline.
 
10. Completing the backfilling in compacted layers including the provision for importing  an approved backfill material as necessary and restoring the area as directed by the ENGINEER
 
11. Provision of fencing, lighting, watching, temporary reinstatement and maintenance of surfaces other than asphalt roads, parking areas, footpaths, e tc., and every other expense in strict conformity with the Specification.
 
12. Any additional excavation for buried valves, f「i e hydrants, fittings, etc.
 
13. Should the CONTRACTOR over excavate any part of the WORKS either depth wise o「 width wise, such over excavation shall be made good with approved backfill material at CONTRACTOR's  expense.
 
14. Excavation and trenches in the existing and/or proposed roads shall be backfilled to the grade level with thoroughly compacted material approved by the ENGINEER
 
15. Removing all su 「 plus excavated material and levelling and landscaping as directed by ENGINEER
 
16. Reinstatement of road surfaces,  green areas o「 any other buildings,  structures,  pipes, cables or any other services which has been removed or damaged in order to perform the WORKS
 
17. Obtaining necessary permit to work from Oil Companies, Defence/security areas, Traffic Police, Municipality or other Authorities that my be required to perform the wo「ks.
 
18. Provision of shoring and shutting to safeguard against side collapse of excavations and trenches.
 
19. All costs with respect to disturbance of green areas not covered by the 「 egulations of the Agriculture Department.
 
Measurement for excavation, dewate「ing and backfill shall be per metre run (MR) of trenchgiving a minimum cover to the pipe of  as specified in the tende 「 docur:i罕 and is ir「espective of the
 
 
Page 11 of 28
 
TEBO,一DfN M.E. Ltd.
 
trench width for all operations till completion of the CONTRACT. Where add 仆 ion al excavation is necessary, it shall be measured for every additional 500mm depth specified, but shall only be considered valid when the continuous length of trench requiring additional excavation exceeds  thirty (30) metres at any individual location and more than one location along the excavation route shall not be measured cumulatively. Additional excavationless than 500mm shall be deemed to be included in the unit rate for excavation, dewatering and backfilling
 
Extra excavation, dewatering & backfilling required for construction of chambers, pits and thrust block s shall be included in the rates for construction, erection etc. of respectvi e items in BOO No. 2.
 
Excavation, dewatering and backf 曲 ng for any other excavation work as directed by the ENGINEER shall be per cubic metre (Cum) and as specified in the Schedule of Prices (Bills of Quantities)
 
The supply and placing of ex 「t a fill materials shall be measured per cubic metre (Cum) as placed into location afte 「 compactionand include transportof original material to a site approved by the ENGINEER.
 
In low lying areas where it is necessary that the pipeline be laid in embankmenst constructed from
approved  imported   fill   material,   the   rates  fo「  suppyl   of   fill   material   and  construction  of
embankments shall be per cubic metre (Cum). The CONTRACTOR shall adhere to the following procedure:
 
a) The CONTRACTOR shall survey the original topographical contour along the proposed centre line of the pipeline and provide cross sections at 25m intervals.
 
b) The said contour shall be related to the corresponding elevation of the edge of the road and shall be plotted on a preliminary drawing with sufficient accuracy to facilitate the  future preparation of cross section profiles at 25m intervals after construction of the embankments
 
c) On completion of the construction of the embankments a survey shall be made to determine the final contours, which shall then be plotted against the original contours to establish profiles at 25m intervals thus determiningthe final volume.
 
Irrespective of the method of measurement adopted by the CONTRACTOR, when preparing his invoices for fill material, the final quantities shall be defined from the results of the application of paragraphs a), b) and c) above.
 
It shall therefore be the CONTRACTOR's sole responsib 仆 ity to ensure that all the necessa ry informationis duly 「 ecorded and certified by the ENGINEER, prior to the commencement of any work,  which, for purposes of  any payment, shall require compliance  with  the above-mentioned procedure.
 
If the existing surface level is found to require filling under the pipe in order to give a minimum cover, as specified in the tender documen,t on top of the pipe , such filling shall be executed to the required bottom level of the pipe
 
 
Horizontally this filling shall be extended up to the nearest「oad ke「bstone, whenever this is 5m o「less from the pipeline. Unit rates for this operation shall include for the supply of suitable fill material.
 
Imported fill material required for embankments shall be measured from the existing surface level or from the bottom of pipe, whichever is the higher, up to the final road level, all as calculated from the results of the route survey mentioned above.
 
16. Concrete Works
 
The rates and prices for all concrete wo「ks shall include but not be limited to:
 
1. Any calculations, detailing and construction drawings, which in the opinion of the ENGINEER are necessary for the proper execution of the WORKS.
 
2. The supply of concrete, reinfo 「 cement, all-necessary labour, equipment and materials required fo「 the preparation, placing and protection of the concrete works.
 
3. The required excavation, backfilling, blinding, formwork, placing of concrete, compaction and vibrating and any additional formwork for the construction of joints, stop ends, building in fittings, pipes, conduits, bolts and the like, which although not specifically mentioned in the Tender Documents or shown on the drawings, are reasonably to be inferred from the specifications or  drawings  and  the ADDC's/ENGINEER'isnstruction.s
 
4. The supply and fixing of formwork and steel reinforcement in accordance with the drawings and specifications, includingall cutting, bending, fixing and provision of all necessary spac 「e bars, saddles, binding wire etc
 
5. Sampling and testing the characteristics of the concrete and concrete materials as per the specfiication.
 
6. The supply/application of protective coatings and waterproofing to cone「ete below ground or exposed to atmosphere as pe「 thespecification or shown on the drawings.
 
7. Supply and fixing of water stop at joints as per the specification or shown on the drawings.
 
In situ concrete shall be measured as the net volume shown on the drawings or variations to the drawings as directed by the ADDC/ENGINEERor his representative,sbut no deductions shall be made for  small chamfe「s,  steel work, reinfo「cement, bolt holes「equiredto be built in,  nor shall extra value be measured for splays or fillets.
 
 
 
17. Supply of Materials
 
Unless specified otherwise, the rates for the supply of all materials shall include all costs in respect of manufacturer's testing, testing by independent laboratory, C&F charges, clearance, all handling and transportation, storage, and any other costs incu「red under the obligations of the CONTRACT
 
The rates for the supply of pipes, valves, fittings etc. shall include for all lubricant, bolts, nuts, washers, gaskets, wheels, extension spindles , extension pieces, warning tapes, polyethylene sleeves, etc. and protective coatings as specified in the Tender Documents.
 
18. Storage, Warehousing, Etc.
 
The CONTRACTOR shall include for all temporary warehousing required by the CONTRACTOR to store his materials etc., in accordance with the CONTRACT, including Vendor's  storage instructions . The CONTRACTOR shall include for the protection and storage of sensitive material including pressurized and/or air-conditioned storage. The protection of all works and material shall be by the CONTRACTOR whether to installed or non-installeditems.
 
19. Pipe Construction
 
Unless otherwise specified or covered by separate BOQ items, the rates for pipe construction shall include, but not be limited to:
 
1. Supply of all labour, tools, equipment, plant and installation
 
2. The installation of polyethylene sleeve and placing of warning tape over the pipeline as per specification.
 
3. Costs for cleaning, jointing and cutting, trimming and otherv-Jise preparing the ends of pipes, hydrostatic pressure testing, flushing, disinfecting, sampling, commissioning and handing over of the completed WORKS.
 
4. All cost「elatedto collection and transportation of the water samples from site to the testing Laboratory and collection of Test results and submission to ADDC/ENGINEER's office
 
5. The water required for testing, flushing and disinfection shall be a「rangedby the Contractor at his  own  expenses.  Contractor  shall  be  responsible   to  arrange  all  ancillaries,  logistics, connections etc. for transmission of water from network point and tankers (certified for potable water) for transmission of water from supply station, if required.
 
The measurement for pipe construction shall be per metre length (MR) of pipeline including all valves and fittings, measured along the axis of the line before backfilling
 
 
20. Valves and Flowmeters
 
The supplies of gate valves and butterfly valves shall be measured per unit of each type and size. The prices for the supply of material shall be inclusive of, but not be limited to the following
 
1. A stem coupling of standard dimensions.
 
2. An extension spindle with standardised cap extending to approximately 150mm below the surface box cover.
 
3. Supply of hand wheel for butterfly valvesfor operation from inside the chamber.
 
4. Supply of bolts, nuts and washers or other approved bolt systems and rubber gaskets.
 
The TENDERER shall also include in his rates for the supply of 1 (one) number "tee" handled operating keys for every 10 (ten) valves supplied with a minimum of one.
 
The installation of valves, flow meter, flow control valves, etc. shall be measured extra over the appropriate item for installation of straight pipe for each type and size and shall include for installation of all accessories.
 
21. fittings
 
The supply of fittings shall be measured per unit of each type and size. Flanged items shall include all necessary bolts, nuts, washers and gaskets .
Should certain items described not be  available, the CONTRACTOR  shall propose  alternatives. The unit rates listed in the Schedule of Prices (Bills of Quantities) for both supply and installation shall in these cases are deemed to cover all components of any such  proposed alternative. The alternative  proposals are subject to the ADDC's/ENGINEER'sapproval.
 
The installation of fittings shall be measured extra over the appropriate item for installation of straight pipe fo 「 eachtype and size fully installed and readyfor operation.
 
22. Covers and Surface Boxes
 
The supply of D. I. or Aluminium covers and surface boxes shall be measuredpe「 unit of each type and size complete with frame.
 
The rate shall include for lettering on covers and surface boxes, coating, supply of lifting keys, etc all as pe「 specificationand as shown on the drawings.
 
The cost of installation of covers, frames and surface boxes shall be included in the cost of the construction of the「elevantconcrete s「t ucture.
 
 
23. Crossing of Oil/Gas Pipelines
 
The crossing of oil/gas pipelines shall be per crossing of oil/gas pipeline measured ex 「t a over the appropriate item fo「 the installation of straight wate「 pipelinefor each size
 
The rates for the crossing of existing oil/gas pipelines shall included but not limited to taking all precautions   and   safety  measu「es  and   compliance   with  the  owner   of   the  oil/gas  pipeline requirements and as per the specification.
 
24. Non Disruptive Road Crossing (NDRC)
 
NDRC shall be paid by meter run (MR) of pipeline to be constructed by NDRC fo 「 each diameter as described in the BOO. The length of the pipeline shall be measured along the centre line of the casing pipe.
 
A maximum time period of 35 working days will be allowed for NDRC pits (with specific fencing) to remain open. The ADDC reserve the right to deduct an amount pro rata and in accordance  with the Schedule of Prices for each NDRC pit that remain open beyond the maximum 35 working days specified. This 35 days period includes for everything necessary to complete the whole work at each NDRC pit including site restoration.
 
The unit rates for NDRC works shall include for all soil investigation necessary prior/during the NDRC work, field testing, laboratory testing, submission of design and method statement for the NDRC work, obtaining No Objection form the concerned Authorities, obtaining existing utility information, p 「 eparation and submission of detailed construction drawings, surface movement points, fencing of working area and pit locations, construction of thrusUreception pits, installation of
D. I. restrained water pipeline including restraining set (as supplied unde 「 BOONo. 1), provision of bentonite slurry, supply and installation of approved casing pipe, provision of grouting for casing pipe, grouting of annular space between the water pipeline and casing pipe,  excavation, dewatering, backfilling, pressure testing and disinfection of completed pipeline sections  and surface reinstatement  all as per the specification.
 
25. Concrete Chambers and Boxes
 
25.1 Chambers for Valves
 
The unit rates for construction of reinforced concrete watertight chambers shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved materials in compacted  laye「s,  removal  from  the  site  of  excess  materia,l  preparation  of  foundation,  all measures to protect the existing waterlines du 「 ing construction, supply of all materials complete with precast concrete cove「 slab,factory applied fully epoxy coated lifting hooks, supports for valve spindle  extension  (if  required), bituminous painting,  waterproof membrane,  asphalt  hardboard, sealing compound etc.; casting in of anchor flange and sealing flange (waterstops) as supplied in BOO No. 1, casting in of access covers, frames and surface box as supplied in BOO No. 1, bolting of aluminium ladder as supplied in BOQ No. 1, all as shown on Tender Drawing but excluding D.I pipes, fittings, sleeves, valves, water meters, and strainers.  Details  of lifting hooks, ladder, vent pipe, waterstops & valve chamber protection are shown on the Tender Drawings. All concrete works shall be according to specification
FOR TENDER ONLY
 
 
25.2 Marker Posts for Chambers
 
The unit rate for marker posts shall include but not be limited to the supply of all materials, 100mm (4") dia. hot dipped galvanised steel pipe (950mmlong, wall thickness minimum 6mm) complete with painting, concrete foundation, filling of pipe with concrete, excavation, backfilling  etc. all as shown on Tender Drawing.
 
26. Concrete Slabs For Pipeline Protection
 
The unit rates for construction and installation of precast reinforced concrete slabs for protection of waterlines shall also include but not be limited to the supply of all materials, excavation to the required level, excavation to determine  the location of the waterline, dewatering, transport to the site, placing of slabs, installation of warning tape, backfilling with approved  fill  material  in compacted layers to the required grade, all as per specification and shown on Tender Drawing.
 
27. Concrete Ducts for Waterlines
 
27.1 Circular Ducts
 
The unit rate for construction of reinforced concrete encased 450mm, 600mm, 800mm, 1000mm, 1200mm & 1500mm diameter G.R.P. ducts shall include but not be limited to submission of structural design calculations fo 「 ADDC/ENGINEER approval, p「 ovision of construction drawings, supply   of  all  materials   inclusive   bituminous   coating,  excava tion,  dewatering,   backfilling   in compacted layers to the required grade as per specification, cutting into existing road surface and removal of debris. These ducts will be constructed and sealed at both ends in accordance with Tender Drawing.
 
27.2 Box  Ducts and Box Culverts
 
The unit rate for construction of reinforced concrete box ducts and box culverts shall include but not be limited to submission of structural design calculations for ADDC/ENGINEER approval, provision of constructiondrawings, supply of all materials inclusive bituminous coating, waterproof membrane, asphalt hardboard, waterstops at expansion joints, sealing compound, construction of access shafts, installation of auxiliary items (covers & frames, ladders, etc.), excavation, dewatering, backfilling in compacted layers to the required grade as per specification, cutting into existing road surface and removal of debris. These ducts/culverts will be constructed and sealed at both ends in accordance with Tender Drawing.
 
28. Concrete Slab for Protection of Surface Box
 
The unit rate for construction of reinforced concrete valve spindle protection slab, shall include but not be limited to the supply of all materials, installation of surface bo x as supplied in BOQ No. 1, supply and installation of valve spindle protection tube with dust cap, excavation and backfilling all as shown  on Tender Drawing
 
 
29. Instrumentation Devices for Sector Measuring Point
 
Unit price for the instrumentation devices required at each bulk consumer and sector-measu 「 ing point  shall  be  ente「ed in  the  Schedule  of  Prices  (Bills  of Quantities)  under  separate  items  for supply and installation. The unit rate per set shall include but not be limited to the items as in BOQ No. 1 and mentioned in the specifications for bulk consumer measuring point and for sector measuring point.
 
30. Unit Rates for Manpower Equipment and Material
 
Unit rates in the Day Works Bill shall only be applied in connection with any work, as may be
requ「i ed by ADDC/ENGINEER outside the contractual agreed price.
 
Unit rates in the Day Works Bill for manpower and equipment shall be completed by the TENDERER(S) and submitted together with and as part of his TENDER. The TENDERER($) shall extend these rates and enter total amounts based on the estimated quantities.
 
Labour rates shall include all wages, bonuses, allowances, supervision, overhead cost, social premiums, profits, insurance, travel and accommodation etc. The labour rates shall also include for all hand tools and appliances.
 
Unit rates for equipment shall include the operator, fuels, lubricants, auxiliary equipmen,t service and repairs, insurance, transport, etc. The CONTRACTOR shall fill in the size and type of equipment which are not listed under this CONTRACT and which he might be 「 equ 「i ed to use in the execution of the works.
 
Reimbursement for labour and equipment usage under these rates shall only be made if the work involved is authorised or instructed by ADDC/ENGINEER against signed labour and equipment return s. It shall be the sole responsibility of the CONTRACTOR to ensure that all the necessary information is duly recorded and certified by ADDC/ ENGINEER during the progress  of  the relevant work.
 
Price s for materials supplied on unit rate basis shall include for all loading, transporting, unloading, storage, overhead and profits and all other associated costs. Prio「 approval of ADDC/ENGINEER shall be obtained for materials「equiredto be supplied for which no unit rates are ente「ed.
 
Under-utilizationor non-utilization of these unit rates shall not provide grounds for any claim by the CONTRACTOR in respect of reduction of the Contract Value.
 
31. Charges for  Disturbing And/Or Removal of Grass, Trees
 
The current regulations of the Agricultu「al Section of the Abu Dhabi Municipality dictate that before any pipe laying activities in green areas are allowed to start, charges at the current applicable rate for  disturbing,  removing  and  reinstallation  of  plantations shall  be paid  by  the CONTRACTOR
d「i ectly to the mentioned section.
 
Solely the representative of the Agricultural Section will determine the extent of affected green area.
 
The CONTRACTOR will be reimbursed the actual amounts paid, net, on presentation of proof of payment, subject to the ADDC's/ENGINEER's approval. All overheads, handling charges and all other costs involved shall be included in the other rates for local expenses. The Agricultural Section will perform removal, preservation if any, transportation and reinstallation of plantations as required.
 
The CONTRACTOR shall comply with the most recent regulations issued by concerned authorities regarding working in  the vicinityof planted areas
 
32. Reinstatement of Asphalt Road Surfaces
 
Unit 「 ate for reinstatement of asphalt road surfaces shall be measured per metre run with a maximum width of 2.0m and shall be paid as per CONTRACTOR'S quoted rate. The TENDERER's attention is drawn to Abu Dhabi Municipality Road Section regulations. The mentioned Section may order asphalt reinstatement to be carried out by specialised roadwork contractor approved by the Abu Dhabi Municipality. Contractor to price the item for reinstatement of existing asphalt road in accordance with the current practice being followed by the Abu Dhabi Municipality. The unit price  quoted  against  this item  shall  include for  mobilization/demobilization,  supply  of materials, reinstatement, protection works, detour, traffic control, warning systems, supervision by specialist consultant, main contractor's over head etc. The CONTRACTOR, while pricing this item, is deemed to be aware of the current practice and requirement of the Abu Dhabi Municipality for cut and reinstatement of existing asphalt road surfaces.
 
33. House Connection Arrangements
 
33.1 Concrete Water Meter Box
 
The unit rate for construction of reinforced concrete water mete「 boxes  shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, removal from site of excess materia,l preparation of foundation, supply of all materials complete with 160mm diameter uPVC inlet and outlet pipes with temporaryend caps, stainless steel or brass eye bolts for fastening the pulling rope, bituminous painting, transport to site, installation  of a watertight connection between 160mm diameter duct and water mete「 box, adjusting cover and frame (as supplied in BOO No. 1) to sidewalk level, providing drain opening with granular material etc., all as shown on the Tender Drawings.
 
 
33.2 Wall Mounted GRP Water Meter Box
 
The unit rates for the supply of wall mounted GRP water meter box shall include but not limited to the supply of stainless steel fixing bolts, lettering on the box in Arabic and English, lockable main door, lockable water meter reading door, provision of key for the lockable door, etc all as per the specification and as shown on the Tender Drawings.
 
The unit rate for installation of the wall mounted GRP water meter box shall include but not be limited to the supply of all materials, installation of the GRP box (as supplied in BOO No. 1) into position, replacement of tiles, bricks or concrete that is damaged during the box installation and
「epainting of the wall as all as per specification and shown on the Tender Drawings.
 
The unit rate for installation of large radius VC bend shall include but not be limited to the supply of all materials , supply and installation of the uPVC bend into position, concrete work, bituminous painting, excavation, backfilling, end capping of the bend, supply and installation  of  protection tube, supply and installation of brass brackets, supply and installation of stainless steel fixing bolts, replacement of tiles, bricks or concrete that is damaged during the bend installation and repainting of the wall as required all as pe「 spec巾cation and shown on the Tender Drawing s
 
33.3 Concrete Stopvalve Box
 
The unit rate for construction of「einforced concrete stop valve box shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, preparation of foundation, supply of all materials complete with 110mm or 160mm diameter uPVC inlet and outlet pipes with temporary end caps, bituminous painting, transport to site, installation of a watertight connection between 110mm o「 160mm diameter duct and stop valve box, adjusting cover and f 「 ame (as supplied in BOQ No. 1) to sidewalk level, providing drain opening with granular material etc., all as shown on the Tender Drawing
 
33.4 Pulling Box
 
The unit rate fo 「 construction of reinforced concrete pulling box shall include but not be limited to the supply of all materials, excavation, dewatering, backfilling with approved material in compacted layers, removal from site of excess material, preparation of foundation, supply of all materials complete with 110mm o「 160mm diameteruPVC inlet and outlet pipes, stainless steel or brass eye bolts for fastening the pulling rope, bituminous painting, installation of a watertight connection between 110mm o「 160mm diameter duct and pulling box, adjusting cover and frame (as supplied in BOQ No. 1) to sidewalk level etc., all as shown on the Tende「 Drawing.
 
33.5 uPVC Ducts (0 110mm & 0 160mm)
 
The unit rate for construction of ducts shall include but not be limited to the supply of all materials, 110mm or 160mm diameter uPVC pipe complete with watertight joints, sealing of duct entrances with end caps, 10mm dia. nylon pulling rope for installation of polyethylene house connection pipes, excavation, dewatering, backf 曲 ng with approved material in compacted layers, removal from the site of excess material etc., all as shown on the Tender Drawing
 
33.6 Reinforced Concrete Encased uPVC Ducts (0 110mm & 0160mm}
 
The unit rate for construction of ducts shall include but not be limited to the supply of all materials, 110mm or 160mm diameter uPVC pipe complete with watertight joints, reinforced concrete encasemen,t bituminous painting, sealing of duct entrances with end caps, marking of duct ends with concrete blocks carrying the letter 'W", 10mm dia. nylon pulling rope for installation of polyethylene house connection pipes, excavation, dewatering, backfililng with approvedmaterial in compacted layers, removal from the site of excess material etc., all as shown on the Tender Drawing.
 
33.7 7 Polyethylene House Connection Pipes with Auxiliary Items
 
Rates for installation of house connections from distribution mains up to the consumer facility shall be entered in the Schedule of Prices (Billsof Quantities) as a unit rate.
 
No differentiation is made between the installation costs for½", ¾", 1" and 1½" diamet 「e house connections.
 
The unit rate shall include but is not limited to:
 
1. All costs related to providing under pressure-tapping machines inclusive spare parts as described in the specification.
 
2. All costs related to the acceptance tests as described in the specification.
 
3. Excavation necessary to locate the existing wate「 mainfor makni g the tapping.
 
4. Excavation , dewatering, backfilling, and under pressure installation of tapping, with stopcock and coupling, including supply and installation of the wrapping of the ferrule and the saddle strap.
 
5. Excavation, installation and backfill in compacted layers for the polyethylene pipes under unpaved areas between tapping and duct and/or between duct entrances.
 
6. Installation of polyethylene pipes through ducts to water meters; or through ducts and pulling boxes to water meter boxes.
 
7. Closing duct ends after installation of polyethylene pipes.
 
8. Installation of stop valve, non-return valves, lockablevalve, water meter, fittings, couplings etc in the relevant water meter boxes, all as shown on Tender Drawings.
 
9. Supply and installation of water meter support and watertight closing of 110mm or 160mm diameter outlet holes in water meter box wall
 
10. Testing, disinfection, flushing, commissioningetc. of polyethylene pipes including supply and installation of cap (temporary) at the end of the line.
 
11. Installation of warning tape (as supplied under BOQ No. 1) above polyethylene house connection pipes in unpaved areas.
 
12. All costs related to disconnection of existing consumer connection and connection of newly installed house connection to consumer premises, including mobilisation and demobilisation costs of the house connection crew.
 
The details of the tapping machine(s), which will be used by the CONTRACTOR, shall be submitted fo「 approval to the ADDC /ENGINEER.
 
33.8 Rate for Excavation to Locate Existing House Connections
 
The rates for excavations to locate the existing polyethylene pipes and ferrules for house connections shall be per linear metre given in the relevant Schedule of Prices (Bills of Quantities). The rate shall also include the preparation of drawings and sketches showing the locations of the existing house connection lines including the position of ferrules on the distribution lines and existing consumer water meter, tanks and pumps.
 
34. Exhumation, Reconditioning and Dumping of Pipes and Acces sories
 
The unit rate for exhumation shall include excavation, dewatering, recovery of pipes and fittings, cleaning of pipes and fittings by means of brush for initial inspection and backfilling of 「t enches and plugging off any D.I. o「 A.C. lines left in the ground as directed by the ADDC/ENGINEER. Whenever these excavations are made in the existing and/or proposed roads the backfilling shall be made with thoroughly compacted material approved by the ADDC/ENGINEER to the grade level of the road.
 
The unit rate for recond 幾 ionin g shall include but not be limited to loading/unloading, packing and stacking at site stores, cleaning by means of brush, inspection of material, supply and application of coating/liningmaterial, sand blasting of material as directed by ADDC/ENGINEER
 
The unit rate for transportation of rejected pipeline materials to a Municipality approved dump site or other designated site shall include but not be limited to loading and unloading, costs related to obtaining permission of dumping on the dump site or any other designated site.
 
The unit rate for transportation of surplus o 「 exhumed pipeline materials to ADDC stores and/or ADDC approved site or othe 「 designated area shall include but not be limited to loading and unloading, prepa 「 ation for inspection, double handling, costs related to obtaining permission of dumping on the designated dump site or any other site.
 
The unit rates for collection and transportation to site ADDC free issued D.I. pipeline materials or other materials/accessoriesshall  include, but not be limited  to, loading  and unloading, multiple handling, packing and stacking, transportation to and from Contracto'rs workshop/store, cleaning by means of brush, inspection of material. The rates shall also include supply and application of coating/lining material for repairing/touch-up work upto max. 25% of the total working length/surface area of D.I. pipes and fittings and total area of other materials and accessories.
 
The quantities fo 「 the above mentioned unit rates shall be measured according to the working lengths (for example face to face dimensions for flanged valves).
 
35. Safeguarding of Materials
 
The TENDERER shall allow for all costs involved in safeguarding materials in the ground du 「 ing the period after construction and before the Provisiona l Acceptance Certification. All costs incurred in respect of insurance, secu 「 ity, fencing, lighting, watchman and such like shall be CONTRACTOR's responsib小ty, including for replacement of any materials damaged
 
36. Additional Works Due to Existing Pipework
 
The rates for the WORKS shall include for any costs incurred while liasing with the Operation and Maintenance and Field Services Sections of the ADDC in order to shut down existing live pipelines to carry out the WORKS.
 
37. Alternative Methods of Construction
 
The Schedule of Prices (Bills of Quantities) and drawings are based on an acceptable technical solution to the necessary works. The TENDERER shall price the WORKS in accordance with the specified details but he may also propose alternative details. For such alternatives a fully detailed and priced desc「iption of the work shall be incorporated with his Tende「
 
38. Provisional/Alternative Items
 
Certain items listed in the Bills of Quantities are identified as "開ovisional"or "Alternative" items. It is to be understood that these items may or may not be required to be carried out and shall require the written instruction of the ADDC/ENGINEER before being carried out. The non-utilisation of these items shall not provide grounds for any claim by the CONTRACTOR in respect of reduction of the CONTRACT value. The TENDERER shall enter prices o「 rates against these Provisional Items in accordance with other clauses of these preambles. All "Provisiona"l items shall be priced, extended and taken to the 間 evant summary for inclusion in the total price for the purpose of bid evaluations. For "Alternative" items, prices shall be mentioned in brackets, but it shall not be considered for inclusion in the totals; only the prices of the base item shall be considered for inclusion in the totals.
 
39. Rates Analysis
 
Upon request of the ADDC/ENGINEER, the TENDERER/CONTRACTOR shall produce a detailed analysis of any or all of his tendered and other rates within two working days  of  being  so requested. The rates inserted by the CONTRACTOR for the different items in the respective Schedule of Prices shall be used as basis for any additions/deletions of the respective items.
 
The CONTRACTOR shall, when directed by ADDC/ENGINEER, submit detailed supplementary schedules  breaking down  the rates for composite  units of wo「ks in the Schedules of Prices into their component elements in such detail as shall be required by ADDC/ENGINEER.
 
40. Cad   Drawings  & Word Processing  for  Specifications and Documents
 
Unless otherwise approved by ADDC/ENGINEERdrawings shall be prepared in AutoCAD drafting system conformable to ADDC GIS System in accordance with specifications. The cost items for as-built  drawings  shall  include  the  cost  of  required  prints,  transpa「encies  and  computer floppy diske ttes/CD for the same as detailed in the Schedule of Prices (Bills of Quantities).
 
The Operation and Maintenance Manual, Record Books, etc. shall be prepared as maximum as possible on MS Word or similar computer word processing
 
41. Pipeline Connection I Discinnection
 
The rate for connections / disconnections includes for additional excavations, dewatering, backfilling,  required  additional  working  hours, multiple  cuttings and  multiple  connections  in  any configuration on main and branch lines including removal of pipes, fittings, valves, flow meters, accessories etc., and transport to store, installation of pipes, fittings, valves, flow meters, accessories etc., and all associated works for each tie in point to the new pipeline
 
Pipeline connection / Disconnection shall include the items listed below:
 
The rates for these works shall include for any costs incurred in supporting/liaising with the Operations and Maintenance section of ADDC in order to temporarily shutdown or trial shutdown and carry out the Connection I Disconnection works to DI, HOPE, CS or AC pipelines.
 
In all cases the rates shall include for all costs associated with meeting the requirements of ADDC, Operation and Maintenance section of ADDC in respectof shutdown procedures and any restrictvi e timing for shutdown of pipelines.
 
The rate shall include the p「ov閣 on of lights, generator and any facility「equired for necessary works outside normal working hours.
 
The rates shall include for the provision of additional dewatering pumps and protected sump pits for the rapid removal of water during draining of the existing pipelines at the location of dewatering points.
 
The pipeline sizes mentioned in BOQ are for the main pipeline.
 
42. Construction, Installation and Commissioning of Above Ground Temporary Cs Pipeline
 
Construction of temporary above ground CS pipeline shall include for installation of all materials (C.S flanged pipes, tees, bends, reducers, valves, dismantling pieces, blank flanges, .. 舍 etc), construction of all concrete supports,  fixing  clamps, pipe cutting, welding, fabrication, including detailed design, preparation of detailed construction drawings, method statements, protection of existing  services, provision of bank  guarantee (if required), safety measures,  additional working
 
hours,  connection/disconnection,   dewatering,   pressure  testing  and  disinfection  of constructed
tempo 「 ary pipeline to successfully commission the temporary waterline and ensure secure water supply with minimum disturbance to the consumers.
 
43. Construction, Installation and Commissioning of Underground Temporary CS Pipeline
 
Construction of temporary underground CS pipeline shall include fo 「 installationof all materials (C.S flanged pipes, tees, bends, reducers, valves, dismantling pieces , blank flanges, ...etc), construction of road crossings, pipe protections excavation, backfilling, fixing clamps, pipe cutting, welding,  fabrication,  including  detailed  design,  preparation  of  detailed  construction  drawings, method statements, protection of existing services, provision of  bank  guarantee  (if  required}, safety measures, additional working hours, connection/disconnection, dewatering, pressure testing and disinfection of cons 「t ucted temporary pipeline to successfully  commission  the temporary waterline and ensure secure water supply with minimum disturbance to the consumers.
 
44. Removal/Dismantling and Transportation of Temporary Carbon Steel Pipeline
 
The rates and prices shall include for dismantling, removing and transportation of temporary above ground/undergroundpipes, fittings , valves and all accessories installed for the tempo「ary pipeline including any excavation, backfilling, reinstating of trenches, roads, parking and green areas, connections/disconnection,sdewatering, required additional working hours, multiple cutting, welding, handling, multi transportation, cleaning, repairing and painting where needed, and transportation of material to construction STAGE location within the project area, ADDC store and/or any other location within Abu Dhabi Island assigned by ADDC/ENGINEERas per the project plan and staging construction schedule approved by ADDC/ENGINEER to successfully complete the project scope indicated in the TENDER.
 
The payments for the CONTRACTOR will be equal  installments  for  each  STAGE  as per the project plan and staging construction schedule approved by ADDC/ENGINEER. Payments to the CONTRACTOR  for each stage shall be made only afte「 the successful commissioning of the new permanent waterline  of the intended STAGE.  The final/balance  payment  will be only made after the complete transportation of all materials used for the temporary WORKS to ADDC Store or any other location indicated by ADDC/ENGINEER within Abu Dhabi Island . All materials should be approved by ADDC/ENGINEERafte 「 inspection. The CONTRACTOR shall consider all necessary cleaning ,  repairing,  refurbishment  and  painting  of  the  materials  to  meet  ADDC/ENGINEER approval requirements.
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
PROJECT: Planning and
Development of Master Plan Project No.:
Infrastructure (MPIC) for Training Summary 1 of 1
Village I Al Hafar Region
 
 
SUMMARY SHEET
 
BILL NO. DESCRIPTION AMOUNT (DH)
 
1 SITE WORK AND PRELIMINARIES
 
 
2 ROADWORKS
 
 
3 ELECTRICAL WORKS
 
 
4 TELECOM DUCTING WORKS
 
 
5 SECURITY DUCTING WORKS
 
 
6 WATERWORKS
 
 
7 STORM WATER WORKS
 
 
8 SEWERAGE WORKS
 
 
9 IRRIGATION WORKS
 
 
10 LANDSCAPING WORKS
 
 
GRAND TOTAL OHS.
 
 
GRAND TOTAL (IN WORDS):
 
 
N__O__T_E_·_
Preamble to Bill of Quantities/Scheduleof Prices is a part of this specification and should be considered with this document
 
PROJECT
 
PLANNING AND DEVELOPMENT OF MASTERPLAN & INFRASTRUCTURE FOR TRAINING VILLAGE /AL HAFAR REGION
CONTRACT NO.
 
DAY WORK SCHEDULE (DW)
 
1) Labou「
 
2) Material
 
3) Plant
 
 
PROJECT: Planning and Development of Master Plan & Infrastructure (MPIC) for T「 aining Village / Al Hafar Region
Project No.· PPC/ Day Works Plot No.
P2 PAGE NO.
 
1 of 2
ITEM DESCRIPTION UNIT QTY RATE AMOUNT DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
1.01. IPART 1 · LABOURER
 
 
1.01. 1  !Labour, non-skilled
 
1.01. 2 ILabour, semi-skilled (Assisting tradesman)
 
Hour Hour
 
1.01. 3   ILabour,   semi-skilled  (Operating  light power  operated
mechanical plant vis . rammers, concrete
breakers.) I   Hou r
 
 
1.01.  4  ISurveyor
 
1.01. 5  !Chain man
 
1.01. 6  !Carpenter
 
1.01.  7   ICarpenter's Mate
 
1.01. 8 !Trade man (Working with tools)
 
1.01.  9   IConcrete finisher
 
1.01. 10 ISteel bar bender or fixer
 
1.01. 11 IWelder or burner (Where not included with Plant)
 
1.01.  12 IBlacksmith
 
1.01. 13 IBlacksmith's mate
 
1.01. 14 IElectrician
 
1.01. 15 IElectrician's mate
 
1.01. 16 IF仆ter (Not engaged on plant maintenance)
 
1.01. 17 IFitter's mate
 
Hour
 
Hou「Hour Hour Hour Hour Hour Hour Hour
Hou「Hour Hour Hour Hour
 
1.01. 18 IPlumbe 「
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engine 「e
 
DAYWORK  RATES
No work carried out on a day basis will be measured unless, before starting wo 歡 the Contractor  has obtained the written approval of the Engineer
 
2.02 IPART 2·MATERIAL
 
2.02  1  !Water, brackish Imp. Gals.
 
2.02 2   !Water , fresh Imp. Gals.
 
 
2.02  3   !Portland cement  ,  sulphate resisting portland  (with bags) 6 ton loads (metric tons)
 
2.02 4 !Reinforcing steel mild steel complying with Section V , Concrete Works (metric tons)
 
2.02 5 IPVC waterstop, complying with Section V, Concrete Works
 
2.02 6   IPreformed joint filler, 1.2cm thick, as specified I L.M
 
2.02 7   !Steel angles ,   tees,  channel sections   and plates not exceeding  6mm thickness,  (galvanised) complying with! Tons Section XII, Metal Works (metric tons
 
2.02 8   !Ditto, not exceeding 15mm thick I Tons
 
 
2.02 9   !Timber in planking and strutting ,  not exceeding 5cm thick (5cu. metre loads)
 
2.02 10 IDitto, exceeding 15cm thick (5cu. meter loads)
 
2.02 11 IExtra over timbe「 in planking and strutting left in place
 
2.02 12 !Timber in sawn formwork lining
 
2.02 13 !Lined formwork for surface texture specifiedtreatment as
 
2.02 14 IK-140 concrete delivered on site
 
2.02 15 IK-250 concrete delivered on site
 
2.02  16 IBorrow materia,l load bearing
 
2.02 17 IBorrow material non-load bearing
 
2.02 18 IRigid polyvinylchloride (PVC) conduit, 10cm d舊
 
2.02 19 IDitto, 15cm dia
 
DAYWORK RATES
No work carried out on a day basis will be measured unless , before starting wo 水 the Contractor has obtained the written approval of the Engineer
 
 
2.02 20 IDitto, 20cm dia
 
2.02 21 IPerforated Polyvinyl chloride (PVC) pipe wrapped with filter fabric, 10cm dia.
 
2.2 22 IKerb paint
 
Total CARRIED  FORWARD
 
Day Works
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 DA YWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor has obtained the written approval of the Engineer
 
 
 
3.03. 10 IConcrete mixer (5.0 m 叮
 
3.03. 11 IConcrete prams
 
3.03. 12 IConcrete hand trucks
 
3.03. 13 IConcrete finisher, mechanical
 
3.03. 14 IConcrete vibrator, petrol or electric, with stinger CRANES (PETROL OR DIESEL)
3.03.  15 IMobile road type (10 ton)
 
3.03. 16 I D八to (20-ton) - Dragline
 
Hour Hour Hour Hour Hour
 
Hour Hour
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 
DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 17 IDitto (50-ton)
 
3.03. 18 IDitto {150-ton)
 
3.03. 19 ICrane bucket (attachment) (under 1 m叮
 
3.03. 20 IDitto (5 m叮
 
3.03. 21 ICrane mounted on truck (20 ton)
 
 EXCAVATORS
 
Hour Hour Hour Hour Hour
 
 
3.03. 22 IMechanical, diesel, face shovels, skimmers, drag- lines or back - acters with single equipment
(Maker's rated capacity 0.5 m3) I  Hour
 
3.03. 23 IDitto {Maker's rated capacity 1.0 m3) I Hour
 
3.03. 24 IDitto (Maker's rated capacity 2.0 m3} I  Hour
 
GENERATING  SETS (Petrol or Diesel)
 
 
3.03.  25 IGenerating sets, complete (3 kVA)
 
3.03. 26 IDitto (10 kVA)
 
3.03. 27 IDitto (15 kVA)
 
GRADERS
 
3.03. 28 IBulldozer complete with bull or angling blade (Equivalent to Caterpillar D4)
 
3.03. 29 IBulldozer (Equivalent to Caterpilla「 06)
 
3.03. 30 IBulldozer complete with bull or angling blade (equivalent to Caterpillar 0 8)
 
3.03. 31 !Tractor type with heavy ripper (Equivalent to Caterpillar DSK/No8)
 
3.03. 32 ITrack-Type Loader , 1.15 m 3 bu c ket (Equivalent to Caterpillar 941 B)
 
3.03. 33 IWheel loader (Equivalentto Caterpillar 966)
 
DAYWORK RATES
No work earned out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 34 IDitto, 1.90 - 2.48 m3 bucket (Equivalent to Caterpillar 977 L)
 
3.03. 35 IWheel tractor-scraper, struck, capacity 16 m3 (Equivalent to Caterpillar 631 D)
 
3.03. 36 IDitto, 24.5 m3 (Equivalent to Caterpillar651 B)
 
3.03. 37 IMotor grader, flywheel h.p.-125 (Equivalent to Caterpillar 651 B)
 
3.03.  38 IDitto, h.p.-150 (Equivalent  to Caterpillar 140 G)
 
3.03. 39 IWheel loader, bucket range 1.15 -1.34 m3 (Equivalent to Caterpillar 920)
 
3.03. 40 IDitto, 3.45 - 4.20 m'(Equivalent to Caterpillar980B) RAMMERS  MECHANICAL
3.03.  41 IMechanical, power rammer
 
3.03.  42 ICompactor, (Equivalent to Caterpillar 816)
 
3.03. 43 ICompactor, vibratory type, (5000 cpm)
 
3.03. 44 IPump (submersible 2" to 6") RQLLERS (Petrol or Diesel Driven)
3.03. 45 IRubber tyre, (25-ton)
 
3.03. 46 ISteel roller, under 5 tons
 
3.03. 47 IDitto, over 5 tons
 
3.03. 48 IDouble drum sheep foot roller with tract rammer
3.03. 49 ICompactor, plate type TRUCKS  (Petrol  or Diesel)
 
 
Hour
 
 
Hour Hour
 
Hour Hour
 
Hour Hour
 
 
Hour Hour Hour Hour
 
 
Hour
Hour Hour
Hour _
Hour  
FOR ENDER 0, L V
PA .
 
3.03. 50 ILand rover or pick-up
 
3.03.  51 IPick-up (3 ton - long bed)
 
3.03. 52 IVan or similar utility vehicle (10-ton)
 
Hour Hour Hour
 
2 2 OCT 2012
.-. . ...一,
TE  OOiN M.E. td.
 
Total CARRIED FORWARD
 
Day Works
 
 
 
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
 
 
DAYWORK RATES
No work carried out on a day basis will be measured unless, before starting work the Contractor  has obtained the written approval of the Engineer
 
 
3.03. 53 IDumper (1 m叮
 
3.03.  54 IDumper (4 m3)
 
3.03. 55 IDumper (8 m 叮
 
3.03. 56 IDumper (20 m 叮
 
3.03. 57 IDumper (30 m 叮
 
3.03. 58 ISelf-propelled water sprayer (1000 gal.) (including water)
 
3.03. 59 IWater tanker (3000 gal.)
 
3.03. 60 IWater tanker (5000 gal.)
 
3.03. 61 IUtility truck with 3-ton hoist
 
 MISCELLANEOUS
 
3.03. 62 IDumpy level, staff and ancillary equipment
 
3.03. 63 ITheodolite, staff and ancillary equipment
 
Hour Hour Hour Hour Hour
 
Hour Hour Hour Hour
 
 
Hour Hour
 
3.03.  64 IOxy-acetylene cutting and welding sets inclusive of oxygen and acetylene (excluding underwater
equipment) I   Hour
 
 
3.03. 65 IElectric welding set , 300 amp. including electrodes for single operator
 
3.03. 66 IDewatering equipment including pump, hoses, well points, earth drilling auger, etc. Dewaters up to 50 s.m.
 
 
Total CARRIED  FORWARD
 
Day Works
上海翻譯公司完成工程類英文翻譯

世聯(lián)翻譯-讓世界自由溝通!專業(yè)的全球語言翻譯供應(yīng)商,上海翻譯公司專業(yè)品牌。絲路沿線56種語言一站式翻譯與技術(shù)解決方案,專業(yè)英語翻譯、日語翻譯等文檔翻譯、同傳口譯、視頻翻譯、出國外派服務(wù),加速您的全球交付。 世聯(lián)翻譯公司在北京、上海、深圳等國際交往城市設(shè)有翻譯基地,業(yè)務(wù)覆蓋全國城市。每天有近百萬字節(jié)的信息和貿(mào)易通過世聯(lián)走向全球!積累了大量政商用戶數(shù)據(jù),翻譯人才庫數(shù)據(jù),多語種語料庫大數(shù)據(jù)。世聯(lián)品牌和服務(wù)品質(zhì)已得到政務(wù)防務(wù)和國際組織、跨國公司和大中型企業(yè)等近萬用戶的認(rèn)可。
  • “貴司提交的稿件專業(yè)詞匯用詞準(zhǔn)確,語言表達(dá)流暢,排版規(guī)范, 且服務(wù)態(tài)度好。在貴司的幫助下,我司的編制周期得以縮短,稿件語言的表達(dá)質(zhì)量得到很大提升”

    華東建筑設(shè)計(jì)研究總院

  • “我單位是一家總部位于丹麥的高科技企業(yè),和世聯(lián)翻譯第一次接觸,心中仍有著一定的猶豫,貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),得到了國外合作伙伴的認(rèn)可!”

    世萬保制動(dòng)器(上海)有限公司

  • “我公司是一家荷蘭駐華分公司,主要致力于行為學(xué)研究軟件、儀器和集成系統(tǒng)的開發(fā)和銷售工作,所需翻譯的英文說明書專業(yè)性強(qiáng),翻譯難度較大,貴司總能提供優(yōu)質(zhì)的服務(wù)�!�

    諾達(dá)思(北京)信息技術(shù)有限責(zé)任公司

  • “為我司在東南亞地區(qū)的業(yè)務(wù)開拓提供小語種翻譯服務(wù)中,翻譯稿件格式美觀整潔,能最大程度的還原原文的樣式,同時(shí)翻譯質(zhì)量和速度也得到我司的肯定和好評!”

    上海大眾

  • “在此之前,我們公司和其他翻譯公司有過合作,但是翻譯質(zhì)量實(shí)在不敢恭維,所以當(dāng)我認(rèn)識(shí)劉穎潔以后,對她的專業(yè)性和貴公司翻譯的質(zhì)量非常滿意,隨即簽署了長期合作合同�!�

    銀泰資源股份有限公司

  • “我行自2017年與世聯(lián)翻譯合作,合作過程中十分愉快。特別感謝Jasmine Liu, 態(tài)度熱情親切,有耐心,對我行提出的要求落實(shí)到位,體現(xiàn)了非常高的專業(yè)性�!�

    南洋商業(yè)銀行

  • “與我公司對接的世聯(lián)翻譯客服經(jīng)理,可以及時(shí)對我們的要求進(jìn)行反饋,也會(huì)盡量滿足我們臨時(shí)緊急的文件翻譯要求。熱情周到的服務(wù)給我們留下深刻印象!”

    黑龍江飛鶴乳業(yè)有限公司

  • “翻譯金融行業(yè)文件各式各樣版式復(fù)雜,試譯多家翻譯公司,后經(jīng)過比價(jià)、比服務(wù)、比質(zhì)量等流程下來,最終敲定了世聯(lián)翻譯。非常感謝你們提供的優(yōu)質(zhì)服務(wù)�!�

    國金證券股份有限公司

  • “我司所需翻譯的資料專業(yè)性強(qiáng),涉及面廣,翻譯難度大,貴司總能提供優(yōu)質(zhì)的服務(wù)。在一次業(yè)主單位對完工資料質(zhì)量的抽查中,我司因?yàn)槎砦姆g質(zhì)量過關(guān)而受到了好評�!�

    中辰匯通科技有限責(zé)任公司

  • “我司在2014年與貴公司建立合作關(guān)系,貴公司的翻譯服務(wù)質(zhì)量高、速度快、態(tài)度好,贏得了我司各部門的一致好評。貴司經(jīng)理工作認(rèn)真踏實(shí),特此致以誠摯的感謝!”

    新華聯(lián)國際置地(馬來西亞)有限公司

  • “我們需要的翻譯人員,不論是筆譯還是口譯,都需要具有很強(qiáng)的專業(yè)性,貴公司的德文翻譯稿件和現(xiàn)場的同聲傳譯都得到了我公司和合作伙伴的充分肯定�!�

    西馬遠(yuǎn)東醫(yī)療投資管理有限公司

  • “在這5年中,世聯(lián)翻譯公司人員對工作的認(rèn)真、負(fù)責(zé)、熱情、周到深深的打動(dòng)了我。不僅譯件質(zhì)量好,交稿時(shí)間及時(shí),還能在我司資金周轉(zhuǎn)緊張時(shí)給予體諒�!�

    華潤萬東醫(yī)療裝備股份有限公司

  • “我公司與世聯(lián)翻譯一直保持著長期合作關(guān)系,這家公司報(bào)價(jià)合理,質(zhì)量可靠,效率又高。他們翻譯的譯文發(fā)到國外公司,對方也很認(rèn)可。”

    北京世博達(dá)科技發(fā)展有限公司

  • “貴公司翻譯的譯文質(zhì)量很高,語言表達(dá)流暢、排版格式規(guī)范、專業(yè)術(shù)語翻譯到位、翻譯的速度非�?�、后期服務(wù)熱情。我司翻譯了大量的專業(yè)文件,經(jīng)過長久合作,名副其實(shí),值得信賴�!�

    北京塞特雷特科技有限公司

  • “針對我們農(nóng)業(yè)科研論文寫作要求,盡量尋找專業(yè)對口的專家為我提供翻譯服務(wù),最后又按照學(xué)術(shù)期刊的要求,提供潤色原稿和相關(guān)的證明文件。非常感謝世聯(lián)翻譯公司!”

    中國農(nóng)科院

  • “世聯(lián)的客服經(jīng)理態(tài)度熱情親切,對我們提出的要求都落實(shí)到位,回答我們的問題也非常有耐心。譯員十分專業(yè),工作盡職盡責(zé),獲得與其共事的公司總部同事們的一致高度認(rèn)可。”

    格萊姆公司

  • “我公司與馬來西亞政府有相關(guān)業(yè)務(wù)往來,急需翻譯項(xiàng)目報(bào)備材料。在經(jīng)過對各個(gè)翻譯公司的服務(wù)水平和質(zhì)量的權(quán)衡下,我們選擇了世聯(lián)翻譯公司。翻譯很成功,公司領(lǐng)導(dǎo)非常滿意�!�

    北京韜盛科技發(fā)展有限公司

  • “客服經(jīng)理能一貫熱情負(fù)責(zé)的完成每一次翻譯工作的組織及溝通。為客戶與譯員之間搭起順暢的溝通橋梁。能協(xié)助我方建立專業(yè)詞庫,并向譯員準(zhǔn)確傳達(dá)落實(shí),準(zhǔn)確及高效的完成統(tǒng)一風(fēng)格。”

    HEURTEY PETROCHEM法國赫銻石化

  • “貴公司與我社對翻譯項(xiàng)目進(jìn)行了幾次詳細(xì)的會(huì)談,期間公司負(fù)責(zé)人和廖小姐還親自來我社拜訪,對待工作熱情,專業(yè)度高,我們雙方達(dá)成了很好的共識(shí)。對貴公司的服務(wù)給予好評!”

    東華大學(xué)出版社

  • “非常感謝世聯(lián)翻譯!我們對此次緬甸語訪談翻譯項(xiàng)目非常滿意,世聯(lián)在充分了解我司項(xiàng)目的翻譯意圖情況下,即高效又保質(zhì)地完成了譯文�!�

    上海奧美廣告有限公司

  • “在合作過程中,世聯(lián)翻譯保質(zhì)、保量、及時(shí)的完成我們交給的翻譯工作�?蛻艚�(jīng)理工作積極,服務(wù)熱情、周到,能全面的了解客戶的需求,在此表示特別的感謝。”

    北京中唐電工程咨詢有限公司

  • “我們通過圖書翻譯項(xiàng)目與你們相識(shí)乃至建立友誼,你們報(bào)價(jià)合理、服務(wù)細(xì)致、翻譯質(zhì)量可靠。請?jiān)试S我們借此機(jī)會(huì)向你們表示衷心的感謝!”

    山東教育出版社

  • “很滿意世聯(lián)的翻譯質(zhì)量,交稿準(zhǔn)時(shí),中英互譯都比較好,措辭和句式結(jié)構(gòu)都比較地道,譯文忠實(shí)于原文。TNC是一家國際環(huán)保組織,發(fā)給我們美國總部的同事后,他們反應(yīng)也不錯(cuò)�!�

    TNC大自然保護(hù)協(xié)會(huì)

  • “原英國首相布萊爾來訪,需要非常專業(yè)的同聲傳譯服務(wù),因是第一次接觸,心中仍有著一定的猶豫,但是貴司專業(yè)的譯員與高水準(zhǔn)的服務(wù),給我們留下了非常深刻的印象�!�

    北京師范大學(xué)壹基金公益研究院

  • “在與世聯(lián)翻譯合作期間,世聯(lián)秉承著“上善若水、厚德載物”的文化理念,以上乘的品質(zhì)和質(zhì)量,信守對客戶的承諾,出色地完成了我公司交予的翻譯工作�!�

    國科創(chuàng)新(北京)信息咨詢中心

  • “由于項(xiàng)目要求時(shí)間相當(dāng)緊湊,所以世聯(lián)在保證質(zhì)量的前提下,盡力按照時(shí)間完成任務(wù)。使我們在世博會(huì)俄羅斯館日活動(dòng)中準(zhǔn)備充足,并受到一致好評�!�

    北京華國之窗咨詢有限公司

  • “貴公司針對客戶需要,挑選優(yōu)秀的譯員承接項(xiàng)目,翻譯過程客戶隨時(shí)查看中途稿,并且與客戶溝通術(shù)語方面的知識(shí),能夠更準(zhǔn)確的了解到客戶的需求,確保稿件高質(zhì)量�!�

    日工建機(jī)(北京)國際進(jìn)出口有限公司

中国熟妇乱子hdsex粗| 高清偷自拍亚洲精品三区| 日日狠狠伊人久久| 69国产成人精品午夜福无毒| 国产精品羞羞答答| 一区二区三区无码精久久| 国产精品一区二区久久国产抖音| 国内精品久久久久AV福利秒拍| 人妻中出中文字幕資源免費看| 隔壁放荡的人妻在线看中文| 欧洲精品aaa一区二区| 国产精品国产亚精品不卡 | 国产特级全黄一级97毛片电影| 99在线免费观看黄片| 女人18毛片18A级水真多| 884aa四虎影成人精品| 久久国产精品15色老板| 日韩免费高清一级毛片久久| 麻豆国产91视频| 国产高清在线观看AV片| 久久久久中文字幕1区| 四虎sihu新版影院亞洲精品| 99视频精品全部免费在线| 亚洲成片观看四虎永久网站| 最近免费MV在线观看| 国产亚洲精品精品在线精品| 97久久一精品人妻人人玩| 丰满少妇猛烈进入无码| 亚洲国产成人高清一区在线| 高清无码免费不卡视频| 377p欧洲日本亚洲大胆噜噜| 青青青国产女精品视频| 91久久精品美女高潮| 日韩特黄精品一在线看| 超碰97人人天天夜夜| 精品国产日韩在线观看| 免费啪视频在线观看视频日本| 國產精品99久久| 成人久久免费视频| 一级婬片一级视频| 色噜噜狠狠狠狠狠色综合| 不卡一卡二卡在线视频黄色大片免费在线观看 | 欧美日韩aⅴ人妻| 在线观看无码高清aaa| 亚洲视频一区二区三区久久| 香蕉久久AB一区二区三区| 日本一区二区三区三州| 日本少妇一级婬片HD69网站| 日韩免费无码| 在线综合亚洲欧美成人影院| 丁香亚洲综合五月天婷婷| 精品国产91无码大片在线观看| 狼友久久国产精品| 自偷自偷自亚洲首页精品| 国产极品午夜在线观看| 69国产成人精品午夜在线| 日韓歐美一區二區三區不卡| 日韩黄色高清视频| 日本中文字幕视频一区欧美激情 | 日韩美女自慰又黄又粗| 亚洲福利片欧美日韩一线相关内容首页 | 亚洲AV秘 无码一区二区久| 久久精品国产99国产精品严洲 | 欧美精品在线观看不卡一区| 熟妇久久综合中文色鬼| 超碰在线99免费在线不卡| 久久精品国产精品亚洲艾草| 大乳爆乳无码一区二区三区| 免费国产成人午夜在线观看| 日韩黄色高清视频| 国产精品国产三级国产午| 成人女人在线观看| 亚洲精品成人一二三区| 日本特黄特色大片免费在线观看| 美女裸体视频在线无卡黄色免费网站| 欧美日本成人免费| 浪潮国产精品久久久久?v浪潮| 人妻蜜臀av一区二区| 日本AⅤ精品中文字幕在线 | 亚洲图片视频欧美日韩| 99久久国产热无码精品免费久久精品A亚洲国产V高清不卡 | 丝袜ol美脚秘书在线播放| 久久爽av鲁丝无码中文| 电车痴汉侵犯短裙人妻| 精品国产青草久久久久福利| 亚洲高清美女在线| 成人亚洲欧美在线观看| 免费国产一区二区久久| 国产在线麻豆精品观看| 亚洲中文字幕丁香婷婷| 性国产日韩欧美一区二区在线| 久久久久久无码精品国产小说 | 亚洲精品国产成人影片在线观看| 日韩精品老熟女视频网站免费观看| 国产成人AV一区二区三区| 日本黄线在线视频免费看| 四虎影视国产免费| 欧美一级aa大片免费看视频 | 91成人午夜福利在线观看国产| 一女享受夫奴口舌伺候| 精品久久久久免费免费自慰| 女人19水真多免费毛片| 美女任你摸免费视频| 久久精品亚洲精品五月色| 青草影院内射中出高潮 | 人人色人人干人操| 美人+妻+影音先锋| 亚洲国产av无码综合原创国产 | 久精品视在线中文字幕| 亚洲图片视频欧美日韩| 日本高清中文无卡| 亚洲国产激情小说视频| 欧美性爱激情| 亚洲欧洲日本三级视频| 歐美性一交激情視頻在線| 欧美日本不卡一二三区| 欲色欲香天天影院亚洲第一香蕉狼人 | 91欧美激情一区二区三区成人日韩99久久综合狠狠综合久久 | 黄色一级国产精品| a狠狠久久蜜臀婷色中文网| 国产成人精品在线不卡| 538pro精品视频我们不只是| 久久精品亚洲精品五月色| 在ktv上班被客人吃奶头| 成人久久久一区二区| 亚洲人看A∨免费片| 欧美亚洲国产另类在线| 欧美日韩在线视频h| 亚州中文字幕| 搡女人真爽免费视频人成午夜| 九九在线观看高清免费| 欧美成人aa久久狼窝五月 | 父子1v2她还是你的小心肝| 亚洲手机在线成人| 一级做性色α爱片久久毛片色| 夜夜欢av一区二区三区| 精品动漫中文字幕一区| 免费乱伦亚洲无码| 国产麻豆成人传媒免费观看| 色欲?ⅴ精品一区二区三区四区| 丝瓜草莓www在线观看| 久久国产中文字亚洲幕| 国产第一自拍| 亚洲一级日本在线播放| 一级女性牲交免费视频 | 91精品国产高潮久久久久| 欧美一级视频高清片| 向井蓝中文字幕一区二区三区| 丝袜美足国产一区在线| 永久免费毛片久久99| 曰木一级a级高清毛片| 日韩无码高清wwww| 久久艹这里只有精品| 人妻日韩AV无码一区二区| 美女任你摸免费视频| 四虎sihu新版影院亞洲精品| 免费A级毛卡片不收费视频| 厨房里强摁做开腿呻吟动漫| 曰本大码熟中文字幕| 国产亚洲精品精品在线精品| 欧洲另类综合| 区二区三区在线观看视频| 欧美日韩国产性爱| 亚洲AV无码国产精品色午夜久久| 亚洲欧美中文李幕高清在线| 女人被男人桶| A级成人婬片免费看无码| 久久久综合精品一区二区三区无码| 在线免费观看国产视频| 青青草无码精品伊人久久网站| 天天摸日日摸狠狠添高潮喷| 好色先生日逼的视频| ddd54手机免费看| app搞鸡视频在线观看黄色| 日本乱中文字幕系列在线看| 免费丰满少妇一级毛片| 一区二区三区在线观看欧美| 2022v视频无码高清网站| 天美传媒mv免费观看| 国产真实深喉口爆吞精视频| 欧美特黄三级又爽又粗| 成年午夜免费aⅴ在线观看| 久久精品国产国产精品久久| 亚洲精品国产导航一区二区| 91精品國產免費久久國語蜜臀| 精品亚洲国产成人无码| 国产日韩另类综合11页| 成人毛片视频亚洲| 女人被男人躁的爽免费视频| 成人国产精品福利视频| 亚洲三级毛片在那看| 久久综合网欧美色妞网| 茄子成年app在线观看| 国产精品sea8视频| 国产这里有精品视频互動交流| 亚洲欧美日韩精品专区52| 欧美污污污久久久久久| 91人妻午夜综合精品视频| 天堂网www天堂在线资源| 精品三级66在线播放| 又黄又爽国产免费网站在线观看| 无码av蜜桃av色欲| 国产91在线中文字幕无码| 91香蕉视频国产免费下载| 国产精品美女白丝自慰| 国产精品美女久久久久久大全| 亚洲αv无码不卡一区二区三区| 国产三级片大全网| 日韩欧美偷拍人妻丝袜第一页| 欧美大尺度禁片露器官电影观看| 一区欧美激情桃花| 99国产精品视频一区二区69堂| 欧美亚洲免费播放一区| 91香蕉app下载汅api免费网站无限看| 国语对白刺激真实精品| 九九九九在线精品免费视频| 亚洲制服精品一区二区三区| 黑人巨茎大战俄罗斯白人美女| 189国产亚洲精品视频第1页| 成年无码AV片在线蜜芽| 成人限制第一页| 欧美日韩在线二区下载| 高清免费人成在线视频观看| 国产强上视频在线观看| 伊人影院在线播放| 三级毛片高清一区| 色就色综合偷拍区欧美| 欧洲毛片自拍偷拍网站| 国产精品a久久久久| 人妻精品久久一区二区| (愛妃)久久AV无码精品人妻出轨| 亚洲欧美日韩另类色图 | 添添躁狠狠躁| 日本少妇一级婬片HD69网站| 女人被男人躁的爽免费视频| 亚洲欧美另类久久| 韩国三级电影久久久| 亚洲国产精品成人一区二区小说| 丁香亚洲综合五月天婷婷| 欧美人妻精品一二三区| 樱桃视频草莓视频幸福宝| 18禁止裸身美女动漫网站| 电影天堂免费在线观看| 国产人妻高清国产拍精品| 日本AⅤ精品中文字幕在线| 日韩在线试看一区96丝袜| 婷婷伊人久久大香线蕉AV| 一级特黄视频免费播放| 日韩国产欧美中文字幕在线播放| 国产精品成人嫩草影院| 无码制服丝袜一区| 人妻少妇精品久久人妻| 欧美激情四射一区二区在线| 久久久久免費精品視頻| 久久亚洲av成人网| 好爽快点我受不了了视频| 欧美性生活视屏精品| 亚洲熟妇无码AV| 跪趴着被主人狠狠调教| 国产特黄色一级| 中文字幕一本久久综合| 国产亚洲精品美女2020久久| 黑人和少妇冒白浆了 | 欧码无码久久久| 精品久久久久久无码人妻外国| 天天草天天射| 久久精品国产精品亚洲艾草 | 久久精品2021国产| 91果冻精品国产自产自产在| 久久久亚洲av无码精品色午夜 | 国产在线麻豆精品观看| 玖玖玖在线视频免费观看| 美女任你摸免费视频| 91k国产在线观看尤物| 玖玖玖在线视频免费观看| 激情男女高潮射精?V免费| 国内真实刺激对白自拍视频 | dy888午夜国产精品亚洲| 中文字幕日韩亚洲视频在线| 日韩无码一区二区高清视频| 自拍亚洲欧美另类动漫| 高潮时奶水喷出来了| 国产经典网红福利视频网站| 亚洲AⅤ成人综合网伊人APP| 日韩一级色网中文字幕| 一级毛片av一区| 欧美成人aa久久狼窝五月| 女人被添荫蒂潮喷视频| 女佣的味道hd中字在线观看| 国产91对白在线播放边| 午夜精品人成在线观看| 欧美综合自拍亚洲久久| 日韩 一国产一无码一日韩| 国产精品视播放一区二区三区| 亚洲综合精品二三区| 亚州中文字幕不卡影院| 亚洲乱码国产乱码精品精乡村| 黑人处破女免费播放| 18禁止裸身美女动漫网站| 亚洲日本韩国成人在线视频| 国产乱婬AV麻豆剧传媒牛牛影视| 永久免费毛片久久99| 麻豆国产91视频| 欧洲精品高清无码一区二区三区| 亚洲色拍国产另类| 高清免费人成在线视频观看| 日韩欧美国产手机在线观看| 91精品导航在线观看| 免费在线亚洲| 欧美日韩aⅴ人妻| 最近最中文字幕视频 | 97超碰国产精品| 永久免费观看啪啪网站欧美| 欧美精品在线观看不卡一区| 亚洲婷婷影院女优视频网站| 中文av旡码高清在线| 午夜福利啪爽国产片精品| 欧美三级电影天堂| 久久久综合视频一本| 日日澡夜夜澡人人| 成人无码视频在线观看| 国产乱子伦在线观看免费| 中文字幕无码一区二区乱码| 俄罗斯aaaaa特级毛片| 色综合久久中文字幕无码色欲| 国产一区二区三区精品高清| 91香蕉app下载汅api免费网站无限看 | 熟妇久久综合中文色鬼| 韩国国产一级片在线观看| 日韩精品一区国产偷窥在线| 丁香婷婷深情五月丁香中文字幕| 精品成在人线AV免费| 国产黄色三级三级三级| 欧美在线国产一区| xxxx欧美丰满大屁股| 国产日韩欧美精品区性色| 天天操天天曰| 日韩人妻熟精品久久无码少年阿宾| 奇米777在线影视四色首页| 轻轻色国产在线视频| 国产免费午夜福利在线播放92| 国产欧美精品一区二区三区-老狼| 国产中文亚洲熟女曰韩| 欧美亚洲国产另类在线| 在线观看免费国产一区二区| 天堂网2021天堂手机版| 天堂av2017男人的天堂| 天堂成人一区二区三区av片| 国产成a人亚洲精v| 中文字幕无码乱人妻| 狠狠色狠狠色綜合久久第一次 | 亚洲农夫色无码在线| 网红久久精品一区二区| 久久五月天影院| 日韩欧美偷拍精品一区| www.91大地资源二中文在线观看官网成全更新视频 | 性XXXXX欧美老肥婆多毛| 欧美在线免费亚洲| 在线无码无码播放视频| 国产啪嗒啪嗒无遮美女视频 | 无码人妻侵犯一区侵犯| 手机成人免费视频| 精品国产99国产精2021| 久久久亚洲成人aⅴ| 成人自拍视频在线观看| 最近2019中文免费字幕在线观看 | 91精品无码专区免费| 中文久久三级欧美| 国产免费牲交视频38禁| 国产偷窥熟女精品| 完整版av片永久免费| 在线国产网站中文字幕av| 了解最新国产精品视频一区二区三区经| 女人18毛片18A级水真多| 韩国成人AV网站在线观看| 91欧美激情一区二区三区成人日韩99久久综合狠狠综合久久 | 国产精品国产三级国产午| 国产精品影音先锋69| 性欧美亚洲第一综合天堂另类专 | 香蕉国产人午夜视频在线| 男女视频网站一区二区三区免费| 亚洲有无码av在线播放| 日韩激情一级毛片| 免费观看60秒做受视频| 日本不卡一区在线| 亚洲国产欧洲韩国高清专区| 日韓歐美一區二區三區不卡| 在线免费观看国产视频| 久久久久久久女国产乱让韩| 中文字幕乱码亚洲v日本| 日本强伦姧人妻完视频正版| 日韩免费高清一级毛片久久| 狠狠干2017欧美最新| 成人在线免费观看黄片| 久久99国产精品二区不卡| 日本一区二区三区在线视频观看免费| 日本又色又爽又黄的网站免费| 日本无码一区AⅤ二三区超碰| 欧美日韩一二区在线观看| 国产在线一区二区三区乱码| 色夜av网午夜福利片| l精品国产亚洲区久久99| 亞洲A∨精品一區二區三區下載 | 国产一级国产一级在线观看| 亚洲无码高清免费视频亚洲| 双性调教结婚每日淫训| 国产丰满老女人A片免费观看| 欧美视频日韩视频国产视频| 亚洲熟妇av一区二区三区痴汉| 欧美国产在线一区精品自拍| 欧美激情四射一区二区在线 | 国产欧美日韩视频一区在线观看| 一级做a爰片久久毛片免费看| 国内高清A自拍视频| 91久久精品国产免费一区| 人人干在线视频| 日韩一区二区三区在线看| 缅甸恐怖网站lomando| 色欲?ⅴ精品一区二区三区四区| 黄色AAA大片免费| 韩国国产一级片在线观看 | 成在人线Aⅴ免费观看| AV无码免费1区2区3区| 亚洲欧美日韩制服综合| 欧洲另类综合| 鲁丝片一区二区在线观看| 亚洲免费成人在线| 无码区一二区mv| 色呦呦网站免费| 中国激情一区二区三区成人| 野花社区最新免费视频| 超碰在线99免费在线不卡| 成人3d动漫一区二区三区| 又黄无遮挡无码的免费视频| 日本高清在线视频无码| 曰本av无码免费不卡| 国产精品无码久久A∨不卡| 一区二区三区无码在线| 久久亚洲乱码一区| 在线观看麻豆| 私人影院午夜在线观看| 国产av一区二区三区香焦| 国产乱码人妻一区二区三区| 日韩精品一区国产偷窥在线| 亚洲100部在线观看| 日本www成人网站在线观看| 在厨房拨开内裤进入在线视频| 欧美日韩字幕一区| 秋霞电影伦理手机版| 波多野结衣午夜福利| 99热手机在线最新地址| 久久久精品一区二区藌桃| 成年人国产一级片| 欧洲成熟女人色惰片| 高清偷自拍亚洲精品三区| 被男狂揉吃奶胸高潮视频在线观看| 久热国产精品视频一区二区| 熟妇av日韩不卡| 一二三四高清在线观看视频中文| 国产白浆在线视频网| 免费国产成人无码学生妹| 欧美性生活视屏精品| 91精品国产高清一区二区三密臀| 一级婬片一级视频| 惠民福利久久精品国产亚洲7777| 国产又粗又黄又爽又硬的免费视频 | 91视频欧美青青草| 國產午夜人做人免費視頻中文| 香港三级日本三级妇三级| 无码制服丝袜一区| 超碰在线99免费在线不卡| 国产亚洲日韩网曝欧美11| 又黄又爽又硬网站| 中文人妻久久| 三级在线观看mmm| 人妻一区在线播放| 天天草天天射| 亚洲成熟妞人婬i片在线观看| 欧洲亚洲美洲va国产综合193| 四虎永久在线免费视频一二区| 欧美一区二区亚洲成人| 99视频在线看观免费| 韩国美女精品久久久久久| 一级毛片av一区| 精品自拍一區| 久久国产午夜精品免费一区二区| 亚洲成熟妞人婬i片在线观看| 国产成人av大片大片在线播放| 一级婬片一级视频| 特级a毛片免费观看| 向井蓝中文字幕一区二区三区 | 亚洲色欧美日韩在线影院| 老师和学生边上课边做h| 国产高清在线观看AV片| 中文无码一区99xav| 国产欧美一区二区日本加勒比| 日本丰满护士bbw| 图片区电影区激情区小说区| 久久五月天影院| 国产美女性爱亚洲性爱在线观看| 伊人蕉影院久亚洲影院| 亚洲欧美日韩岛国色图| 日韩殴无码中文字幕| 国产盗摄精品一区二区酒店等| 国产黄色在线网站| 国产在线一区二区三区乱码 | 性欧美高清短视频免费| 外国av在线免费观看| 中文字幕无码一区二区乱码| 精品视频在线观自拍自拍| 中文字幕乱码一区二区三区蜜桃成熟时 | 搡女人真爽免费视频人成午夜| 成人在线免费观看黄片| 18观看免费永久视频| 欧美成人香蕉在线视频| 一区二区精品在线| 国产一国产精品免费播放| A级成人婬片免费看无码| ?V无码小缝喷白浆在线观看| 久久久久国色aV免费软件| 思思久久96麻豆| 国产成人av麻豆精品| (愛妃)久久AV无码精品人妻出轨 | 黑人巨大精品无码专区| 国产超碰97老师人人看| 国产一级a毛一级a看免费视频国产suv精品一区二区6 | 国产成 人 亚洲 综合| 午夜福利男女xx00视频网站| 亚洲欧美日韩中文高清| 中文字幕久无码免费久久| 久久精品国产国产精品久久| 亞洲國產歐美在線觀看| 国产精品美乳| 国产精品久久久久片免费又是看| 久久黄色高清视频。| 九九热最新国产视频| 青青青国产女精品视频| 国产午夜福利精品一区二区久久| 亚洲AV日韩在线一区二区三区| 日韩在线视频中文一区二区视频综合 | 国产高清视频在线播放一区二区三区 | 国产乱婬AV麻豆剧传媒牛牛影视| 久久精品久久精品中文字幕| 久久精品aⅴ无码| 国产αV无码日韩αV无码网站| 国产Av激情久久无码天堂| 日韩欧美女破处视频免费观赏| 国产成人欧美综合在线观看| 日韩2022中文字幕| 国产综合内射日韩久| 亲胸揉胸膜下刺激视频试看| 波多吉野一区二区三区av| 久久黄色美女小视频网站| 18禁动漫一区二区三区| 三级在线看中文字幕完整版| 欧美日韩精品区久久久| 欧美性爱综合网站99国品区区视频| 波多野吉衣在线A片免费播放| 亚洲毛片精品二区| 国产精品成人嫩草影院| 奶茶视频APP黄在线播放| 韩国午夜理论a三级在线观看 | 车子越颠进入的更深h| 樱桃视频草莓视频幸福宝 | 精品无码久久久久国产| 亚洲一区日本在线| 久久精品久久观看| 色欲?ⅴ精品一区二区三区四区 | 国产精品久久成年人免费视频| 国产精品中文一区二区三区| 日韩欧美国产不卡一区二区| 久久午夜片电影鲁丝午夜精品| 欧美成人香蕉在线视频| 91好色先生下载污| 久热这里只有国产中文精品 | 亚洲 综合 视频 一区| 亚洲三级毛片一区二区| tobu8 天堂网www中文在线| 国产在线观看91精品| 人人色人人干人操| 少妇挑战黑人4p惨叫| 国产极品午夜在线观看| 性白俄罗斯高清xxxxx| 拔萝卜免费观看高清视频下载 | 一区二区放荡亚洲人妇| 欧美日韩最新精品一二区热热| 亚洲永久免费无码打屁股| 亚洲va欧美a国产va综合| 午夜精品成人一区二区三区 | 四虎影视国产免费| 波多吉野一区二区三区av| 亚洲成a人无码无卡| 激情在线视频| 精品二区三区在线观看| 奇米777在线影视四色首页| 欧美成人国产精品一区二区| 又色又爽又硬又刺激的视频| 日韩国产精品一级毛片在线| 91精品无码专区免费| 欧美日韩一二区在线观看| 中文少妇无码影视| 无人视频免费观看免费视频 | 超碰97人人天天夜夜| (凹凸)青草制服丝袜一区第一页| 久久久久国产精品嫩草影院| 久久国产精品15色老板| 白洁老师国产麻豆片| 女人18毛片18A级水真多| 国产又粗又大又硬又爽免费视频| 亚洲一区二区三区aⅴ无码| 午夜毛片精彩毛片| 日韩人妻熟精品久久无码少年阿宾| 外国av在线免费观看| 日韩精品一级一区| 国产又黄又爽又大的免费视频| 五月天丁香色| 日韩婬乱a一级毛片视频| 欧美国产在线一区精品自拍| 欧美性猛交xxxxx水多| 亚洲三级毛片一区二区| 亚洲av无码网站yw尤物| 亚洲制服精品一区二区三区| 亞洲國產歐美在線觀看| 99视频精品全部免费在线| 国产亚洲日韩网曝欧美11| 国产强奷在线播放免费重| 这里只有好看的a视频| 亚洲综合男人的天堂色婷婷| 亚洲人看A∨免费片| 图片区电影区激情区小说区| 亚洲AAA一级无费看| 成人欧美一区二区三区在线观看| 午夜最新电影| 久久婷婷色中文字幕免费高清 | 成人女人在线观看| 特级无码毛片在线观看| 国产精品久久久久久五月天加勒比| 午夜福利男女xx00视频网站| av天堂av亚洲啪啪久久无码| 亚洲一级特黄毛片| 高清无码免费不卡视频| 在线播放国产视频99| 国产精品麻豆综合在线| 日韩黄色大片在线观看| 久久久久久久久av毛片| 91视频污APP色版下载| 91精品一二区久久无码电影| 超碰真人在线| 妓女妓女一区二区三区在线| 久久精品国产亚洲av夜色九虎| 思思热这里只有精品5| 老外黑人一级毛片| 韩国成人AV网站在线观看| 日本久久高清一区二区三区| 少妇太爽了在线观看视频| 一级做a爱片高潮毛片| 三级在线看中文字幕完整版| 91精品一二区久久无码电影| 久久综合综合久久?V在钱| 国内精品久久久久久婷婷| 中文字幕不卡乱偷在线| 久久久噜噜噜久久中文字幕色伊伊| 国产一级无码| 免费乱伦亚洲无码| 18午夜片无码区私人影院| 97人人视频波多野结衣蜜月 | 激情在线日韩欧美日韩| 亞洲國產歐美在線觀看| 国产自慰喷水视屏| 日本无遮挡h肉动漫在线观看| 成人亚洲狠狠一二三四区| 香蕉久久一區二區不卡無毒影院| 操小孩污视频在线免费观看| 91精品国产综合久久久亚洲日韩 | 国产激情在线91| 日韩欧美国产免费一二三区| 国产一边做一边爱视频| 久久国产这里只精品免费 | 婷婷六月天激情| 国产精品羞羞答答| 久久久一二三区精品| 图片区小说区另类春色蜜芽| 欧美激情四射一区二区在线| 亚洲欧美精品国产电影| 国产一级性爱一级视频自拍| 日韩在线精品一二三区| 特级a毛片免费观看| 无码专区 免费在线| 狼友小视频在线观看| 色夜av网午夜福利片| 夜夜高潮夜夜爽精品视频| 二次元人物桶二次元人物免费网站| 国产片精品mv在线观看| 黄色欧美三级在线看| 国产超级无码一极毛片| 做爰高潮a片视频35分钟| 欧美亚洲少妇高清| 国产三级片大全网| 无码日韩做暖暖大全免费| 6080精品人妻一区| 狠狠色狠狠色綜合久久第一次 | 欧美日本成人免费| 国产成人AV一区二区三区| 小编在这里为大家带来看日韩黄色毛片 | 国产美女性爱视频免费| 久久九九青青国产精品| 欧美成人香蕉在线视频| 精品国产女主自在线久草| 亚洲丰满少妇色网视频网| a级毛片高清免费视频在线| 亚洲国产成人高清一区在线| 日韩产品和欧美产品的区别| 久久精品无码亚日韩免费影视观看中文 | 中文字幕人妻毛片av| 最近2019中文免费字幕在线观看| 97精品日韩永久性无码| 亚洲熟妇无码AⅤ不卡在线播放| 国产不卡免费在线视频| 国语自产拍在线观看99网| 国产啪嗒啪嗒无遮美女视频| 国产精品色哟哟免费看麻豆| 日本黄色影片在线观看| 久久精品aⅴ无码| 一级a爱片国产亚洲精品| 电影《色戒》未删减版| 国产精品熟女第7页| 久久午夜福利久久网| 久久图片视频小说| 亚洲美女在线免费视频| 午夜视频成在线人成在线人| 美女裸体视频91免费国产| AV免费不卡国产在线观看 | 在线观看精品一区二区三区 | 福利姬白浆AV导航| 国产影视乱伦三级| 9191精品国产免费久久国语| 精品在线观看免费一级毛片| 亚洲爱潮AV永久无码浪潮AV| 高清区一区二区在线播放| 啊灬啊别停灬用力啊黑人| 亚洲天堂在线观看完整版| 亚洲 欧洲 日韩 综合AV| 国产又粗又黄又爽又硬的免费视频| 国产精品视播放一区二区三区| 综合 欧美 日韩 中文字幕| 午夜精品人成在线观看 | 黄色av网页地址一| 日韩欧美精品亚洲一区二区| 国产天堂网www在线资源av网| 67194在线观看熟妇 | 又脱又摸下面激烈免费视频| 中国幻女free性zozo交体内谢| 日本国产一区二区三区在线观看| 大又大粗又爽又黄少妇毛片视频| 四虎国产在线| 天堂在线中文最新版地址| 亚洲婷婷影院女优视频网站| 欧美在线免费亚洲| 女性喷液过程高清免费视频| 亚洲影库日韩久久久| av午夜福利一片看久久| 思思久久96麻豆| 免费黄色小说视频| 日本久久一区二区免费| aⅴ色综合久久天堂av色综合| 日韩在线视频中文一区二区视频综合 | 99精品亚洲国产精品| 人妻系列专区无码在线| 亚洲色拍国产另类| 特级西西西4444大胆无码| 中文字幕无码专区dvd在线| 又黄无遮挡无码的免费视频| 精品妇人妻视在线视频| 无码av蜜桃av色欲| 夜夜操天天爽| 四虎www成人影院观看| 国产中文自拍无码| 天天爽天天爽免费视频| 亚洲女人视在线| 国产第页日本草草影院香蕉| 九九九九在线精品免费视频| 久久毛片免费一区二区三区电影 | 亚洲第一aⅴ天堂在线观看| 久久精品人妻一区二区三区一| 青青草中国三级片| 91无码偷拍精品一区二区三区| 亚洲乱码国产乱码精品精乡村 | 欧美另类性视频| 最新av网站网址免费观看| 福利视频日韩欧美国产| 亚洲性爱视频网站一级看片| 欧美巨大激情久久久| 国产福利一区99| 亚洲黄片账号免费| 国产亚洲国际精品福利| 亚洲一区二区一区| 亚洲AV无码乱码忘忧草亚洲 | 日韩免费无码| 亚洲中文字幕丁香婷婷| 一色屋精品无码免费视频| 欧美另类亚洲日韩精品一区二区不卡| 欧洲精品aaa一区二区| 亚洲有无码av在线播放| 国产精品国产欧美综合一区| 国产聚色窝在线首页| 夜夜添无码试看一区| 日本羞羞视频在线观看| 欧美日韩国产在线一区二| 日韩av中文无码人妻无码 | 很很鲁免费视频在线观看| 草莓视频免费在线看| 亚洲综合五月天激动情网 | 国产精品老师好紧好爽最新毛片| 欧美猛少妇色xxxx久久久久 | 免费+无码+国产www| 国产精品免费播放器大全| 亚洲精品成人国产| 在线观看xxxx国产| 91精品无码专区免费| 人妻系列专区无码在线| 欧美老熟妇夜夜爽| 国产性爱第8页在线观看| 无码国产福利av私拍导航| 被仇人狠狠开发了by小小巴士| 狠狠色丁香婷婷综合久久网站| 美女视频一区二区三区在线| 三级在线免费a免费看| 亚洲码专区欧美色图久久| 欧美亚洲精品另类| 亚洲国产香蕉视频欧美明星换脸| 亚洲人成网站18岁禁止| 做爰高潮a片视频35分钟| 老司机带带我精品视频| 一区二区三区色网视频在线观看| 内裤堵嘴app高清| 另类亚洲欧美精品综合| 裸体美女十八禁久久精品| 国产激烈刺激网站免费观看| 亚洲农夫色无码在线| 91久久精品国产免费一区| 99RE6国产精品99RE在线| 十大禁止安装app软件入口免费| 91精品国产高潮久久久久| 成在线人av免费无码高潮喷水| 亚洲无码日韩精选中文字幕| 最近在线中文字幕更新| 日韩黄色大片在线观看| 国内精品自线一区二区2021| a免费在线观看| 国产麻豆成人传媒免费观看 | 国产精品二区在线| 亚洲午夜一区二区三区福利| 九九免费喷水视频| 国产在线播放线视频免费| 极品人妻videos人妻| 全免费a级毛片免费| 国产AV三级精品成人网站| 日韩乱女乱妇熟女熟妇av| 中文字幕av美利坚合众国无码| 久久蜜精品国产AV网站| 免费av中文字幕| 亚洲人成人一区在线观看| 制服丝袜物喷水亚洲综合精品| 性XXXXX欧美老肥婆多毛| 亞洲歐美偷拍另類| 日韩免费无码人妻波多野| av日韩色情三级在线看| 字幕大全网址撩人精品磁力视频二区| 人妻仑乱少妇a级毛片| 2022v视频无码高清网站| 免费乱伦亚洲无码| 国内9l视频自拍老熟女九色| 国产黄色精品www| 亚洲人成人一区在线观看 | 午夜毛片精彩毛片| 精品妇人妻视在线视频| 亚洲色综合中文字幕在线| 网红久久精品一区二区| 国产又粗又长又爽黄又硬视频 | 国产特黄a三级三级三级| 欧美人成一本免费观看视频| 久久五月天影院| 日韩色欲人妻无码精品av| 一区二区三区无码精久久| 伊人直播黄版APP入口| 日韩欧群交p片内射中文| 高清国产美女在线观看| 国产精品看片在线| 欧美日老太太久久| 老司机带带我精品视频| 中文日无码在线观看| 久久综合成人精品亚洲另类欧美| 久久黄色高清视频。| 婷婷五月深爱五月| 欧美疯狂性受xxxxx另类| 99久久免费只有精品国产在 | 国产乱妇乱子视频在线观看免费| 中美日韩三级毛片免费观看| 亚洲三级视频在线播放| 亚州中文字幕40| 欧美群交一区二区大吊曰大逼| 邻居少妇人妻互换| 果冻国产精品麻豆成人av电影| 久久精品日产第一区高清版| 午夜精品福利91| 久久精品亚洲精品五月色| 亚洲a精品无码毛片色欲av| 又大又粗又爽国产色欲AV| 车子越颠进入的更深h| 成年女人喷潮视频免费观看| 亚洲猛男男同| 丁香婷婷深情五月丁香中文字幕| 岳乳丰满一区二区三区| 韩国三级电影久久久| 精品综合在线99亚洲青草91| 亚洲人成人一区在线观看 | 国产激情在线91| 女人十八毛片免费观| 插我一区二区在线观看| 亚洲成α人V欧美综合天堂| 亚洲精品私拍国产福利88| 国产换脸二区手机影院| 国产特黄色一级| 91桃色国产精品免费在线观看| 欧美日韩中文字幕国产一区| 欧美中文字幕网站免费| 亚洲一区二区一区| A级国产乱理伦片喂奶| 国产污污免费网站| 久久久888精品视频| 久精品视频在线播放网站| 91精品手机国产在线GIF图片| 加勒比在线看毛片| 动漫av观看网站不卡无码| 奶水美人双性h美人多汁| 精品唯美系列最新在线视频| 国产欧美日韩激情视频一区| 18午夜片无码区私人影院| 韩国午夜理论a三级在线观看| 最新欧美一区二区不卡视频 | 亚洲欧美日韩制服综合| 無碼人妻豐滿熟婦精品區| 亚洲日韩av免费在线观看| 丰腴饱满的极品熟妇| 亚洲午夜无码毛片Av久久京东热| 综合亚洲国产日韩欧美在线| 久久午夜福利久久网| 91香蕉视频一区二区在线观看国产b站视频| 又爽又黄又爽又刺激的视频| 欧洲亚洲激情TV中文字幕| 欧美激情aⅴ精品一区二区高清| 伊人蕉影院久亚洲影院| 成人无码视频在线一区| 国产一区二区精品久久小说| 最新欧美极品一区二区三区| 超碰真人在线| 免费观看60秒做受视频| 永久免费毛片久久99| l精品国产亚洲区久久99| 日韩美女A∨性爽一级毛片| 精品国产女主自在线久草| 中文字幕人妻毛片av| 一级免费十八岁无毛毛片视频| 成人欧美视频免费看黄黄| 亚洲男人天堂无码2024| 国产午夜刺激视频一区二区| 国产日本精品一区二区三区| 天堂在线中文最新版地址| 日本一本一道久久香蕉男人的天堂| 韩国三级片在线播放| 色网日本在线观看| 人妻蜜臀av一区二区| 亚洲精品国产成人影片在线观看| 激情影院免费视频试看| 一区欧美激情桃花| 人妻激情综合久久久久| 国产91高潮流白浆在线播放un| 一区三区在线免费视频观看| 男女无遮挡动态图| 97一区二区在线播放| 日韓中文字幕無碼高清毛片| 亚洲一日韩中文字暮AV| 怡红院免费的全部视频国产a| 国产精品剧情一区二区av| 三浦恵理子息与子中文字幕| 色偷偷AV永久无码精品无码| 精品一区二区性爱| 国产精品成人嫩草影院| 国产50部艳色禁片无码国产麻豆精品一区二区三区 | 真实的国产乱ⅹxxx66v| 欧美亚洲少妇高清| av无码免费久久久精品| 中国激情一区二区三区成人| 野花日本韩国视频免费高清观看| 嘿嘿连载下载app| 美女制服で視頻網站| 亚洲tv日韩tv国产tv无码综合| 偷自拍亚洲综合在线| 亚洲 综合 视频 一区| 最近最中文字幕视频| 欧美gαy男男激情1069| 91短视频在线观看污污污| 国产成人久久99| 亚洲国产永久视频免费看| 亚洲青青草原男人的天堂| 久久五月一区二区精品| 国产精品欲AV麻豆网站| 天堂资源中文在线地址bt| 精品一区二区三区播放| 精品人妻少妇aⅴ免费狠狠| 国产成人综合亚洲国产vr| 亚洲日韩精品综合| 国产亚洲乱码无码www| 一级二区在线观看国内精品三级| 成人毛片免费aa级| 中文字幕在线不卡观看视频| 日本中文字幕www| 日本黄色影片在线观看| 久久99成人精一区二区三区| 98bb国产精品视频| 久久亚洲av成人网| 亚洲中文字幕乱码影院在线| 日本三级久久| 99RE8国产这里只有精品| 国产午夜福利精品理论片久久| 加勒比在线看毛片| 久久久久久av无码专区| 音影先锋男人在线资源网| 午夜福利在线免费| 千金去SM体验馆被调教| √天堂亚洲国产传媒在线观看| 丰满爆乳无码专区线一区二区三区 | 男女做爱视频在线观看| 亚洲欧美日韩制服综合| 国产精品 福利 在线| 久久精品欧美| 国产欧美va欧美va在观看| 精品综合久久久久久8888| 中文区中文字幕免费看| 国产毛片久久久久久久久久久久| 亚洲精品无码在线桃色| 精品精品男人的天堂在线 | 男人扒开女人双腿猛进女人| 亚洲国产成人mv在线观看| 男生和女生在一起打牌的很痛的app | 91老师秘片黄在线观看| 国产欧美一区二区日本加勒比| 亚洲欧美自拍唯美另类| 日韩AAAA级无码专区免费| √天堂亚洲国产传媒在线观看 | 国产成人av一区二区三区中文精品| 国产午夜福利精品一区二区久久| 精品亚洲成av人在线免播网站| 国产毛片久久久久久久久久久久| 瑜伽裤透明全毛露丁字裤| 激情精品视频在线观看| 午夜精品一区二区三区成人| 国产高清视频在线播放一区二区三区 | 91精品网站天堂系列在线播放| 电影天堂免费在线观看| 欧美日韩最新精品一二区热热| 国产一边做一边爱视频| 亚洲欧美日韩国产一区在线| 韩国成人AV网站在线观看| 久久久噜噜噜久久中文字幕色伊伊| 欧洲亚洲国产综合精品| 美女乳头阴道搞鸡巴视频| 在线亚洲資源免費看| 在线观看免费人成视频色9| 亚洲特级毛片无码免费观看| 亚洲最新av无码中文字幕一区| 91视频欧美青青草| 毛片一区在线播放| 最新午夜男女福利片视频| 色婷婷精品国产黑人一区二区三区 | 影音先锋+高潮+痉挛| 国产片精品mv在线观看| 亚洲AV综合色区无码区| 亚洲第一aⅴ天堂在线观看| 久久婷婷色中文字幕免费高清| 99久久国产热无码精品免费久久精品A亚洲国产V高清不卡 | 电影《色戒》未删减版| 国产精品青草婷婷| 亞洲國產歐美在線觀看| 日韩AV无码一区二区三区不卡开心久久婷婷综合中文字幕 | 亚洲Av秘无码一区二区| 粉色视频免费观看下载| 午夜精品人成在线观看| 日韩在线视频中文一区二区视频综合| 日本一区二区三区在线视频观看免费| 99尹人香蕉国产免费天天拍| 国产精品视频免费看人鲁| 欧洲亚洲激情TV中文字幕| 欧美一级aa大片免费看视频| 久久亚洲乱码一区| 国产曰韩ai一区二区三区| 久久99国产精品二区不卡 | old老太videos老妇中国| 免費在線一級片| 蜜桃臀一区二区三区四区| 27报视频十八禁| 亚洲三级无码经典三级| 免费在线观看一区二区| 撕掉英语老师的黑色蕾丝内衣| 激情在线视频| 老赵揉着粉嫩的双乳太舒服了秀婷| 免费无码在线aⅴ| 91情侣在线精品国产| 亚洲国产欧美日本韩中文字幕在线 | 欧美成人专区| 免费国产成人无码学生妹| 久热国产精品视频一区二区| 欧美一级婬片A片无码专区野结衣| 久久精品国产亚洲Vā香蕉| 亚洲国产激情小说视频| 草莓视频免费在线看| 向井蓝中文字幕一区二区三区 | 国产好大好爽久久久久久久| 国产中文亚洲熟女曰韩| 大香伊蕉最新视频国产| 国产精品丝袜亚洲熟女蜜月| 日韓中文字幕無碼高清毛片| 亚洲s码欧洲m码一二三区| 日韩视频 中文字幕在线看| 欧美视频在线观看精品一级| 色夜av网午夜福利片| aⅴ色综合久久天堂av色综合| 久久天天躁狠狠躁夜夜2020!观看视频 | 日韩成人在线视频观看苍井空| 午夜精品福利91| 国产成人综合影视| 欧美成人国产精品一区二区| 91精品国产福利资源在线观看麻豆| 国产精品厕所偷窥盗摄av| 日韩高清一区二区第50页| 十大禁止安装app软件入口免费| 嘿嘿连载下载app| 人妻少妇精品久久人妻| 久精品视频在线播放网站| 亚洲欧美日韩精品久久久一区二区| 亚洲成人一区久久| 超级极品白嫩美女在线| 人妻久久系列精品| 国产日韩精品在线一区二区三区| 草莓视频免费在线看| 夜很鲁夜很鲁综合视频欧美| 免费av中文字幕| 国产乱子伦午夜精品视频| 國產午夜人做人免費視頻中文| 美女动态三级在线| 歐美性一交激情視頻在線| 麻豆国产一区二区在线观看| 国产黄A片免费网站免费| 制服丝袜自拍偷拍av一区| 国产精品久久久久久成人热AV| 国产成人精品在线不卡| 亚洲国产精品 制服丝袜| 亚洲欧美一区电影| 国产又长又粗达到性高潮的视频| 欧美亚洲色综久久精品国产91| 884aa四虎影成人精品| 无遮挡18禁国产精品| 狠狠噜天天噜日日噜视频跳一跳| 夜夜欢av一区二区三区| 五月色丁香国产精品白拍| 综合亚洲伊人午夜网| 久久午夜片电影鲁丝午夜精品 | 国产日韩欧美精品区性色| 国产福利 在线播放| 日本一区二区三区作爱视频| 久久五月天影院| 国产一级a毛一级a看免费视频国产suv精品一区二区6 | 国产一级毛片一区二区无码| 亞洲A∨精品一區二區三區下載 | 国产18成人三级在线观看| 国产强上视频在线观看| jizz成熟丰满老女人| 国产成人精品在线不卡| 国产三级在线视频播放线| 欧美性色aⅴ视频一区日韩精品| av日韩在线观看一区二区三区| 俺也去精品视频在线观看| 国产成人麻豆免费观看| 96久久自偷自偷国产精品| 六十老妇性大啊使劲| 午夜精品一区二区三区国产色欲| 国产一级精品精品精品| 欧美中文日韩综合在线视频| 网友分享国产亚洲精品福利片心得| 丝袜美足国产一区在线| 国产欧美亚洲精选视频| 国产一级婬片免费播放电影| 欧美猛少妇色xxxx久久久久| 亚洲欧美中文李幕高清在线| 欧美午夜福利视频| 一本色道久久88加勒比—综| 亞洲A∨精品一區二區三區下載| 免费国产一区二区久久| 精性国产在线视频| 日韩免费福利一区八区| 中国幻女free性zozo交体内谢| 午间影院又黄又粗又大| 亚洲一级午夜福利| 春色 都市 亚洲 小说区| 超碰97人人模人人爽人喝| 最新全集网电影免费在线看| 91成人午夜福利在线观看国产| 相泽南作品在线观看| 99奇米a影色777四色在线观看| 啊灬啊别停灬用力啊黑人| 欧美一级视频高清片| 欧美三级直播美女视频在线观看| 国产在线播放线视频免费| 一区二区毛片视频免费看| 日本一本高清在线观看视频亚洲一区二区三区 | 国产精品素人亚洲国产| 久久精品αⅴ无码中文字字幕不卡 | 99国内精品久久久久久| qvod经典视频在线播放| 国产αV无码日韩αV无码网站 | 国产精品人妻无码久久久免费看| 榴莲APP下载汅网站进入官网 | 久久精品欧美| 一本久久a久久精品∨r综合| 国产精品色片免费| 无码AV中文字幕| 国产精品久久久久浪潮av| 久久婷婷色中文字幕免费高清| 久久久综合精品一区二区三区无码| 日本久久久久精品免费| 国产激情在线91| 日日澡夜夜澡人人| 成人限制第一页| 亞洲一區二區三區免費觀看| 亚洲欧美日韩中文高清| 亚洲人成aⅴ在线播放橙子| 黄色美女免费| 无人视频免费观看免费视频| 亚洲AV日韩在线一区二区三区| 成人网免费视频色呦呦| 性欧美一区二区三区在线观看| 中文字幕一区二区三区免费大片| 久久五月一区二区精品| 日韩中文字幕欧美亚洲第一区| 老师好日逼视频| 国产精品九九久久九九国产| 亚洲日韩精品综合 | 189国产亚洲精品视频第1页| 午夜男女后插入在线免费| 亚洲卡2卡三卡4卡2021老狼| 一级做性色α爱片久久毛片色| 国产毛片的高清视频| 女人18毛片18A级水真多| 99久久久国产免费观看精品| 午夜综合影院欧美聚众性派| 国产另类欧美自拍日韩综合| 相泽南作品在线观看| 亚洲 自拍 露出 极品| 亚洲一级皇色大片蜜汁满满| 老外的大狼色在线| 国产成人综合影视| 亚洲三级毛片在那看| 欧美成人在线视频在线| 麻豆国产一区二区在线观看| 韩日中文无码在线视屏| 性欧美一区二区三区在线观看| 女人被男人躁的爽免费视频| 久久99国产精品二区不卡| 福利姬白浆AV导航| 在线播放亚洲黄片| 影音先锋+高潮+痉挛| 日韩免费无码人妻波多野| 亚洲综合男人的天堂色婷婷| 中文又粗又大又硬毛| 高清无码免费不卡视频| 国产av自拍播放| 日韩欧美精品一区在线观看| 色婷婷国产精品欧美毛片| 色欲?ⅴ精品一区二区三区四区| 二区三区精品| 日韩一区二区三区四区在线播放| 国产精品色片免费| 天堂a亚洲国产色久在线| 免费无码AV片在线观看sm| 日韩美女A∨性爽一级毛片| 久久精品久久观看| 日韩乱女乱妇熟女熟妇av| 免费久久黄色毛片| 手机在线日本视频| 亚洲三级毛片一区二区| 免费+午夜+亚洲| 国产 无码 免费| 午间影院又黄又粗又大| 添添躁狠狠躁| 做爰高潮a片视频35分钟 | 成在线人免费视频一区二区| 日产精品一二三区| 制服丝袜物喷水亚洲综合精品 | 久久大屁股白浆一区二区| 黄色电影免费在线| 奇米一区二区三区四区久久 | 夫の目の前侵犯新婚人妻| 好了AV第四综合无码久久| 一级黄片免费1999| 91果冻精品国产自产自产在 | 亚洲精品狼友在线播放| 欧美亚洲不卡av免费一二三区| 亚洲黄色AV电影在线不卡| 双腿被绑成M型调教PⅠAY照片| 在线不卡一区二区三区免费| 国产精品一区二区久久国产抖音| 国产天天精品视频| 18禁美女裸体无遮挡的网站| 婷婷成人久久精品国产| 久久五月天影院| 亚洲午夜精品第一区二区| 久久影院午夜未满十八勿入 | 国产日韩欧美精品区性色| 被cao哭高H调教1v1H| 日本久久一区二区免费| 377p欧洲日本亚洲大胆噜噜| 亚洲视频一区二区三区久久| 亚洲欧美日韩综合第一| 啊灬啊别停灬用力啊黑人| 日韩国产欧美日韩一区二区久久| 最近免费MV在线观看| 国产91九色在线| 久久精品日产第一区高清版| 澳门l永久无码视频| 拔萝卜免费观看高清视频下载| 日韩制服丝袜片中文字幕| 欧美日韩精品区久久久| 波多吉野一区二区三区av| 久久99视频丝袜爱| 亚洲特级毛片无码免费观看| 欧美性爱福利视频| 加勒比在线视频频図鑑| 亚洲午夜精品第一区二区| 欧美精品日韩精品在线| 日本二区在线中文字幕好看到停不下来! | 亚洲欧美变态| 在线观看精品一区二区三区| 美国日本韩国精品在线| 国产精品一区二区精品片子| 国产精品99久久久久久宅男小说| 91天堂一区二区三区在线| 无遮挡美女18禁免费啪啪| 日韩免费AV无线在码| 天堂av在线观看免费| 欧美亚洲不卡av免费一二三区| 99精品國產高清一區二區三區香蕉| 黄色一级视频| 国产免看一级a一片成人AⅤ| 蜜臀aⅴ永久无码一区二区| 在线观看免费的AV网址| 国产成人精品在线不卡| 国产精品成人嫩草影院| 手机看片精品国产福利| 国产美女性爱亚洲性爱在线观看 | 久久免费视频8| 69式真人无码视频免费 | 亚洲色资源先锋在线观看| 丝袜在线视频网站| 校花高潮抽搐冒白浆| 久久精品久久精品中文字幕| 国产精品美女白丝自慰| 在线国产网站中文字幕av| 99国产精品视频一区二区69堂| 欧美疯狂性受xxxxx另类| 国产曰韩ai一区二区三区| 精品香蕉在线观看国产首页| 亚洲一日韩中文字暮AV| 女人19水真多免费毛片| 亚洲VS欧洲999在线观看视频| 韩国电影密爱在线观看| 中文字幕大屁股熟女乱| 春色 都市 亚洲 小说区| 欧日一道本dvd在线无码| 国产欧美精品一区二区粉嫩| 网址你懂得国产精品| 国产黄色在线网站| 在线观看免费的AV网址| 久久99国产精品二区不卡| 免费啪视频在线观看视频日本| 在线观看日韩www视频免费| 日韩精品手机在线| 国产成人精品一二三区| 国产或人精品日本亚洲77美色| 高清国产在线日韩欧美| 亚洲av美女在线播放啊| 水蜜桃视频污在线观看| 精品亚洲国产aⅴ在线| 图片区电影区激情区小说区| 美女乳头阴道搞鸡巴视频| 欧美在线天堂视频不卡| 欧美激情在线播放一区二区| 狠狠躁狠狠躁东京热无码| 国产一级婬A片AAA毛片| 国产午夜视频免费观看| 香蕉视频久久免费直播| 国产1区2区精品自拍| 国产精品无码久久AV嫩| 国产高清av大屁股免费看| 91成人精品亚洲高清在线观看 | 国产成人午夜一级电影在线 | 日韩欧美人妻之中文字幕| 日本AⅤ精品中文字幕在线| 午夜色a大片在线观看免费| 伊人直播黄版APP入口| 在车里被弄了4次高潮| 性欧美VIDEOFREE高清大喷水| 天堂网2021天堂手机版| 亚洲v欧美v国产ⅴ在线成| 国产露脸无码a区久久蘑菇| 久久人人97超碰人人爱百度| 97视频人人做人人爱免费体验| 日韩高清一区二区第50页| 亚洲一区二区精品久久av女优| 双性调教结婚每日淫训| 亚洲欧美日韩综合第一| 高清少妇欧美中文| 中文字幕电影一区在线观看| 亚i洲成色在线综合网站| 桃子视频APP在线下载污| 国产韩国日本高清视频| 欧美性受XXXX黑人猛交视频| 亚洲国产欧美日本韩中文字幕在线| 網友分享免费福利资源站在线视频心得| 欧美a级片在线观免费观看| 波多野结衣加勒比| 奖励网站正能量www正能量| 国产成人剧情?v麻豆映画| 无码日韩做暖暖大全免费| 国产高清av大屁股免费看| 欧美日韩国产三级久久| 好了AV第四综合无码久久| ▓草莓视频在线观看▓| 国产黄色精品www| 欧美成人在线视频在线| 欧美综合自拍亚洲久久| 99精品欧美一区二区蜜桃美图| 国产区成人在线观看| 欧美无砖专区日本免费观看| 午夜国产精品福利影院| 欧美婷婷综合| 亚洲欧美国产日日| l精品国产亚洲区久久99| 天堂资源中文在线地址bt| 无码人妻不卡久久一区二区| 夜鲁夜鲁夜鲁高清免费看| 欧美一级在线高清免费观看| 日韩精品熟女AA久久毛片| 国产一国产精品免费播放| 在线国产网站中文字幕av| 亚洲一区日韩动漫| 久久综合成人精品亚洲另类欧美| 亚洲va欧美va国产va天堂影| jizz狼友国产高清交流a| 欧美日韩一区二区三区一| 色秀视频在线WWW色| 男人J桶进男人屁股过程| 欧美日韩精品第一区二区| 一区二区三区欧美午夜免费| 韩国三级中文字幕HD久久精品 | 精品久久久久久无码人妻外国| 国产午夜刺激视频一区二区| 午夜网站黄色在线观看免费完整高清观看| 日本高清中文无卡| 办公室a片在线观看| 五月丁香色婷婷蜜桃| 国产精品剧情一区二区av| 亚洲美女在线免费视频| 亚洲?v无码国产精品色午夜| 人成午夜日本乱码伦视频亚洲 | 国产午夜视频免费观看| 亚洲麻豆精品久久久| 免费AV无码不卡在线网站| 欧洲黑白配一二三四区| 国产一久久久久久久久| 国产私人尤物无码不卡| 国产在线拍偷自揄拍无码成人| 视频福利一区二区三区| 粉色视频免费观看下载| 国产盗摄精品一区二区酒店等 | 18午夜片无码区私人影院| 亚洲精品手机在线视频| 福利姬白浆AV导航| 亞洲A∨精品一區二區三區下載| 一级黄片免费1999| 夜很鲁夜很鲁综合视频欧美| 中文精品影视日本| 无码日韩中文专区视频| 美女美女一区二区三区| 草莓视频免费在线看| 久久大屁股白浆一区二区| 日韩欧美精品亚洲一区二区| 欧洲亚洲日本大胆色噜噜| 16处破外女出血视频在线观看| 双腿被绑成M型调教PⅠAY照片| 无码观看在线一区| 色偷偷AV永久无码精品无码| 麻豆视频传媒APP| 91麻豆一区二区在线观看| 成人免费a级毛片无码片在线播放| 久久久久久久久久久国产| 一区二区三区在线观看欧美| 1区3区4区产品乱入视频| 女佣的味道hd中字在线观看| 双乳被快递员揉搓玩弄在线播放| 国产乱婬AV麻豆剧传媒牛牛影视| 高潮时奶水喷出来了| 又爽又黄又爽又刺激的视频 | 图片区小说区另类春色蜜芽| 国产亚洲欧美ai在线看片| 日韩在线视频中文一区二区视频综合 | 伊人影院在线播放| 99RE6国产精品99RE在线| 亚洲欧美日韩综合第一| 国产激情在线91| 人妻精品久久一区二区| 成人网免费视频色呦呦| xxxx欧美丰满大屁股| 成年人视频久久免费| 特级一级毛片视频免费观看| 99精品视频免费在线观看| 久久久一二三区精品| 瑜伽裤透明全毛露丁字裤| 蜜臀久久精品国产亚洲av| 欧美视频第2页在线视频| 中文无码一区99xav| 日韩视频 中文字幕在线看| 在线观看精品成人综合视频| 中文av旡码高清在线| 国产白丝喷水娇喘视频| 国产日韩欧美中文一区| 夫の目の前侵犯新婚人妻| 亞洲一區二區三區免費觀看| 日韩国产精品等最新内容!| 1024大香蕉手机看片| 伊人久久综在合线亚洲2019}| 欧美另类性视频| 啊灬啊别停灬用力啊黑人| 日韩精品一区二区亚洲A ∨| 亚洲熟妇无码AV| 午夜福利精品无码福利| ..亚洲欧美日韩成人高清在线一区| 精品亚洲精品在线观看| 中国精品视频在线一区二区 | 久久网无码一级毛片| 亚洲国产自久久婷婷| 最新欧洲日韩在线播放| 精品国产一区二区三区久久狼黑人| 大又大粗又爽又黄少妇毛片视频| 2022v视频无码高清网站| 又爽又黄又爽又刺激的视频| 91精品一二区久久无码电影| 国产精品日产精品久久| va在线看国产免| 国产精品老师好紧好爽最新毛片| 囯产精品99久久一区二区三区| 日韩床上特黄一级片| 亚洲国内精品久久久久电影院| 国产黄色在线网站| 一起嗟嗟嗟免费观看短片| 国产91对白在线播放边| 国产天堂网www在线资源av网| 日产无人区一线二线三线公司| 欧美国产第一区| mmuu55首页 日本系列| 国产露脸无码a区久久蘑菇| 亚洲一区二区三区网站观看| 日韩床上特黄一级片| 青青青免费高清视频在线| 国产黄色三级三级三级| 免费无码a∨片在线观看| 品人妻VA出轨中文字幕| 中文日无码在线观看| 无码中文字幕aⅴ免费费放| 国产精品成人嫩草影院| 日韩欧群交p片内射中文| 亚洲永久免费无码打屁股| 欧美另类癖好手机在线网| tobu8 天堂网www中文在线| 91超级好看一区二区三区| 国产天堂在线一区二区三区| 国产AV三级精品成人网站| 谁有操逼毛片网站| 国内精品久久99人妻无码特黄| 亚洲av久播在线观看| 久久久888精品视频| 惠民福利国产AV无码专区亚洲AV毛片搜 | 草莓视频APP下载官方| 亚洲三级毛片一区二区| 亚洲猛男男同| 久久精品丰满人妻99| 欧美人成网站| 果冻国产精品麻豆成人av电影| 99RE8国产这里只有精品| 在线免费观看国产视频| 三级片欧美在线| 網友分享国产一区精品在线心得| 天堂a亚洲国产色久在线| 久久精品99国产国产精人s| 久久99视频丝袜爱| 玩弄熟睡的小男生腐h| 成人看片黄在线观看| 男生女生一起怼怼的app下载大全| 久久精品国产亚洲av天美18| 欧美狠狠入鲁的视频| 欧美经典复古伦理在线| 人成午夜日本乱码伦视频亚洲 | 精品精品男人的天堂在线| 国产自慰喷水视屏| 污视频网站日本免费| av蓝导航精品导航| 亚洲最新无码av网址| 中文字幕一区二区人妻本田岬| 亚洲天堂久久精品9966| 加勒比在线视频频図鑑| 车里要了好多次天天影院网| 91视频污APP色版下载| 无码人妻热线精品视频| 午夜福利精品视频| 北条麻妃青青久久av| 99视频精品全部免费在线| 国产熟女精品视频国语| 日韩欧美国产手机在线观看| 国产福利午夜九二网免费| 欧美顶级AⅤ高清视频| 日本免费无码高清色倩片| 杨幂喷水高潮在线观看视频| 另类亚洲欧美精品综合| 免费A级毛卡片不收费视频| 欧美gαy男男激情1069| 丁香五月婷婷综合网| 久久婷婷国产免费天天| 亚洲人成日本片| 2020国产成人精品视频网站 | 伊人不卡字幕久久| 一区二区三区四区在线免费观看| 九一视频免费版污| AV免费不卡国产在线观看| 草草影院欧美三级日本| 亚洲v欧美v国产ⅴ在线成| 欧美一级在线高清免费观看| 欧美成人在线视频在线| 国产亚洲精品系列| 亚洲欧州国产综合不卡在线免费视频 | 国产免费福利片在线视频| 国产成人真人片亚洲精品不卡| 欧美一级二级三级网站大全| 榴莲APP下载汅网站进入官网 | 一女享受夫奴口舌伺候 | 亚洲天堂在线观看免费更新| 日韩精品中文字字幕有码专区| 国内一区二区三免费视频| 我的漂亮女房东完整版在线韩剧 | 久久影院午夜未满十八勿入| 中文字幕乱码亚洲v日本| 在线无码无码播放视频| 人妻回春按摩肏到中出| 日韩精品人妻av一区二区三区| 韩国羞羞漫画无遮羞在线看| A级国产乱理伦片喂奶| 亚洲va在线va天堂va国产2020| 在线观看无码三级少妇| 拔萝卜免费观看高清视频下载| 日本大乳高潮视频在线观看亚洲欧美人成人让影院 | 1024在线看片你懂的| 国产毛片的高清视频| 无套挺进少妇私下处内射| 在线喷白浆在线视频| 91极品丝袜美女在线观看| 国产黄色在线网站| 在线不卡一区二区三区免费| 国产成人av大片大片在线播放| 一区二区三区人妻免费视频| 超碰97久久尤物| 中文日无码在线观看| 女人19水真多免费毛片| 亚洲精品狼友在线播放| 麻豆国产精品VA白浆| 青青青精品大杳蕉| 五月天婷五月天综合网 欧美片区 无码A∨高潮抽搐流白浆8MAV | 伊人影院在线播放| 在线观看国产一区二区三区| 国模欢欢销魂全过程| 大香蕉国产综合在线视频| 欧美日韩国产激情另类| 婷婷六月天激情| 看全色黄大色大片免费久黄久| 亚洲中文字幕不卡无码| 国产一级大片免费视频| 欧美一级黄色免费在线观看视频 | 国产内地刺激性精品毛片| 精品免费在线欧美| 调教.求饶乖腿打开h| 草莓视频APP下载官方| 国产午夜刺激视频一区二区| 99热手机在线最新地址| 日韩床上特黄一级片| 国产精品麻豆一区二区三区v视界| 欧美日韩aⅴ人妻| 动漫av观看网站不卡无码| 欧美黑人又粗又大又硬免费视频| 国产精品女同久久久久电影院| 国产成人精品一二三区| 成人久久免费视频| 国产 亚洲 欧美 另类中文| 国产精品美乳| 久久这里有精品视品| 成人中文字幕亚洲乱码| 亚洲欧美变态| 车子越颠进入的更深h| 尹人在线视频| 亚洲精品色无码一二三区| 欧美日本韩国在线视频| 日韩国产欧美一区免费观看| 国产成人欧美综合在线观看| 十大禁止安装app软件入口免费| 羞羞视频在线观看免费视频 | 欧美大尺度禁片露器官电影观看| 999免费观看四虎精品国产| 18勿看免费大片1000拍拍| 免费国产一区二区久久| 狠狠色丁香婷婷综合久久网站| 偷自拍亚洲综合在线| 国产视频精选全网| 欧美精品v日韩精品v| 日日摸夜夜添无码无码a∨| 杨幂喷水高潮在线观看视频| 中文字幕日本a√在线| 一级黄色片免费观看| 91精品国产自产老师啪| 最新全集网电影免费在线看| 久久精品久久观看| 6080精品人妻一区| 国产精品喷水综合久久久| 日韩AAA久久蜜桃AV| 色综合久久综合中文综合网| 老司机在线观看亚洲二区一区| 一区欧美激情桃花| 国产小视频一区二区三区中文字幕在线播放 | 淫荡人妻在线视频| 色综合久久综合中文综合网| 欧美激情aⅴ精品一区二区高清| 在线播放国产视频99| 黄色欧美三级在线看| 欧美成人做爰a片免费看美七烈| 伊人蕉影院久亚洲影院| 小视频播放亚洲欧美| 日本免费AⅤ乱码高清专区| 丰满熟女亚洲图片综合图区| 美女黄又色高清视频免费| 国产亚洲精品A片1000| aⅴ色综合久久天堂av色综合| 一级在线中文观看日韩| 国产亚洲加勒比久久精品| 国产私人尤物无码不卡| 日韩精品国产一区国产二区| 日韩一区二区在线视频| 大香伊蕉最新视频国产| 中国国模无码AV| 双性调教结婚每日淫训| 伊人久久大香线蕉?v男同| 欧美亚洲免费播放一区| 精品亚洲精品在线观看 | 亚洲国产欧美在线播放| 精品动漫中文字幕一区| 扒开老女人p大荫蒂warmth| 日韩精品中文字字幕有码专区| 国产精品v欧美| 国产一国产精品免费播放| 中文字幕久久久久一区| 欧美成人专区| 久久综合网欧美色妞网| 色天堂在线观看视频| 国产激情在线91| 一级aa免费视频毛片| 精品免费在线欧美| 国产极品午夜在线观看| 国产色精品vr一区区三区| 夜夜操天天爽| 毛片女人片毛片免费二区| 欧美亚洲国产中文另类在线观看| 精品国产日韩在线观看| 冯仰妍破处门| 巨粗进入警花哭喊求饶| 益日韩欧群交P片内射中文| 亚洲欧洲国产精品香蕉网| 在线观看亚洲精品视频| 国产午夜视频免费观看| 草草影院欧美三级日本| 538pro精品视频我们不只是| 欧美另类亚洲日韩精品一区二区不卡| 国产91九色在线| 网红久久精品一区二区| 国产影视乱伦三级| 国产三级在线视频播放线| 污视频网站日本免费| 国产成人剧情Av麻豆嘿嘿 | 国产乱码人妻一区二区三区| 91香蕉视频国产免费下载| 欧洲aⅴ无码片一区二区三区 | 中文区中文字幕免费看| 日本三级久久| 免费在线观看精品亚洲| 国产尤物A∨尤物在线观看| 农村少妇野外a片www| 美女我无遮挡被艹网站自慰| 免费成人一级毛片电影| 被男子脱掉内裤的美女视频| 大学生一级毛片全黄真无码| 久久精品2021国产| 亚洲永久精品ww47 91一区| 亚洲欧美日韩岛国色图| 久久156精品视频| 国产91高潮操逼视频流白浆 | 张警官撞玻璃9分10秒| 69国产成人精品午夜在线| 天堂国产在线视频| 国产白领勾搭外卖av| 黄到让你下面湿的视频| 国产精品无码一区二区四区免费| 91短视频在线观看污污污| 阿牛影院在线观看视频| 亚洲精品影院久久久久久| 成人性视频欧美一区二区| 国产一级a毛一级a做免费高清视频| 欧美男女精品一区二区| 国产成人无码精品久久久亚洲精品人成无码中文毛片 | 亚洲日韩精品综合| 亚成人欧美在线观| 婷婷丁香性爱| 污软件在线观看软件| 亚洲人妻精品综合无码专区| ..亚洲欧美日韩成人高清在线一区| 国产精品AV毛片免费看观看| 中文字幕欧美熟妇一区| 欧美日韩中字在线 | 2020日韩中文字幕| 成人高清毛片视频| 大乳爆乳无码一区二区三区| 9色丨porny丨人妻| 黑人巨茎大战俄罗斯白人美女| 天天更新最近中文字幕完整视频在线看! | 亚洲午夜久久免费| 精品国产三级AV在线视色| 91精品国产高清自| 国产三级在线视频播放线| 日韩欧美一区二区三区成人精品| 亚洲日韩av一区久久精品| 女人18一级毛片免费视频| 亚洲精品一级在线播放| 午夜APP在线观看| 最近的2019中文字幕7| 乡村女教师艳妇欲爱| 孕妇动漫精品国产一区二区三区 | 久久久精品产一区二区三区日韩| 国产狼友精品视频网| 日韩av手机在线观看| 国产黄色在线网站| 国产亚洲精品A片1000| 四虎www成人影院观看| 欧美日韩人成国产自产高清| 国产精品中文字幕一区二区三区视频 | 欧美激情四射一区二区在线| 日韩国产欧美日韩一区二区久久| 精品亚洲精品在线观看| 91精品一区国产高清在线GIF | 亚洲日产精品一二三四区| 国产人无码a在线西瓜影音| 国产亚洲日韩网曝欧美11| 韩国午夜理论a三级在线观看| 欧洲亚洲激情TV中文字幕| 日产精品一二三区| 国产污污免费网站| 亚洲日韩制服另类| 日产一级毛片免费| 亚洲 欧洲 日韩 综合AV| 国产精品精品综合在线网址| 欧美日韩高清不卡一区| 欧美一区手机在线观看视频| 国产欧美久久一区| 欧美午夜久久精品另类| 婷婷丁香性爱| 特级做a爰片毛片免费看108| 美女视频黄a视频全免费观看蜜臀 国产精品免费播放器大全 | 欧美一级高清首页蜜桃| 国产成人合集在线播放| 中文成人无码国产亚洲| 国产亚洲国际精品福利| 亚洲欧美日产国产视频| 亚洲色图在线视频| 一级黄色毛片在观看| 国语对白刺激真实精品| 日韩av手机在线观看| 成人性做爰aaa片免费看不忠| 精品国产女主自在线久草| 男人咬奶边做好爽免费视频| 中文字幕一区二区人妻本田岬| 欧美日韩精人妻品一区| 妓女精品一区二区| 亚洲 自拍 色综欧美合图区| 天天看天天噜噜噜在线视频| 日产一级毛片免费| 亚洲中文无码成人网| 叶玉卿被揉到高潮下不了床| 成人欧美视频免费看黄黄| 国产精品中文字幕一区二区三区视频 | 激情男女高潮射精?V免费 | 欧洲精品一二区无码人妻| 2020国产成人精品视频网站| 亚洲日本欧洲综合| 国产成人欧美综合在线观看| 婷婷精品国产?v麻豆不片| 国产精品日本欧美一区三| 国产在线观看h尤| 无码视频一区二区三区六区| 成年无码AV片在线蜜芽| 在线观看91精品国产2021| 久久久久久人妻| 黑人和少妇冒白浆了| 国产在线播放线视频免费| 亚洲成α人V欧美综合天堂| 国产免费经典三级| 一本久久a久久精品∨r综合| 人妻五月天精品婷婷| 国产一级婬片免费播放电影 | 91成人精品亚洲高清在线观看 | 欧美精品青青久久久久久久久久久| 亚洲人成网址在线观看| xxxx黄色网站在线观看| 中国熟妇色欧美老妇多毛| av天堂av亚洲啪啪久久无码| 日韩AAA久久蜜桃AV| 国产成人麻豆免费观看| 成人av免费网址在线观看| 妇搡BBBB精品一区二区| 97久久一精品人妻人人玩| 98bb国产精品视频| 中文字幕无码138页| 韩国成人AV网站在线观看| 菠萝菠萝蜜免费影视在线观看| 国产精品丝袜亚洲熟女蜜月 | 国产日潮亚洲精彩视频| 国产亚洲精品A片1000| 欧美在线三级艳情网站亚洲成人99| 久久国产福利一区二区三区| 爱福利秒拍国产导航小视频| 亚洲精品视频中的话| 国产激情福利| 日韩在线精品一二三区| 欧美日韩最新精品一二区热热| 欧美狠狠入鲁的视频| 中文字幕一区日韩无码| 在线观看不卡一区二区三区| 日本国产在线播放一区二区不卡| 中文字幕永久有效丝袜| 国产精品色哟哟免费看麻豆| 欧美极品jizzhd欧美仙踪林| 欧美激情在线播放一区二区| 久久无码āV中文出轨人妻| 精品综合国产亚洲欧美久久| 亚洲精品国产成人影片在线观看| 伊人影院在线播放| 国产精品国产三级国产午| 亚洲高清国产拍精品青青草原 | 国产成人精品亚洲二区| 免费国产福利一区二区| 亚洲s码欧洲m码一二三区| 夜夜高潮夜夜爽精品视频| 欧美XXXXX高潮抽搐免费播放观看等| 成人精品aaa亚洲丝袜在线观看| 亚洲精品视频一区二区| 无码熟妇一区二区| 一区二区三区在线观看欧美| 国自产拍在线亚洲网站| 尹人在线视频| 精品卡通动漫在线观看视频一区| 亚洲aⅤ无码国产片| av午夜福利一片看久久| 日日噜噜噜夜夜爽狠狠视频| 日产精品一二三区| 日韓中文字幕無碼高清毛片| 亚洲男人天堂无码2024| 图片区电影区激情区小说区| 免费精品无码成人片在线观看| 18勿看免费大片1000拍拍 | 又黄又爽又硬网站| 日本加勒比麻豆亚洲精品| 日韩国产精品等最新内容!| 久久久久国产精品嫩草影院| 亚洲欧美日韩制服综合| 国产免费女明星色视频| 欧美在线三级艳情网站亚洲成人99| 日本国产在线播放一区二区不卡| 神马免费视频在线观看| 99奇米a影色777四色在线观看| 国产亚洲精品系列| 99在线免费观看黄片| 奶茶视频APP黄在线播放| 日本免费AⅤ乱码高清专区| 国产99视频免费精品| 国产又粗又长又爽黄又硬视频 | 国产真实迷奷系列在线看| 97久久久人妻一区精品| 欧美极品jizzhd欧美仙踪林| 国产麻豆精品成人毛片| 一级无码国产片手机版| 久久久噜噜噜久久中文字幕色伊伊 | 精品吹潮在线播放日韩| 又脱又摸下面激烈免费视频| 94人妻喷水视频在线| 中文字幕日韩亚洲视频在线| 日韩国产欧美一区免费观看| 久久婷宗和五月天网拍| 91香蕉依人综合久久| 伊人久久综在合线亚洲2019}| 亚洲成AV人手机在线观看网站 | 色影音先锋色资源网站| 欧美日本不卡一二三区| 亚洲天堂在线观看免费更新| 99热国产这里只有精品99 | 欧美日韩一二区在线观看| √天堂亚洲国产传媒在线观看| 免费无码在线aⅴ| 日本加勒比麻豆亚洲精品 | 国产一级无码| 亚洲一区二区三区日韩国产| AV东京热影音先锋| 国产精品主播视频欧美日韩| 亞洲歐美日韓中文字幕首頁| 日韩精品中文字字幕有码专区 | 欧美.久久久.精品| 国产午夜福利影音| 99爱免费视频在线观看禁| 欧美成人做爰a片免费看美七烈 | 手机成人免费视频| 日韩免费AV无线在码| 免费观看60秒做受视频| 女性喷液过程高清免费视频| 亚洲 欧洲 日产 专区| 精品香蕉在线观看国产首页| 欧美一级在线高清免费观看| 中文字幕欧美精品日韩在线| 婷婷五月深爱五月| 高清免费人成在线视频观看| 免费观看60秒做受视频| 天堂国产在线视频| 国产亚洲日韩网曝欧美11| 久久影院午夜未满十八勿入| 国产免费女明星色视频| 日本一本色道高清| 91老师秘片黄在线观看| 成人欧美一区二区三区在线观看| 高清国产在线观看| 色综合精品视频在线| 亚洲一区二区三区日本九九日韩| 欧美亚洲国产中文另类在线观看| 亚洲?V伊人久久综合密臀性色| 中文字幕免费日韩中文中文| 日韩毛片午夜在线观看| 日韩毛片午夜在线观看| 欧美jizz18性欧美色天堂综合在线| 午夜福利精品视频| 一区二区毛片视频免费看| 激情影院免费视频试看| 一区二区毛片视频免费看 | 婷婷五月深爱五月| 精品综合国产亚洲欧美久久| 精品综合国产亚洲欧美久久| 伊人久久香综合蕉五月天| 超碰成人免费观看在线| 在线观看精品一区二区三区| 惠民福利久久精品国产亚洲7777 | av蓝导航精品导航| 宋雨琦ai人工智能造梦| 亚洲日韩av免费在线观看| 国产午夜福利在线播放87| 欧美一级视频高清片| 中文字幕一区日韩无码| 久久五月天影院| 亚洲欧美日产国产视频| 贵州少妇一级毛片| 亚洲欧洲在线观看无码| 日韩欧美国产三级一区| 亚洲欧美另类久久| 宝可梦沙奈朵口吐白色液体| 欧美a级片在线观免费观看| 狼群影院中文字幕| 亚洲 中文 欧美 日韩 在线人| 久久亚洲免费伦理| 办公室a片在线观看 | 天天操天天曰| 色小说色网视频| 做爰高潮a片视频35分钟 | 免费嗨片直播网中文字幕| 思思热这里只有精品5| 国产成人69天堂| ddd54手机免费看| 国产影视乱伦三级| 国产黄色一级片在线观看无码高清 | 国产偷窥熟女精品| 亚洲国产激情一区在线| 波多吉野一区二区三区av| 91精品国产高潮久久久久| 精品一区二区久久久久久久网站| 国语对白久久精品视频| 亚洲AV综合A国产AV中文| 精品日韩久久一区| 一级做a爰片久久毛片潮喷无码| 亚洲视频在线观看免费一区| 不卡av在线播放| 久久er热这里只有国产中文精品| 精品亚洲精品在线观看| 色噜噜中文网在线| 100款禁用黄台网站小黄鸭| 日韩欧美一卡二区| 亚洲最新无码av网址| 东热亚洲狂野欧美| 亚洲日韩av一区久久精品| 97一区二区在线播放| 澳门l永久无码视频| 女人的天堂毛片AV在线| 又黄又爽又硬网站| 久久99国产精品二区不卡| 亞洲A∨精品一區二區三區下載 | 隔壁放荡的人妻在线看中文| 973午夜伦伦电影论片| 91成人精品亚洲高清在线观看| 亚洲欧美一区二区三区69| 青草久久在线免费观看视频| 91精品国产高潮久久久久| 97视频人人做人人爱免费体验 | 乱人伦AV麻豆网| 亚洲色图在线视频| 国产尤物A∨尤物在线观看| 正在精品视频第一页| 在线亚洲欧美日韩国产| 超碰成人在线91| 91桃色污污污污污污污污污| 日本又色又爽又黄的网站免费| 成年午夜免费aⅴ在线观看| 奇米777四色欧美精品| 成人免费毛片日韩毛片| 国产亚洲乱码无码www| 亚洲素人无码三级| 99精品亚洲国产精品| 91在线无码精品秘比基尼| 亚洲男人天堂无码2024| 日韩欧美一区二区三区成人精品| 91成人午夜精品福利院| 国产亚洲综合秋霞影院国产| 青草影院内射中出高潮| 日韩av手机在线观看| 亚洲av成人精品日韩在线播放| 亚洲色欲或高潮影院伊人| 国产成人AⅤ免费观看| 天美麻花果冻女演员表| 野花社区最新免费视频| 秋霞在线手机国产在线| 日韓福利一區| 亚洲人妻久久无码| 成人无码av一区二区三区| 性感日韩在线视频观看| 免费av中文字幕| 亚洲AV乱码一区二区三区按摩..| 步兵精品手机在线观看| 丁香亚洲综合五月天婷婷| 在线观看自拍无码综合| 无码专区 免费在线| 欧美亚洲免费播放一区| 67194在线观看熟妇 | 天堂资源中文在线地址bt| 双性调教结婚每日淫训| 免费真人一对一视频| 夜夜操综合网| 亚洲va欧美a国产va综合| 亚洲一区二区三区网站观看| 惠民福利久久精品国产亚洲7777| 欧美黄片十分钟不卡一区| 最近中文字幕mv免费高清视频动| av高清理伦片在线观看| 国产亚洲桃色| 丰满多毛xXXⅩ精品视频| 久久电影午夜鲁丝片无码| 色就色综合偷拍区欧美| 日本www久久久久久久久| 国产制服在线视频| 九九热最新国产视频| 亚洲综合精品二三区| 中文字幕无码138页| 在线观看免费的AV网址| 日韩激情一级毛片| 欧美另类亚洲日韩精品一区二区不卡| 国产极品午夜在线观看| 91老师秘片黄在线观看| 一本久草综合| 久久精品人妻中文系列| 亚洲国产中文字幕在线视频| 越南女子杂交内射BBWBBW| 妇搡BBBB精品一区二区| 日产精品一二三四区国产亚洲| 免费萌白酱国产一区二区三区| 美女我无遮挡被艹网站自慰| 黑人巨大亚洲综合在线| 欧美激情在线播放一区二区| 日韩在线欧美在线一区二区三区| 五月丁香婷婷成人网| 免费精品美女久久久久久久久久| AV乱码一区二区三区| 精品成在人线AV免费| 人妻少妇蜜桃一区二区| 国语对白刺激真实精品| 春色 都市 亚洲 小说区| 免费精品无码成人片在线观看| 91久久精品日本一区| 一区二区三区吞精| 日韩欧美国产不卡一区二区| 中文字幕亚洲无码色网视频| 亚洲成α人V欧美综合天堂| 97视频人人做人人爱免费体验| 囯产精品99久久一区二区三区| 草莓视频APP下载官方| 日本黄线在线视频免费看 | 亚洲性爱A不卡| 欧美.久久久.精品| 亚洲欧美一区二区三区69| 一区二区三区四区在线免费观看 | 国产精品久久秘 A级| 日韩精品老熟女视频网站免费观看| yy111111少妇影院无码光屁股| 在线观看免费人成视频色9| 亚洲a精品无码毛片色欲av| 99视频日韩三级电影| 亚州中文字幕40| 超碰在线99免费在线不卡| 思思热视频精品在线观看| 中文字幕久久精品有码综合网| 久久精品99国产国产精人s| 亚洲av午夜福利无码精品一区| 国产精品日产精品久久| 欧美阿v高清资源在线| 无码专区 免费在线| 100款禁用黄台网站小黄鸭| 亚洲素人无码三级| 精品人妻挤奶一二三四区| 狠狠综合久久一区二区三区 | 调教.求饶乖腿打开h| 字幕大全网址撩人精品磁力视频二区| 日韩精品成人蜜桃| 欧美日韩一二区在线观看| 久久99视频丝袜爱| 青娱乐精品视频在线免费观看| 少妇一区二区三区精品| 越猛烈欧美xx00动态图带声音| 欧美一级高清费一级a| 亚洲无码免费看在线视频| 国产自慰喷水视屏| 国产午夜福利精品一区二区久久| 茄子短视频app在线观看| 中文字幕有码无码人妻?V蜜桃| 亚洲国产精品成人一区二区小说| 在线观看无码精品秘?日本| ass日本丰满熟妇pics| 国产成人久久99| 日本黄色影片在线观看| 日本丰满护士bbw| 亚洲av午夜成人片精品电影| 好姑娘10影视剧在线观看| 国产亚洲欧美ai在线看片| 免费看美女无遮掩的软件| 好紧好湿好爽免费视频美女做| 久久艹这里只有精品| 十八禁爽爽爽无遮挡在线观看网站| 老司机无码精品A| 国产日韩精品在线一区二区三区| 人妻仑乱少妇a级毛片| 在线三级网址| 最新国产乱伦| 一级做a爰片久久毛片潮喷无码| 免费观看丰满少妇一级毛片| 国产成人合集在线播放| 国内9l视频自拍老熟女九色| 校花高潮抽搐冒白浆| 国产一线在线观看| 少妇大胆瓣开下部自慰| 日韩三级黄片免费观看| 亚洲中出中文字幕日本| 中文字幕有码不卡| 亚洲国产在线精品国自产拍影院| 老外的大狼色在线| 午夜宅男视频| 香蕉久久AB一区二区三区| 成人性视频欧美一区二区| 久久毛片免费一区二区三区电影| 欧美一级人成视频| 亚洲人成人一区在线观看| 欧洲亚洲国产综合精品| 国产免费经典三级| 欧美激情aⅴ精品一区二区高清| 一级黄色毛片在观看| 久久156精品视频| 成人中文字幕亚洲乱码| 中文字幕AV二区| 中文字幕不卡乱偷在线| 日韩一区二区三区四区在线播放| 日韩精品 欧美 制服丝袜| 欧美a级片在线观免费观看| 欧美一级欧美一级在线观看| 久久国产精品一国产精| 大学生一级毛片全黄真无码| 2020国产成人精品视频网站| 国产一二三区 韩国女主播| 国产精品日本欧美一区三| 肉色丝袜超薄一区二区三区| 亚洲国产的精品太乱码一区二区| 日本国产在线播放一区二区不卡| 国产ā v中文字幕乱码| 日韩产品和欧美产品的区别| 日本加勒比麻豆亚洲精品| 色噜噜中文网在线| 高清国产美女在线观看| 国产精品麻豆综合在线| 中文字幕不卡乱偷在线| 国产毛片的高清视频| 丰满熟女亚洲图片综合图区| 波多野结衣电影一区二区| 日韩精品一区二区在线观看视频| 久久精品国产亚洲aⅤ麻豆图片| 人妻中文字幕专区| 在线观看免费的AV网址| 欧美性生活视屏精品| 国产成人精品毛片AV在线| 美女欧美一区二区| 亚洲精品欧美综合久久| 国产网友自拍视频| 国产激情在线91| 久久爽av鲁丝无码中文| 成人免费毛片日韩毛片| 人妻夜夜爽天天爽4区| 91国自产拍在线天天更新| 国产精品国产亚精品不卡| 成人无码视频在线一区| 美女裸体视频91免费国产| 国产一级a毛一级a看免费视频国产suv精品一区二区6 | 欧美疯狂性受xxxxx另类| 91探花偷偷拔套在线播放| 国产性爱第8页在线观看| 亚洲精品国产成人影片在线观看| 18禁裸乳無遮擋啪啪無碼免費| 四虎sihu新版影院亞洲精品| 亚洲美女在线免费视频| 少妇太爽了在线观看视频| 9191精品国产免费久久国语| 无码av高潮抽搐流白浆在线 | 久久久久久av无码专区| 欧美一区二区三区18禁| 欧美一区二区在线播放免费播放| 私人影院午夜在线观看| 亚洲成年网站| 日韩欧美综合在线二区三区| 午夜激情无码| 国产内地刺激性精品毛片| 成人做爰视频www爽爽爽文章| 中文字幕亚州欧美专区| 少妇挑战黑人4p惨叫| 久久久最近免费字幕中文大全| 国产欧美VA天堂在线观看视频下载| 國產精品三級在線觀看| 欧美一区手机在线观看视频| 亚洲精品美女网站久久m| 69精品久久日日躁夜夜躁| 秋霞影院韩国伦片在线播放| 手机看片精品国产福利| 成熟少妇av免费网站| 丁香五月婷婷综合网| 一个人免费视频在线观看高清直播| 天美传媒国产精品果冻| av午夜福利精品一区| 在线播放日韩国产欧美| 一级黄色欧美性爱| 天天噜夜夜噜狠狠噜| 欧美12一13SEX性视频| 久久综合网欧美色妞网| 日本三级久久| 夜夜欢av一区二区三区| 亚洲卡2卡三卡4卡2021老狼| 在线观看国产一区二区三区| 欧美一区日本二区| 韩国三级片在线播放| 亚洲精品手机在线视频| 欧美中文日韩综合在线视频| 中文字幕久久久久一区| 91在线无码精品秘九色APP| 婷婷五月深爱五月| 最新av网站网址免费观看| 欧美成人xx免费视频| 欧美疯狂性受xxxxx另类| 国产精品中文字幕一区二区三区视频| 越猛烈欧美xx00动态图带声音| 欧美亚洲日本色图片网| 国产日韩欧美一区二区四区 | 国产av最新网址| 日韩在线欧美观看| 欧美视频在线观看精品一级| 七月亚洲天堂av中文在线官网 | 在线播放国产视频99| 1区3区4区产品乱入视频| 污污视频免费网站| 国产聚色窝在线首页| 国产视频精选全网| 成人久久一区精品| 国产成人福利在线视频播放下载| 中文字幕欧美精品日韩在线| 一区影院午夜福利擁有海量視資源久 | 国产精品视频色拍拍2021| 97理论三级九七午夜在线观看| 四虎永久在线免费视频一二区| 成人免费a级毛片无码片在线播放| 亚洲色图在线视频| 中文字幕一区二区高清精品久久久| 91精品一区国产高清在线GIF| 在线观看xxxx国产| 婷婷综合六月| 亚洲欧美精品免费观看| av无码av高潮av喷吹免费| 国产成人69天堂| 尊龙凯时·(中国区)人生就是搏!| 亚洲成α人V欧美综合天堂| 在线观看国产一区二区三区| 日本久久高清一区二区三区| 中文字幕乱码亚洲影视亚洲日本va午夜 | 亚洲精品视频一区二区| 果冻国产精品麻豆成人av电影| 日韩av在线在线观看| 睡错闺蜜男朋友(高h)| 拔萝卜又疼又叫视频下载安装| 国产经典无码在线免费看| 前后夹击征服骚女完美爆| 老师解开乳罩喂奶我脱她内| 一区二区三区午夜片| 榴莲APP下载汅网站进入官网 | 特级毛片A级毛片免费观看| 狼友久久国产精品| 欧美日韩精选在线观看| 日韩无码高清wwww| 国产亚洲欧美日韩网站| 国产偷窥成熟女精品视频| 亚洲精品一级在线播放| 麻豆视频传媒APP | 497799欧洲版的国产suv| 中文字幕乱码亚洲影视亚洲日本va午夜| 国产人与禽ZoZ0性伦69| 国产香蕉精品视频| 国产白浆在线视频网| 97理论三级九七午夜在线观看| 久久天天躁狠狠躁夜夜2020!观看视频 | 免费播放黄色叫床露脸对白影片| 大地免费资源| 一级少妇精品视频一区二区| 亚洲无遮挡一级精品视频| 2022v视频无码高清网站| 亚洲国产成人mv在线观看| 中文字幕有码无码人妻?V蜜桃| 亚洲中文字幕一区二区三区在线91| 国产亚洲国际精品福利| 少妇太爽了在线观看视频| 亚洲影视AV一二三| 999福利精品久久久| 亚洲国产香蕉视频欧美明星换脸| 又大又黄又爽的成人免费视频| 波多野结衣加勒比| 成熟少妇av免费网站| 免费综合日本中文| 草莓视频免费在线看| 日产午夜精品一区二区播放| 一区二区三区无码在线| 最近最中文字幕视频| 午夜亚洲乱码伦小说区| 欧美激情四射一区二区在线| 国产农民工简易窝棚嫖妓精彩对白| 国产欧美日韩丝袜高跟鞋| 亚洲无遮挡一级精品视频| 91桃色污污污污污污污污污| 国产综合内射日韩久| 亚洲专区日韩中文在线 | 综合亚洲伊人午夜网| 欧美性色aⅴ视频一区日韩精品| 亚洲无码aⅴ色图| 亚洲色欲或高潮影院伊人| 91探花偷偷拔套在线播放| 国产av一区二区三区香焦| 久精品视频在线播放网站| 亚洲AAA一级无费看| 日本丰满护士bbw| 又黄又爽国产免费网站在线观看| 惠民福利国产AV无码专区亚洲AV毛片搜| 亚洲精品手机在线视频| 久久无码私人网站| 绯色AV视频精品一区二区| 国产日韩欧美中文一区| 俄罗斯aaaaa特级毛片| 久久国产午夜精品免费一区二区| 亚洲国产精品香蕉视频| 奶茶视频APP黄在线播放| 人妻撑开合不拢流出白浆视频| 奇米777四色欧美精品| 国产免费女明星色视频| 国产白浆在线视频网| 中文字幕av美利坚合众国无码| 日韩一区二区在线视频| 老赵揉着粉嫩的双乳太舒服了秀婷 | 了解最新国产精品视频一区二区三区经 | 好了AV第四综合无码久久| 秋霞久久女婷五月综合色啪| 国产又粗又长又爽黄又硬视频 | 亚洲精品无码av国模| 老赵揉着粉嫩的双乳太舒服了秀婷| 日韩久久精品一区二区| 日日摸夜夜添无码无码a∨| 国产精品青青草原免费无码中国 | 啊灬啊别停灬用力啊黑人| 成人久久免费视频| 欧美日韩国产精品动漫精品| 亚洲欧洲在线观看无码| 国产成人精品影院网站不卡| 污污视频免费网站| 国产看片在线观看一区| 精品人妻挤奶一二三四区| 色偷偷AV永久无码精品无码| 久久精品国产亚洲A∨未满十八| 国产又粗又猛又大爽又黄的软件| 欧美污污污久久久久久| 精品无码国产一区二区三区.闺蜜| 亚洲性爱视频网站一级看片| 亚洲人成aⅴ在线播放橙子| 亚洲人成色7777在线观看不卡| 亚洲Av秘无码一区二区| 欧美粗大猛烈18p图| 亚洲av日韩国产激情| 大陆日韩欧美成人| 五月综合婷婷欧美| 精品久久久久久无码福利片| 久久久久久久久久久精品| 国产精品青青草原免费无码中国 | 欧美成人aa久久狼窝五月 | 亚洲 综合 视频 一区| 久久精品动漫| 很很鲁免费视频在线观看| 国产亚洲精品A片1000| 澳门精品久久国产电影| 成人欧美视频免费看黄黄| 成人无码h肉动漫在线观看站| 亚洲人成aⅴ在线播放橙子| 国产成人av麻豆精品| 色综合精品视频在线| 日本一区二区三区在线视频观看免费 | 亚洲欧美日韩制服综合| 成人3d动漫一区二区三区| 野花社区观看免费观看视频6大全| 精品国产亚洲人成在线传媒| 久久国产中文字亚洲幕| 一级免费十八岁无毛毛片视频| 亚洲午夜久久久久无码| 国产精品剧情在线蜜臀| 欧美性生活视屏精品| 亚洲精品无码不卡在线播放HE| 国产三级片大全网| 在线观看精品一区二区三区| 国产一级大片免费视频| 性欧美亚洲第一综合天堂另类专 | 成人自拍视频在线观看| 国产日韩欧美啪啪色| 理论片在线免费观看| 亚洲日韩欧美aⅤ精品| 蜜臀久久精品国产亚洲av| 欧美在线免费亚洲| 永久免费观看的片毛视频| 国产亚洲综合秋霞影院国产| 欧美激情四射一区二区在线| 国产99视频免费精品| 国产精品人人爽人人做| 欧美巨大激情久久久| 男女高潮吃奶添下面动态图| 丝袜美足国产一区在线| 最新久久高清精品| 国产免费午夜福利在线播放92| 精品区一区二在线观看| 污视频网站日本免费| 国产性欧美疯狂猛交69hd| 老子影院午夜伦手机不卡无码| 色偷偷AV永久无码精品无码| 一区二区三区无码精久久| 高潮抽搐流白浆视频在线观看| 美人+妻+影音先锋| 亚洲va在线va天堂va国产2020| 天天看天天噜噜噜在线视频| 国产91久久精品一区二区九色| 日韩欧美一级成人片免费| 377p欧洲日本亚洲大胆噜噜| 欧美日韩在线视频h| 亚洲日本精品va中文字幕| 1024大香蕉手机看片| 国产日韩综合一区二区性色?Ⅴ | 久久精品99无色码中文字幕| 国产美女裸乳无遮挡网站| 特级毛片?级毛片在线播放 | 野外一级爱做片免费观看| 亚洲色大全在线视频观看| 污软件在线观看软件| 日本久久高清一区二区三区| 久久国产午夜精品免费一区二区 | 中文一区二区视频成人二区| 在车里被弄了4次高潮| 国产换脸二区手机影院| 精品国产亚洲人成在线传媒| 91久久久久久国产免费| 成人精品aaa亚洲丝袜在线观看| 黄色成人在线播放| 亚洲人成日本片| 日韩在线欧美在线一区二区三区 | 国产在线观看91精品| 成人自拍视频在线观看| 99RE8国产这里只有精品| 欧美影视一区| 亚洲一区二区麻豆AV| 草莓视频APP下载官方| 91视频欧美青青草| 欧美一级婬片A片无码专区野结衣| 国产色精品vr一区区三区| 亚洲色欲AV无码专区在线播放| 国产av亚洲v天堂av| 国产第一页草草影院ccyy| 亚洲午夜电影欧美整片sss| 欧美亚洲国产另类在线| 全免费a级毛片免费| 亚洲成片观看四虎永久网站| 曰本大码熟中文字幕| 在线免费观看国产视频| 相泽南作品在线观看| 96久久自偷自偷国产精品| 日韩免费不卡视频1| 欧美精品日韩精品在线| 夜夜操综合网| 久热国产精品视频一区二区| 国产50部艳色禁片无码国产麻豆精品一区二区三区 | 亚洲av午夜福利无码精品一区| 日韩欧美在线观看一区二区三区| 亚洲?V伊人久久综合密臀性色| 国产无码不卡视频| 欧日一道本dvd在线无码| 国产在线播放线视频免费| 免费A级毛卡片不收费视频| 国语自产精彩视频在线视频| 国产欧美一区二区日本加勒比| 亚洲一级日本在线播放| 亚洲在AV极品无码天堂| 免费日韩视频| 884aa四虎影成人精品| 免费高清国语自产拍视频在线不| 亚洲av中文aⅤ无码av电影| 成人中文字幕亚洲乱码| 欧美三级日韩国产在线观看| 午夜视频成在线人成在线人| 无遮挡又黄又刺激在线视频| 久久99热免费精品久久| 国产色精品vr一区区三区| 免费夫妻生活片av| 欧美狠狠入鲁的视频| 久久久久久av无码专区| 日韩国产精品99久久久久| 日韩成人精品视频自拍| 国产精品看片在线| 日本特黄特色大片免费在线观看| 大地免费资源| 国产看片在线观看一区| 色吧超碰97人妻| 把腿张开乖我添你3p| 黄色一级国产精品| 狠狠久久久精品| 另类小说图片区日本久久大视频 | 久久久久国色aV免费软件| 野外一级爱做片免费观看| 国产精品欧美日韩视频播放一区| 日韩欧美偷拍精品一区| 成人无码h肉动漫在线观看站| 久久久久av綜合網成人| 作爱激烈叫床视频| a级高清毛片视频免费观看| 日韩午夜在线高清成人| 日日噜噜噜夜夜爽狠狠视频| 激情在线日韩欧美日韩| 天堂成人在线视频| 91无码久久国产线看观看hd| 91精品国产综合久久久亚洲日韩| 欧美精品第56页| aⅴ色窝窝男女爽爽a片| 一级?性色生活片毛片| 日韩特黄精品一在线看| 亚洲一级a无码毛片中文国产| 熟妇av日韩不卡| 国产欧美日韩视频一区在线观看| 国产一级a毛一级a看免费视频国产suv精品一区二区6 | 欧美激情在线播放一区二区 | 国产第一页草草影院ccyy| 午夜三级理论福利电影| 秋霞在线手机国产在线| 欧美综合在线观看日本| 天堂在线中文最新版地址| 亲亲发出吧唧吧唧的声音| zayou亚洲福利一区| 人妻丰满妇岳av无码区HD| 1024在线看片你懂的| 亚洲成Av人片乱码色午夜在线| 亚洲三区欧美一区二区在线| 宋雨琦ai人工智能造梦| 444kk免费看片在线观看| 国内9l视频自拍老熟女九色| 91超级好看一区二区三区| 国产精品熟女第7页| 亚洲影视AV一二三| 偷拍亚洲综合二区| 免费网站看v片在线毛| 亚洲一区二区三区日韩国产| 国产成a人亚洲精v| 久久99人妻精品涩爱噜噜噜蜜臀| 无遮挡美女18禁免费啪啪| 国产精品va在线观看my | 深夜福利视频在线一区| 91天堂一区二区三区在线| 电影《色戒》未删减版| 亚洲人成人一区在线观看| 中国一级免费黄色电影| 久久伊人免费视频| 日韩精品一级一区| 久久99人妻精品涩爱噜噜噜蜜臀| 亚洲AV乱码一区二区三区按摩..| 日本无码一区AⅤ二三区超碰| 成人限制第一页| 女佣的味道hd中字在线观看| 午夜宅男视频| 成人片在线观看亚洲欧美| 国产激烈刺激网站免费观看| 国产欧美亚洲精选视频| 欧美日韩一二区在线观看| 亚洲人看A∨免费片| 插曲免费的视频大全影视 | 日韩免费福利一区八区| 91丨九色丨蝌蚪3p| 正在精品视频第一页| 影音先锋国产精品天堂| 日韩中文无线码免费观看| av天堂av亚洲啪啪久久无码| 女银行员暴行办公室| 大又大粗又爽又黄少妇毛片视频| 欧美午夜福利视频| 亚洲午夜福利精品一区| 黑人处破女免费播放| 亚洲制服精品一区二区三区| 日韓中文字幕無碼高清毛片| 九九在线观看高清免费| 精品亚洲精品在线观看| 春色 都市 亚洲 小说区| 在线亚洲資源免費看| 精品国产乱码久久久久久166| va在线看国产免| 无码日韩做暖暖大全免费| 菠萝菠萝蜜免费影视在线观看| 国产精品网站 夜色| 精品国产你懂的在线看| 亚成人欧美在线观| 亞洲一區二區三區免費觀看| 国产毛多水多女人A片色情| 日日插人人插天天插| (凹凸)青草制服丝袜一区第一页| 一级毛片大学生九九精品视频| 丰满熟女亚洲图片综合图区| 亚洲影库日韩久久久| 精品国产三级AV在线视色 | 美女黄又色高清视频免费| 欧美日韩三级在线观看| 国产成人精品亚洲二区| 一区二区三区无码精久久| 成人综合在线视频免费观看完整版| 最新欧美极品一区二区三区| 国产曰韩ai一区二区三区| av日韩在线观看一区二区三区| 91久久打屁股調教網站| 国产性夜夜春夜夜爽1a片| 69国产成人精品午夜福无毒| 国产精品欲AV麻豆网站| 成全影视大全| 四虎永久在线免费视频一二区| 免费观看丰满少妇一级毛片| 久久精品国产精品亚洲艾草| 美女我无遮挡被艹网站自慰| 丝袜美足国产一区在线| 国产一线在线观看| 国产日韩男女激情视频免费播放| 天堂a亚洲国产色久在线| xxxx欧美丰满大屁股| 日韩国产亚洲欧美有码| 国产白浆在线视频网| 亚洲精品种子网站在线观看 | 日韩在线欧美观看| 午夜精品九九九九99蜜桃| 三级在线看中文字幕完整版| 99亚洲视频网站| 国产乱婬AV麻豆剧传媒牛牛影视| 免费精品一区二区中文字幕| 国产午夜精品草莓一区二区三区| 国产福利影视一二三区导航| 丁香婷婷深情五月丁香中文字幕 | 91伊人久久大香线蕉网站| (愛妃)久久AV无码精品人妻出轨| 欧美性爱激情| 婷婷丁香性爱| 中文字幕人妻毛片av| 久久精品国产国产精品久久| 自拍影视无码免费| 把腿张开乖我添你3p| 国产91黑人在线| 办公室a片在线观看| 色噜噜狠狠狠狠狠色综合| 日本www成人网站在线观看| 中国毛片在线观看| 夜夜高潮夜夜爽精品视频| 日本www成人网站在线观看| 亚洲精品久久久久毛片A级牛奶| 亚洲精品国产专区在线| ▓草莓视频在线观看▓| 欧洲亚洲成人精品| 五月开心中文版在线观看| 国产精品丝袜亚洲熟女蜜月| 中文字幕一区日韩无码| 亚洲黄色AV电影在线不卡| 欧美三级日韩国产在线观看 | 黄色大片一级毛片视频| 妇搡BBBB精品一区二区| 年轻的朋友3完整版在线观看| 亚洲最新无码av网址| 白洁老师国产麻豆片| 欧美狂野视频在线精品| 午夜福利男女xx00视频网站| 亚洲伊人成久久综合网| 青青草中国三级片| 国产成a人亚洲精v| 日韩免费福利一区八区| 日韩av手机在线观看| 一起嗟嗟嗟免费观看短片| 精品一区二区三区免费在线视频| 高清偷自拍亚洲精品三区| 天美传媒国产精品果冻| 亞洲歐美日韓中文字幕首頁| 爱福利秒拍国产导航小视频| 一级二区在线观看国内精品三级| 老司机影音先锋日本网站在线| 丁香亚洲综合五月天婷婷| 精品二区三区在线观看| 国产高清乱码无卡女大生| 国产精品a久久久久| 一级做a爰片久久毛片潮喷无码| 欧美一区二区在线播放免费播放 | 国产精品国产三级国产午| 国产欧美亚洲精选视频| 久久久精品3d动漫一区二区三区| 午夜色a大片在线观看免费| 永久免费观看啪啪网站欧美| 91无码偷拍精品一区二区三区| 午夜福利啪爽国产片精品| 亚洲国产自久久婷婷| 精品自拍一區| 国产成人真人片亚洲精品不卡| 久久综合网欧美色妞网| 欧洲精品aaa一区二区| 日韩午夜不卡在线看| 中文字幕一区二区人妻本田岬| 亚洲全部无码中文字幕| 国产三级片大全网| 97久久国语露脸精品对白| 国产成人剧情?v麻豆映画| 中文字幕AV二区| 又黄又爽免又刺激费视频网站| 97视频人人做人人爱免费体验| 精品国产午夜在线| 国产福利一区99| 中文日无码在线观看| 日韩精品熟女AA久久毛片| 久久这里有精品视品| 九色91POPNY蝌蚪新疆| 日韩在线试看一区96丝袜| 成人3d动漫一区二区三区| 美女我无遮挡被艹网站自慰| 音影先锋男人在线资源网| 高清偷自拍亚洲精品三区| 中文字幕一区二区人妻本田岬| 不卡av中文在线观看| 亚洲国内精品久久久久电影院| 在线不卡一区二区三区免费| 日韩在线精品一二三区| 好大好硬好深好爽视频h| 中文字幕日韩亚洲视频在线| 6080YYY午夜理论片免费| 双腿被绑成M型调教PⅠAY照片| 亚洲人成网站在线播放青春| 久久五月一区二区精品| 亚洲日韩av免费在线观看| 成年人在线观看网站| 亚洲āV无码专区国产乱码不卡| 国产精品自偷自拍| 日韩美女高清视频在线观看| 久久夜色精品国产亚洲| 亚洲欧美一区二区三区69 | 国产不卡免费在线视频| H片在线播放免费观看| 国产露脸无码a区久久蘑菇| 成人高清影院| 香蕉国产人午夜视频在线| 奇米一区二区三区四区久久| 日韩欧美一区二区精品久久asspics人体japanese | 成人无码av一区二区三区| 一本久道久久综合网| 草莓视频污污污版下载| av无码三级片在线播放| 国产精品小姐久久久久久| 天天躁夜夜躁狠狠躁综合真实| 国产性欧美疯狂猛交69hd| 16处破外女出血视频在线观看| 精品自拍自产一区二区三区免费| 亚洲国产自久久婷婷| 狠狠躁狠狠躁东京热无码| 69精品久久日日躁夜夜躁| 天天摸日日摸狠狠添高潮喷| 人妻夜夜爽天天爽4区| 国产香蕉成人综合精品视频| 中国激情一区二区三区成人| 亚洲欧美日韩中文高清| 在线播放亚洲黄片| 性感日韩在线视频观看| 中文字幕免费日韩中文中文| 亚洲综合无码一区二区三区四区| 亚洲女人自熨在线视频| 亚洲成人一区久久| 日韩中文无线码免费观看| 亚洲精品欧美综合久久| 图片区小说区另类春色蜜芽| 久久大屁股白浆一区二区| 亚洲av无码不卡无码| 久久九九精品视频| 国产私人尤物无码不卡| 亚洲色欲AV无码专区在线播放| 18进黄址app最新版| 精品久久久久久无码人妻外国| 国产精品无码久久AV嫩| 丝瓜草莓www在线观看| 国产一级二级三级免费| 亚成人欧美在线观| 青春草五月天婷婷欧美日韩| 日本美国一级大片| 999免费观看四虎精品国产| 久久精品无码亚日韩免费影视观看中文 | 欧美污污污久久久久久| 国产av无码变态另类专区| 亚洲人看A∨免费片| 北条麻妃青青久久av| 99国内精品久久久久久| 亚洲日产精品一二三四区| 欧美在线三级艳情网站亚洲成人99 | 电影《色戒》未删减版| 久久频这里精品香蕉久久| 婷婷伊人久久大香线蕉AV| 久久九九精品视频| 久久99国产精品精品国产同意| 亚洲欧美另类久久| 国产精品va在线观看my| 在线亚洲資源免費看| 女人十八毛片免费观| 久久99国产精品二区不卡 | 日韩产品和欧美产品的区别| 9久热在线精品996热视频观看| 91丨九色丨蝌蚪3p| 惠民福利国产精品无码aV一区二区三区 | 日韩精品熟女AA久久毛片| 亚洲第一天堂日韩| 日本中文精品在线观看| 二次元人物桶二次元人物免费网站| 办公室a片在线观看| 18禁黄网站禁片无遮挡观看APP免费| 快描人成app免费| 欧美成人国产精| 日韩一区二区在线视频| 成人无码视频在线观看| 成人a一级毛片免费看视频| 黑人粗大区一区二视频| 亚洲午夜无码电影| 亚洲中文字幕一区二区三区在线91 | 无码日韩做暖暖大全免费| av日韩色情三级在线看|